1.1 General Description 总则 1.1.1 Consist of the Specification 本规格书组成 The specification including general, hull structure, outfitting, machinery, electrical, refrigerating, air conditioning, ventilating, pipelaying, DP, and crane parts describes the 3600t CRANE PIPELAYING VESSEL based on scheme design.
本规格书由船舶总体、舾装、轮机、电气、通风冷藏空调、动力定位、起重机及铺管设 备估价等部分组成,表述 3600 t 全回转起重工程船的主要技术规格方案。

1.1.2 Construction Explanation 建造说明 The BUILDER’s supply covers the item described in this specification, anything excluding from the scope of the specification will be supplied by the OWNER.
本船的建造估价,所有规格书所规定的项目均由建造方提供。超过规格书部分船东提供。

1.1.3 Language and Measuring Unit 文种与计量单位 The drawings, instructions, instruments, display, caution sign and nameplate shall be written in English and kept down the foreign nameplate of the importation of machine and equipments. Metric system is used for designing and fabricating of hull, crane and equipment etc. unless otherwise specialized in specification or instruction.
本船的图纸、使用说明书、仪表、显示、警示牌和铭牌等均以英文书写。进口机械、设备 保留原来外文铭牌。 船体、起重机、机电设备等设计和建造,除非在规格书或说明书中特别表明,均采用公制 计量单位。

1.2 General Description 船舶航区及用途 1.2.1 The Sailing Area and Functions 船舶航区及用途
The vessel is designed as a large-scale all revolving self-propelled vessel. The vessel is used for offshore projects. 本船是一艘自航大型全回转起重工程船,航行于无限航区。 本船主要用于海上海洋工程等作业。

1.2.2 Type of Vessel 船型
The vessel will be a steel, all welded crane ship with streamline bow, round bilge and bilge keel. A helicopter platform will be situated at forecastle deck. One (1) full revolving crane to be installed in the after area of deck. The vessel will be equipped with two (2) 2000kW tunnel thrusters at bow, two (2) 2500kW retractable azimuthing thrusters at the foreship, two (2) 4500kW azimuthing thrusters at the aftship. The dynamic positioning system is GL DYNPOS–AUTR class. 本船是一艘钢质、全电焊起重工程船。设流线型首,尾部纵向及舭部有圆角,设舭龙骨。 船首设居住区及直升飞机起降平台。 船尾设置一台全回转吊机。 首部设 2 台轴隧式侧推装置,功率 2×2000kW;设 2 台伸缩式全回转螺旋桨推进器,功
2/91

REVOLVABLE CRANE 3600T 率 2×2500kW。

TECHNICAL SPECIFICATION

尾部设 2 台全回转螺旋桨推进器,功率 2×4500kW。 本船动力定位具有 GL DYNPOS–AUTR 模式控制。

1.3 Classification, Rules and Certificate 船级规范和证书 1.3.1 Classification and Rules 船级及规范 The vessel, which including the hull, engine, electrical and special equipments, shall satisfy the latest requirements of the current international convention, regulations and GL rules and regulations, and enter into the classification, obtaining the following class notation: 本船(包括船
体、轮机、电气及特殊设备等)应满足现行有关的国际公约、规则和船级社(GL)现行有关规 范、规则的最新要求并入级,取得船级符号如下:

1A1 R0 Pipe Laying Vessel,Crane Vessel,DYNPOS AUTR Following international convention and regulations will be complied: 现行国际公约和规则
如下:

? International Convention for the Safety of Life at Sea, 1974 and Protocol of 1978 Relating and Amendments of 1981, 1983, 1988 and 1996
1974 年国际海上人命安全公约及 1978 年议定书和 1981 年、1983 年、1988 年及 1996 年修正 案

? International Convention for the Prevention of Pollution from Ships, 1973, Protocol of 1978 Relating and Amendments of 1992
1973 年国际防止船舶污染公约、1978 年议定书及 1992 年修正案

? International Convention for Preventing Collisions at Sea, 1972 (Amendments of 1982)
1972 年国际避碰规则(1982 年修订本)

? International Convention on Load Lines, 1966
1966 年国际船舶载重线公约

? International Convention on Tonnage Measurement of Ships, 1969
1969 年国际船舶吨位丈量公约

? GL Rules for stability requirements for heavy lift operations.
GL 规范关于起重作业的稳性计算

? Applicable current Rules and Regulations issued by GL
现行的 GL 规则和规范。

1.3.2 ? ? ? ? ? ?

Certificates 应取得如下证书: International Tonnage Certificate 国际吨位证书 International Load Line Certificate 国际船舶载重线证书 Classification Certificate for Hull 船舶入级证书 Seaworthiness Certificate 船舶适航证书 Ship Safety Construction Certificate 船舶结构安全证书 Ship Safety Equipment Certificate 船舶设备安全证书
3/91

REVOLVABLE CRANE 3600T

TECHNICAL SPECIFICATION

? Ship Safety Radio Certificate 无线电安全证书 ? Accommodation Space Certificate 居住舱室证书 ? International Oil Pollution Prevention Certificate 船舶防油污染证书 ? Lifting Appliances Certificate 起重设备证书 ? Live Saving Equipment Certificate 救生设备证书 ? Safety Certificate for Special Purpose Vessel 特种用途船舶安全证书 1.4 Working Condition of the Crane 起重机作业条件 Water depth 8~300m Significant wave height approximately 2.5m Wind velocity 17.1m/s Flow velocity 3kn Environment temperature -20℃~45℃ Tied back Trim 1.5 ° , heel 1.5° Revolving Trim 3.5 ° , heel 3.5° Dispatch pitch 10 ° , roll 20° The crane can luff, hosite and revolv separately. (Explain and elaborate more)
水深 有义波高 风速 流速 环境温度 纵吊 4400t 横吊 3600t 调遣 8—300m 约 2.5m 17.1m/s 3kn -20℃~45℃ 纵倾 1.5°,横倾 1.5° 纵倾 3.5°,横倾 3.5° 纵摇 10°,横摇 20°

起重机可以分别带载变幅、起升及旋转。(需要更进一步详细解释说明)

1.5 Main Technical Parameter and Function 主要技术参数及性能 Loa approximately 174.80m Lpp 165.00m Breadth molded approximately 48.00m Draft molded 15.00m
Draught Crane lifting draught Pipe laying draught Navigation draught Speed (trial condition) Routed Speed with normal weather conditions) 8.00~10.00 m 7.00~8.00 m ~6.60 m ~12.0 kn. ~11.5 kn (min. speed to be expected at sea

Accommodation

250 persons
4/91

REVOLVABLE CRANE 3600T

TECHNICAL SPECIFICATION

Crews 60p, clients 15p, operators 15p, constructors 150p, emergency 10p
总 型 型 长 Loa 宽B 深D 起重作业 铺管作业 航行状态 试航速度 调遣航速 床 情况 10 人 位 ~174.80 165.00 ~48.00 15.00 m m m m 垂线间长 Lpp

设计吃水 8.00~10.00 m 7.00~8.00m ~6.60 ~12 kn ~11.5 kn(正常航行天气下的最小海上航行速度) 250 个 m

其中:船员 60 人、客户人员 15 人、操作管理人员 15 人、建造分包方 150 人、应急

Navigation area Self-sustaining Freeboard Between decks Camber Frame spacing
航 干 梁 区 舷 拱 自 持 力 甲板间高 全船肋骨间距

unrestricted navigating space 60 days approximately 5.0m approximately 3.2m total 5 floors 0m 700mm
无限航区 60 天 ~5.0 m ~3.2 m 0 m 700 mm 共5层

Lifting capacity and particulars Boom length: main hook 80m Aux.#1hook 95m Aux.#2hook 105m Hook capacity: Mainhook slewing 3000 tons×30m Mainhook fixed 4400 tons×37m Aux#1hook 550 tons×95m Aux#2hook 100tons×109m Whip 25t×4sets Hydraulic crane: 2 sets 200Kn× 15m
全回转起重机起重能力及参数: 臂架长度:主钩——80 m
5/91

REVOLVABLE CRANE 3600T 辅钩——95 m

TECHNICAL SPECIFICATION

小钩——105 m 吊钩负荷:主钩全旋转吊 主钩固定吊 #1 辅钩 #2 辅钩 索具钩 : 设 200kN×15m 液压克令吊 2 台。 3000 t× 30 m 4400 t× 37 m 550 t × 95 m 100 t ×109 m

25t×4 个(建议 20tx2 个,待和用户讨论)

1.6

General Description 总布置概述

Upper deck will be a continuous deck. The 3600t slewing crane will be installed on aftdeck. Deck house will be on the forecastle deck. There will be seven water tight transverse bulkheads under the upper deck to divide the main hull into eight watertight compartments. Before collision bulkhead, there will be forepeak as a ballast tank, anchor chain box and bow thruster room will in it under the upper deck. In the accommodation there will be single-berth and double-berth cabins with sanitary unit. Summary of arrangement of decks is as following: 本船上甲板为连续甲板,尾部设 3600t 全回转起重机 1 台,首部设有短首楼和甲板室。 上甲板以下由 7 道水密横舱壁将主船体分隔成 8 个水密舱段。防撞舱壁前上甲板下为首尖舱 兼压载水舱,其内设置锚链舱及首侧推舱。居住舱室中,单人双人住室均配置独立的卫生单 元。各层甲板布置如下:

1.6.1 Under Double Bottom 双层底下
Double bottom will be constructed between the two longitudinal bulkheads. There will be some ballast tank, fuel oil tank, lubricate oil tank, sewage and dirty oil tank etc, in the double bottom, and pipe tunnel will be at the each side of it. 边舱以内设双层底,主要布置压载水舱、燃油舱、滑油舱、污水舱及污油舱等液体舱室。 并在双层底内左右设管隧。

1.6.2 On Double Bottom 双层底上
There will be thruster room, engine room, auxiliary boiler room, air compressor, pump room, ballast water tank, fuel oil tank etc. The side tank (out side of each longitudinal bulkheads and without double bottom) will be some ballast tank, fresh water tank, potable water tank etc. 设尾舵桨舱、机舱、辅锅炉舱、空压机舱、各种泵舱和压载水舱、燃油舱等液体舱室。 边舱(每道纵舱壁外以及无双层底)主要设置压载水舱、淡水舱、饮用水舱等。

1.6.3 Middle Deck 中间甲板
Fore and aft side tank will be arranged as mooring position winch room. Middle side tank will be as ballast water tank. Between the longitudinal bulkheads there will be store room, aft hydraulic pump room, refrigerant, air-condition, refrigerator etc. 首尾边舱主要设置定位绞车舱,船中边舱为液体深舱。在两道边纵舱壁内中后部设置储 物舱、尾液压泵站、索具舱等。前部设置冷冻、空调机室、储物舱、冷库等。

1.6.4 Inboard Platform(Fr.172~Fr.224) 舱内平台(#172~#224)
There will be gymnasium, clothing locker, construction sub-contractor galley, mess room,
6/91

REVOLVABLE CRANE 3600T toilet and shower room.

TECHNICAL SPECIFICATION

在两道边纵舱壁内#172~#224 区域设舱内平台,设置健身房、更衣室、施工人员厨房、 餐厅以及浴室厕所等

1.6.5 Upper Deck 上甲板
Upper deck is a continuous deck. The 3600t slewing crane will be situated on the aft deck. In the crane tub there will be acetylene room, oxygen room, CO2 room, lamp room, paint locker, welding machine room, deck store, constructor anteroom etc. The pipelaying work room will be on the starboard deck from aft end to fore. Anchor racks, 2 mooring winch, fairleaders, and bollards will be fitted on both side of the deck. Port side of the forecastle will be accommodation area. There will be three (3) 4P cabins, one (1) 22P office, one (1) 2P office, and hospital, doctor cabin, change room, shower room, lavatory, laundry, drying room etc. Some other space such as clothing locker, photo dark room, store, air-condition room will also be arranged in the accommodation area. On the both side of fore deck position working guide wheel room will be arranged. 上甲板为连续甲板,尾部设 3600t 全回转起重机 1 台,起重机圆筒内设置乙炔室、氧气 室、二氧化碳室、灯具间、油漆间、电焊机室、甲板物料间、施工人员休息间等工作用舱室; 右舷设铺管舱,自首延伸至尾甲板;舷边两侧设定位锚架;设系泊绞车 2 台,并配导缆钳、 带缆桩等必要的系泊设备。首楼左舷的居住、生活舱室内设置施工人员的 3 间 4 人室;22 人 办公室和 2 人办公室各 1 间;设置医务室 1 间、医生室 1 间,以及更衣室、浴室、厕所、洗 衣房、干衣间等。配套设置拍片冲洗室、被服间、空调器室、储藏室等生活必需的舱室。首 楼前端两侧为定位作业导向轮舱,舷外设定位锚架。

1.6.6 A Deck A 甲板
A deck will be in the forecastle as accommodation quarters. There will be ten (10) 4P cabins, pray room, galley, 70P mess room, 24P guest mess room, 50P meeting room, 12P meeting room etc. Lavatory, shower room, laundry, drying room, air-condition room will also be in this area. On the starboard fore deck emergency generator room and fore hydraulic pump room will be arranged. 处于首楼内为居住、生活舱室。设施工人员 4 人室 10 间,祈祷室 1 间,船员厨房 1 间, 船员餐厅 1 间,可供 70 人同时用餐,来宾餐厅 1 间,可供 24 人同时用餐;50 人大会议室 1 间,12 人小会议室 1 间;为船员配套设置厕所、浴室、洗衣房、干衣间、空调器室等生活必 需的舱室,首端右舷设置首液压泵站和应急发电机室。

1.6.7 B Deck B 甲板(首楼甲板)
Hook box will be on the aft end of B deck. Two (2) life boats and liferafts will be fitted at both side of the deck. Accommodation quarter will be on the middle deck, and there will be twenty five (25) 4P cabins, air-condition room, store, lavatory, shower, laundry, drying room etc. The fore end deck is the mooring work area. In this area 2 anchor windlass, 2 mooring winches, deck crane, fairleaders, bollards will be installed. B 甲板后部设起重机搁置时存放吊钩所用的主钩箱和副钩箱各一个; 两舷各设置救生艇 2 艘,救生筏若干;中间设为居住甲板室,设施工人员 4 人室 25 间,空调器室 1 间,小储藏室
7/91

REVOLVABLE CRANE 3600T

TECHNICAL SPECIFICATION

若干以及厕所、浴室、洗衣干衣房等。甲板室前为甲板作业区域,设航行锚机 2 台,系泊绞 车 2 台,以及克令吊或其他相应的起重设备,并配导缆钳、导缆滚轮、导缆孔、带缆桩等系 泊设备。

1.6.8 C Deck C 甲板
C deck is crew accommodation area. Twenty three (23) 2P cabins, two (2) offices, air-condition, as well as change room, laundry, drying room, lavatory will be arranged in this area. C 甲板主要为船员居住甲板室。设船员 2 人室 23 间,小办公室 2 间、空调器室 1 间以及 船员更衣室、洗衣间、干衣间、厕所等。

1.6.9 D Deck

D 甲板

There will be seventeen (17) 2P cabins, five (5) 1P cabins, air-condition room, lavatory, laundry, drying room on the D deck. D 甲板主要为船员居住甲板室。设船员 2 人室 17 间,1 人室 5 间、空调器室 1 间以及厕 所、洗衣干衣间等。

1.6.10 E Deck E 甲板
There will be eight (8) cabin en suites, five (5) 1P cabin, one(1) 12P meeting room, one battery room, one charging and discharging room, and lavatory, laundry, drying room on the E deck. E 甲板设 1 人套间 8 间,1 人室 5 间,12 人会议室 1 间;蓄电池室和充放电间各 1 间;以 及厕所、洗衣干衣间等

1.6.11 Bridge Deck 驾驶甲板
A central control room will be on the bridge deck. In the control room there will be navigation console, mooring position console, DP console, ballast water console. 设驾驶、定位锚机控制、DP 控制、压载水控制等集中控制室。

1.6.12 Compass Deck 罗经甲板
Mast, antennae, searchlights, signal lights and the nameplate of the vessel are to be set. 设雷达桅杆、天线、探照灯、信号灯、船名牌等设备。

1.6.13 Helicopter Deck 直升飞机起降平台
The octagonal helicopter platform will be at the fore end of the vessel. It is suitable for SIKORSKY S-61 to take off and landing. Communication and navigation equipment, leading light, skid-proof grid, draining system will be fitted on the platform. 驾驶、集中控制室前方设八角形直升飞机起降平台,供 SIKORSKY 配通讯导航、灯光信号等设备及防滑网、排水设施 S-61 型直升机起降。

1.7

Tank Capacity 液舱容量 The capacity of the main liquid tanks shall satisfy the operating requirement and shall not less than the following: Ballast tank approximately 40000 m3 Fresh water tank approximately 2970 m3
8/91

REVOLVABLE CRANE 3600T

TECHNICAL SPECIFICATION

Fuel oil tank Lubricating oil tank Sewage tank Dirty oil tank for fuel oil Dirty oil tank for Lubricating oil
压载水舱 淡水舱 燃油舱 滑油舱 污水舱 燃油污油舱 滑油污油舱 ~40000m3 ~2970 m3 ~2300 m3 100 m
3

approximately 2300 m3 100 m3 200 m3 100 m3 25 m3

各种主要液体舱室容量均满足使用要求,并不小于下列容量:

200 m3 100 m3 25 m3

1.8 Stability, Trimming and Insubmersibiity 稳性与纵倾及抗沉性 1.8.1 Stability Requirement 稳性要求
The navigation stability of the vessel will be satisfied with the GL requirements. When in pipelaying and lifting operation mode, the adequate stability will be provided in case of sudden loss of the crane load, according with GL Rules. 本船航行稳性满足 GL 船级社对无限航区船舶的要求;铺管和起重作业稳性满足 GL 船级 社对相应作业工况的稳性要求。

1.8.2 Trimming 纵倾
The vessel will be designed so that in navigation condition, it will be floating approximately even keel, and ensured the main thrusters submerged under water. In operation condition, the ballast water is adjustable for required operating draught, and within the crane’s trim and list limits. 本船调遣航行时无首倾,且确保船尾主推进器浸没水中。作业时通过压载水的调整,达 到要求的作业吃水,并满足起重机的纵倾角和横倾角要求。

1.8.3 UNSINKABILITY 抗沉性
Damage stability of the vessel will satisfied with the requirements of CODE OF SAFETY FOR SPECIAL PURPOSE SHIPS for special purpose ship carrying not more than 200 special personnel. 满足《特种用途船舶安全规则》对少于 200 名特殊人员的特种用途船舶的破舱稳性要求。

1.9 MATERIAL, WORKMANSHIP AND STANDARD 材料、工艺及标准 1.9.1 Material 材料
Materials, machines and equipments of the hull shall satisfy the requirements of the GL. 船体结构材料、机械和设备的材料均须满足 GL 船级社的要求。

1.9.2 WORKMANSHIP 工艺
All workmanship entering into the construction of the vessel will be in accordance with SCQS CHINA SHIPBUILDING QUALITY STANDARD (1993) and the Builder’s latest advanced
9/91

REVOLVABLE CRANE 3600T

TECHNICAL SPECIFICATION

standard and practice which is complied with ISO quality control system for ship building. The workmanship book will be made by the Builder, and subject to the approval of GL supervisor. 所有为船舶的建造而采用的工艺,应该按“SCQS 中国造船质量标准(1993)”和建造方先 进的、优秀的并符合 ISO 质量管理体系的船舶建造工艺标准进行。建造厂应按照本厂的造船标 准和惯例编制建造工艺手册,并征得 GL 验船师确认。

1.9.3 Standard 标准
Material, machinery and equipment in the designer’s selection will be in accordance with GL approval standard, unless otherwise specialized. 设计选用的材料、机械和设备除经特别认可外,应符合 GL 认可标准。

1.10 Drawing 图纸
The drawing designed by the designer shall be censored and approved by the GL. 设计方完成的设计,应取得 GL 审查批准。

1.11 Inspection, testing and sea trial 检查、检验、试验及试航
The vessels construction, machineries, outfits and equipments shall be inspected and tested. All inspect, test and trial shall be carried out in accordance with GL Rules, Regulations, as well as mooring, lifing operation and sea trial program. 船舶结构、机械、舾装设备等都需要进 行检查与试验。检查、检验、试验及试航按 GL 的规范、规则、规程中的有关要求及系泊、航行 试验大纲与吊重试验大纲进行。

10/91

REVOLVABLE CRANE 3600T 2. HULL PART 船体部分 2.1 GENERAL 概述

TECHNICAL SPECIFICATION

The vessel to be of all steel-welded construction, single deck, double bottom, and single shell, including main hull, super-structure (forecastle and deck house) and helicopter deck etc. The vessel have three continuing longitudinal bulkheads (Center Long. Bulkhead and two Side Long. Bulkheads) under Main Deck and seven (7) Transverse Bulkheads in way of main hull. There are to have continuous Platform Decks below the Main Deck (For fore and aft. Part, other Platform may be located to arrange accommodation cabin, public living service, working cabin and facility etc.). The vessel will be constructed in accordance with GL requirements. The scantlings of structures shall be in accordance with GL rules, considering the requirement of practice use. Special structures are to be designed by local strength analysis, and be properly strengthened. As an ocean working vessel, the vessel hull to be have enough strength and stiffness, and some safety margin. 本船为钢质全焊接、单甲板、双底、单壳结构,包括主船体、上层建筑(首楼和甲板室) 和直升飞机平台三大部分。主船体部分主甲板下到船底设有三道首尾贯穿的连续纵壁(中纵壁 和两道边纵壁) 道水密横舱壁。主甲板以下设有连续的中间甲板(首尾部另设舱内平台布置 ,7 居住舱室、公用生活设施和工作舱室及设备等) 。 本船船体结构依据 GL 现行有关规范、 规则的最新要求进行设计与建造。 船体结构主要构件 尺寸通过规范计算并结合总强度及使用要求确定,特殊构件通过局部强度分析确定,并作适当 加强。 本船为海洋工程船,船体具有足够的强度和刚度,并有一定的安全储备。 2.2 MATERIAL AND SCANTLING 船体材料与结构 2.2.1 MATERIAL OF CONSTRUCTION 船体材料 The chemical components and mechanical performance of the steel to be in accordance with the requirements of GL rules, and shall be provided material certification and testing reports. Base materials provided by manufacturer, such as welding rod, welding wire and welding compound shall be approved by GL. The welding materials to be fitted to the steel grades according to welded position. 本船船体结构钢材的化学成分和力学性能应符合 GL 船级社的相关规定,并提供 GL 产品认 证证书和材料试验报告。 本船船体结构所用的焊条、焊丝和焊剂等焊接材料应由经 GL 认可的生产厂家生产,其力 学性能应符合规范有关章节的要求,并经 GL 认可。所选用的焊接材料应与船体结构钢材级别 及焊接部位相适应。 The main steel plates for hull will be Chinese made (certified GL) and different grade according to different area and requirement. And will specify it in structure design later.
11/91

REVOLVABLE CRANE 3600T

TECHNICAL SPECIFICATION

本船船体钢料可由中国制造(需取得 GL 证书) ,船体不同的区域根据规范的要求使用相应的钢 级。在以后的结构设计中会标示出来。 2.2.2 HULL STRUCTURES 船体结构 2.2.2.1 HULL STRUCTURE SYSTEM 船体结构骨架系统 Except the fore peak, the main hull to be built with longitudinal framing system (including main deck, tween decks, platforms, double bottom, longitudinal Bulkheads, shell etc.); the stiffeners of seven (7) transverse bulkheads to be arranged in vertical direction. The transverse web frame to be set every four (4) frames space (700x4=2800mm) to support longitudinal members, (each transverse web frame consisting of decks or platform web beams, vertical stringers on longitudinal Bulkhead, side web frames, horizontal stringers and bottom floors etc.), shall be have enough transverse strength. The fore peak also to be built with transverse framing system. Forecastle and deck house to be transverse framing system. The longitudinal continuous members to be provided from fore to aft. as soon as possible. The primary members shall be kept continuous and be strengthed if necessary interrupted. 本船主船体除首尖舱外,均为纵骨架式系统(包括主甲板、中间甲板、平台、双层底、纵 壁、 舷侧和船底) 全船 7 道横舱壁扶强材均垂向布置; ; 沿船长方向每 4 个肋位 (700 x 4=2800mm) 设置横向强框架(由甲板和平台强横梁、纵舱壁垂直桁、舷侧强肋骨、水平撑,底部肋板等组 成) ,以支撑纵向构件,并保证船体横向强度。首尖舱采用横骨架式。 首楼和甲板室采用横骨架式。 船体纵向连续构件尽可能自首至尾连续设置。船体主要构件应保持连续贯通,确需断开时 应作补偿加强。 2.2.2.2 MAIN DECK 主甲板 The main deck to be suitable to carry deck load and strengthed for a permissible unit load of 10t/m2. No camber and sheer in main deck. Deck longitudinals to be supported by transverses, and be continuous as far as possible. The longitudinal spaces are 650mm or 700mm. Two girders to be provided in the middle of main deck. The deck transvers spaces are 2800mm. 主甲板设计承载能力为 10t/m2; 主甲板不设梁拱与舷弧; 甲板纵骨由甲板强横梁支撑,在纵向尽可能保持连续,纵骨间距为 650mm 或 700mm; 甲板中部设置两道纵桁; 甲板强横梁间距 2800mm。

12/91

REVOLVABLE CRANE 3600T 2.2.2.3 SHELL PLATE 外板

TECHNICAL SPECIFICATION

Shell plates including bottom plate ,side plate and bilge plate to be longitudinal. Bottom longitudinal spaces are 650mm or 700mm. The bottom side girders be provided in way of transverse and spacing is not more than 2100mm. The keel plate and stem are to be joined together. The bilge longitudinals are to be fitted on bilge by radial direction. Its space is about 680mm. The thickness of shell plates in way of sea chests and anchor bolster etc. areas shall be increased properly in accordance with the Rule Requirement. The drain cocks to be arranged on shell in the bottom of deep tank and cofferdam for each liquid tank. 外板(包括船底板、舷侧板和舭列板)均采用纵向布置; 船底纵骨间距为 650mm 或 700mm,船宽方向不超过 2100mm 设置旁内龙骨; 平板龙骨与首柱有效连接; 舭部径向布置舭纵骨,间距约为 680mm; 海底门,锚支架等部位的外板按规范要求适当加厚; 在深舱和空舱区域的外板底部,每个舱均设置放水塞。 2.2.2.4 TWEEN DECK AND PLATFORM 中间甲板与平台 The tween decks and platforms to be arranged in different areas along longitudinal direction. The platforms and tween decks to be arranged in way of stern and engine room areas. The platforms, tween decks and part platforms to be arranged between main deck and bottom in way of middle part and stem. The deck longitudinal spaces is reference to main deck. The platform longitudinals to be supported by transverse webs. 本船沿船长方向在不同部位设置中间甲板与平台; 尾部及机舱区设置舱内平台及中间甲板; 中前及首部主甲板至船底间设置舱内平台,中间甲板及局部平台; 平台甲板纵骨间距参照主甲板纵骨布置; 平台甲板在横向强框架平面内设置强横梁支撑纵骨。 2.2.2.5 LONGITUDINAL BULKHEADS 纵舱壁 Three(3) longitudinal bulkheads to be arranged in main hull, and to be of plane type. These bulkheads to be continuous along longitudinal direction from the stern to the collision bulkhead of fore peak. The horizontal stiffeners to be arranged and supported by vertical girders in transverse webs on the longitudinal bulkheads. 主船体共设置 3 道纵舱壁,均为平面舱壁,纵向在尾部至首尖舱防撞舱壁保持连续; 纵壁扶强材水平布置, 由强框架平面内设置的垂直桁材支撑。
13/91

REVOLVABLE CRANE 3600T

TECHNICAL SPECIFICATION

2.2.2.6 TRANSVERSE BULKHEAD 横舱壁 Seven(7) transverse watertight bulkheads to be arranged in main hull. The transverse bulkheads to be of plane type with vertical stiffeners supported by horizontal girders, and stiffeners to be connected with brackets between bottom longitudinals and deck longitudinals. Horizontal girders, nearby vertical girders and side transvers to be joined together by tapered circular brackets gradually. 主船体共设置 7 道水密横舱壁, 均为平面舱壁; 横舱壁扶强材在甲板纵骨腹板平面内垂向布 置,舱壁扶强材与底部纵骨和甲板纵骨用肘板相连接; 横舱壁的水平桁端部以圆弧肘板的形式过渡与相邻纵壁垂直桁或舷侧强肋骨连接 2.2.2.7 PILLARS AND STRUTS 支柱和水平撑杆 Pillars to be set at the suitable position among two decks or platforms in main hull; Tubular pillars to be set at the suitable location among two decks in superstructure; The struts of H type to be provided for web frames and vertical girders of longitudinal bulkheads, at tween deck in both side deep tanks (from main deck to bottom) . 主船体在各层中间甲板或平台间在强框架平面内或适当部位设置支柱; 上层建筑结构中甲板间适当设置圆管型支柱; 两侧深液舱(自主甲板至船底)在中间甲板高度处,强肋骨与纵舱壁垂直桁之间设置 H 型水 平撑杆。 2.2.2.8 Foundation Structure of 3600t Crane 起重机基座区船体结构加强 Cylinder supporting structure with stiffeners to be arranged below main deck. For the larger bending moment and shearing force at the foundation of crane, longitudinal and transverse supporting bulkheads to be properly strengthened. 起重机基座区船体结构承受较大的弯距和剪力, 在主甲板以下设置加筋圆筒支撑结构, 并适 当设置纵向和横向支撑舱壁予以加强。 2.2.2.9 FORECASTLE AND DECK HOUSES 首楼和甲板室 There are five(5) deck houses in way of bow, including two(2) floors forecastle. And two(2) floors short deck house to be arranged above aft. of main deck. Forecastle and deck houses to be of transverse frame system, consists of longitudinal walls, transverse walls, girders, web beams, beams, and pillars etc.. The walls of deck houses and forecastleare to be of plane type with vertical stiffeners. Camber is to be arranged in way of navigation deck and compass deck. 首楼 2 层,首部有 5 层甲板室结构,尾部主甲板以上设两层短甲板室; 首楼和甲板室均采用横骨架式, 由纵、 横钢质围壁, 纵桁, 强横梁, 横梁和支柱等构件组成; 甲板室和首楼的舱壁板均采用平面板加垂向扶强材; 驾驶甲板及罗径甲板设梁拱;
14/91

REVOLVABLE CRANE 3600T 2.2.2.10 BILGE KEEL 舭龙骨

TECHNICAL SPECIFICATION

The bilge keels to be fitted on each side bilge of the vessel. 主船体舭部设置舭龙骨。 2.2.2.11 FOUNDATION 基座 Main foundation consisting of thicken foundation face plate, longitudinal girders, transverse girders and brackets etc. , shall have enough strength and rigidity. 船体基座由加厚基座面板、纵向和横向桁材以及加强肘板等组成,具有足够的强度和刚度。 2.2.2.12 HELICOPTER DECK 直升机甲板 The helicopter deck is to be arranged in bow, which is eight-square, its center diameter is 22.3 meter and to be supported by pillars on the forecastle deck for elevation. 本船首部设置直升机平台,为八角型,中心圆直径 22.3 米,用支柱支撑在首楼甲板上,供 直升机起降。 2.2.2.13 ADDITIONAL REINFORCEMENT 局部加强结构 Additional reinforcement to be made for the sail anchor, orientation anchor winch, hydraulic winch, 3600t crane arm rack, and capstan etc. 本船对航行锚机、定位锚绞车、200kN 液压绞车、3600t 起重机臂搁架、立式绞盘等部位的 船体结构予以特别加强。 2.3 WELDING AND CONSTRUCTION 船体焊接和装配制造 2.3.1 STEEL PRETREATMENT 钢材预处理 All steel plates and sections shall be pretreated with painted protection before laying off in accordance with the standard. 所有钢板、型材下料前应按标准进行预处理,涂防锈漆保护。 2.3.2 HULL WELDING 船体焊接 Welding workmanship to be in accordance with the GL Rule Requirements and subject to the approval of the Classification Society’s surveyor. All the welded surface shall be clean, dry, without oxid, grease and impurity. The edge of steel plates shall be fabroated in accordance with the GL Rule Requirements. The chemistry component of painting to be inspected by supervisor not to affect welding quality. The flat welding to be applied as far as possible except for manual welding, Prefabricated, semi-automatic, automatic welding methods, welding for excessive gaps between surface and edges, etc. are to be subjected to the approval of the Classification Society surveyor and owner’s representative. All welding procedure should be carried out by practiced operator according to the
15/91

REVOLVABLE CRANE 3600T

TECHNICAL SPECIFICATION

Requirements of the Hull Welding approved by class society. 本船船体结构的焊接工艺应符合 GL 规范的有关规定,并取得 GL 验船师的认可。 所有施焊表面均应清洁、干燥、无屑、无氧化物、无油脂、无杂质,板材边缘处理应满足 GL 规范要求。 焊接作业前,应证明保护底漆的化学成分对焊接质量没有影响,并请验船师核准。 船体建造除手工焊接外,应尽量采用平焊,采用预制和自动/半自动焊,坡口或间隙较大 时的焊接,需经验船师和船监造人员的同意。 所有焊接工作需由有资质的焊接工作人员按照合理的焊接规程完成。 2.3.3 CONSTRUCTION 船体装配制造 Fabrication and assembling quality to be in accordance with the Rule Requirements. Tolerance in machining and assembling to be in accordance with Rule requirements. Structure assembling is not to be compulsive molding to avoid more obvious interior stress and strain. Drain holes, air holes, details of typical shall in accordance with the Rule Requirements. Temporary welding shall be removed by flame cutting etc., seam to be grounded smoothly the after welding. Non-watertight structural members shall be provided with access/lightening holes in accordance with the Builder’s practices if necessary but not to be affected structural strength of the members. Openings in the shell plating, deck etc. to be rounded and reinforced if necessary. 构件制作与装配质量必须符合相关规定的要求。 严格控制加工及装配误差,不得超出规范允许的公差范围。结构装配不宜强制成型,以免 使构件产生较大的内应力和变形。 本船构件的流水孔、通气孔、骨材通过构件的切口以及结构节点形式,按规范要求施工, 并应满足规范要求。 因定位或装配需要, 临时焊接的马脚事后要采用火焰切割或气刨予以去除, 并将焊缝磨平。 按照建造方的经验,在不影响构件强度下,提供设置有防水构件的通道\照明人孔。外板、 甲板等强力构件的所有开口均应有光滑的圆角或复板。 2.4 TEST AND EXAMINATION 检验及试验 2.4.1 WELDING QUALITY TEST 焊接质量检验 The welding test to be strictly carried out, and welding quality to be approved before next processs. 焊接检验应严格执行,对焊前、焊接过程及焊后的焊接质量作认真检验,检验合格 后方可进行下一步工作。 Welding defects or destroy which harm to structure strength shall be avoided. 所有构件 的制造和安装均不允许出现任何由于起弧、引弧或其他焊接工作引起的对结构整体强度不利的 焊接缺陷或破坏。
16/91

REVOLVABLE CRANE 3600T

TECHNICAL SPECIFICATION

All primary weld seams shall be tested in appearance after welding. Seam surface to be grounded smoothly to base plate. Welding inspection to be carred out while not painting. 船体结构施焊完工后,所有主要焊缝均需进行外观检验。焊缝表面应成型均匀、致密、平滑 的向母材过渡,无裂纹和过大的余高以及其他不应有焊瘤、弧坑和咬边等焊接缺陷的存在。焊 缝检验应在不涂漆的情况下进行。 Welding inspection shall be carried out after welding 48 hours. 焊接无损检验应在焊接完成后 48 小时后进行。 Nondestructive inspection of welding quality test to be carried out by ultrasonic detection, radiographic inspection, magnetic detection. Nondestructive inspection process shall be arranged by shipyard, test position and quantity to be decided by the GL’s surveyor and the shipyard, the procedure and standard to be approved by GL society, the result of tests to be subjected to Surveyor of the Classification Society and Owner’s representative. 焊缝内部质量无损检验采用超声波探伤、X 射线探伤和磁粉探伤。船厂应制定无损检验程 序并执行无损检验,船体焊缝无损检验的数量和位置可根据实际情况由船厂和 GL 验船师商定, 无损检验的工艺和评定标准应经 GL 同意,检验结果应提交 GL 验船师和船东监造人员认可。 2.4.2 TIGHTNESS TEST 密性试验 Tightness test shall be carried out to confirm its good tightness before launching. 船体建造完工后,下水之前必须进行船体密性试验,以检验有无渗漏现象,待全部检验合 格后方可下水。 Reasonable procedure of tightness test to be arranged by shipyard and to be carried out according to it to avoid hull deformation. 制定合理的密性试验程序,按试验程序进行试验,以防止船舶变形。 The examination methods such as hydraulic test, kerosene test, hose test, water pouring test and air tightness test etc. shall be carried out. 密性试验主要采用灌水试验、煤油试验、冲水试验、淋水试验和充气试验等方法。 All parts to be checked shall be cleaned, and the oxide skin or dross to be taken off from the weld seams. All the welds on the watertight seams shall not be coated with painting, cement or insulation material. The flat priming coat which not affected tightenss test shall be painted after the approval of Owner and GL classification society. 密性试验前,船体各部分和检验合格的焊缝应清除氧化屑及焊渣,并打扫干净;不应在水 密焊缝处涂刷油漆、水泥等涂料,也不应敷设绝缘材料;经业主(和 GL)同意可以涂上薄薄一层 不影响密性试验的底漆 The tightness test to be carried out in accordance with the GL Rule Requirements. Different examination shall be executed in different position. 密性试验根据 GL 规范的相关要求进行,不同部位采用不同的试验方法。

17/91

REVOLVABLE CRANE 3600T

TECHNICAL SPECIFICATION

3. Outfittings 舾装 3.1 Navigation Anchor arrangement 航行锚设备
Two sets of navigation anchor equipments to be arranged on the B-deck. An anchor, anchor chain cable, chain stopper, hawse pipe, chain pipe and windlass to be included in every set. 首部左、右侧各设置 1 套航行锚设备,每套设备包括锚、锚链、掣链器、锚链筒和 1 台单 侧式液压起锚系泊组合机。

3.1.1 Anchor 锚
Weight: Type: Number: 规格: 型号: 数量: 10575kg AC-14 锚; 3 个(其中 1 个备用) 10575kg; AC-14; 3(one for spare).

3.1.2 Anchor chain and accessory 锚链及其附件
Anchor chain cables: Type: Diameter: Grade for chain cable: 锚链: Electro-welded anchor chains and stud-link type; 715m; φ 92mm; M3 grade; Total length:

Disassemble tools for anchor chains are to be supplied. 直径φ 92mm ,M3 级有档电焊锚链,总长 715m(26 节) ; 此外,应配置锚链拆卸工具。

3.1.3 The Combined windlass/mooring winch 锚机
The vessel will be equipped with two windlasses with type of combined windlass/mooring winch. Each windlass contains one declutchable cable lifter, declutchable mooring drum and warping end, and will be driven by the public pumping station which is to be shared with the hydraulic multifunction winches. 单侧式液压起锚系泊组合机 2 台(左式及右式各 1 台) ,每台锚机配置 1 个链轮、1 个系缆 卷筒和 1 个副卷筒,并与液压绞车共用液压泵站。 The main technical parameters of the combined windlass/mooring winches as follows: 单侧式液压起锚系泊组合机主要技术参数如下: (1) Part of weighing Anchor chains: AM3 grade, φ 92mm; 9m/min; 402kN; 2735kN;
18/91

Water depth of cast anchor: 82.5m; Normal weighing speed: Working load: Holding load:

REVOLVABLE CRANE 3600T 锚机部分 锚链: 工作水深: 起锚速度: 工作负荷: 支持负荷: (2) Part of mooring Rope diameter: Drum load: Capacity of ropes: 系泊部分: 合成纤维绳直径: 卷筒拉力: 容绳量: (3) Part of warping end Load of warping end: 副卷筒: 卷筒拉力: 150kN

TECHNICAL SPECIFICATION

AM3 级,φ 92mm; 82.5m; 9m/min; 402kN; 2735kN。 φ 80mm; 200kN; 200m; φ 80mm; 200 kN; 200m; 150kN.

3.1.4 chain stopper 掣链器
A roller type chain stopper will be arranged on the place between the windlass and the exit of hawse pipe on deck. The vessel has two chain stoppers totally. 锚机前部,每个锚链筒甲板出口处,设置滚轮闸刀掣链器 1 个。全船共 2 个。

3.1.5 hawse pipe 锚链筒
Hawse pipes are to be installed in both sides of B-deck, and pipes for cleaning anchor chains are to be included in it. B 甲板两舷设置钢质锚链筒,供收放锚链及锚收起后的存放。锚链筒配置锚链冲水管系。

3.1.6 chain locker 锚链舱
Two chain lockers away from each other are to be arranged under the bow upper deck and their capacity is enough for anchor chains’ storage. Steel gratings will be laid on the bottom of chain lockers. To cleaning dirt conveniently, manhole covers are to be installed on chain locker’s walls upside the gratings. Pumping out system on chain locker’s bottoms will be provided (see engine specification). 船首上甲板以下舱内设置两个独立的锚链舱,每个锚链舱的容量足以使锚链方便存放。锚 链舱下部设置钢质格栅,并在格栅以下的舱壁上设置水密人孔盖,用于清除锚链舱内的污物。 锚链舱配置舱底抽水管。 (见轮机规格书)
19/91

REVOLVABLE CRANE 3600T

TECHNICAL SPECIFICATION

3.1.7 chain pipe 锚链管
Chain pipes are to be arranged on the top of chain lockers. The vessel has two chain pipes. 每个锚链舱上方设 1 个锚链管。全船共 2 个。

3.1.8 cable releaser 弃锚器
Cable releasers are to be fitted in the chain lockers and can be operated from outside. The vessel has two cable releasers. 每个锚链舱设 1 个弃锚器。全船共 2 个。

3.2 Mooring equipment 系泊设备 3.2.1Hawsers and steel galvanized wire rope 系船索和镀锌钢丝绳
Hawsers: Type: Number: Diameter: Length: 8-strand Nylon; 4; φ 80mm; 200m; φ80mm,破断力不小于 755 kN,长 200 m ,4 根;

Minimum breaking strength: 755kN. 系船索:8 股锦纶绳 Steel galvanized wire ropes: Spec: Number: Diameter: Length: 6×37+FC1570ZZ1060; 4; φ 48mm; 300~500m;

Minimum breaking strength: 1060kN; 镀锌钢丝绳 φ 48mm,6×37+FC1570ZZ1060,破断力不小 1060kN, 长 300~500m ,4 根;

3.2.2 200kN hydraulic multifuction winch 200kN 多用途液压绞车
The vessel is equipped with four hydraulic multifunction winches totally. Two of the winches are arranged on the foreside of B-deck, the others two are on the upper deck of stern. The main performance parameters of the hydraulic multifunction winches as follows: 本船配备 200kN 液压多用途绞车 4 台。其中首楼甲板(B 甲板)左右舷各设 1 台,上甲板尾部 左舷设 2 台。200kN 多用途液压绞车主要技术参数如下: (1) Part of drum 主滚筒 Diameter of galvanized wire rope: Type of galvanized wire rope: Drum load: Mooring speed: Holding load: Capacity of wire ropes: 镀锌钢丝绳直径: 200kN; 15m/min; 800kN; 300~500m; φ 48mm
20/91

φ 48mm; 6×37+FC1570ZZ1060;

REVOLVABLE CRANE 3600T 型号: 额定拉力: 公称系缆速度: 制动力: 容绳量: Load of warping end: Mooring speed: 拉力: 系缆速度: 100kN; 15m/min

TECHNICAL SPECIFICATION 6×37+FC1570ZZ1060; 200kN; 15 m/min; 800kN; 300~500m; 100kN; 15m/min.

(2) Part of warping end 副卷筒

3.2.3 Hydraulic pressure public pumping station 液压公用泵站
The hydraulic pressure anchor machine and winch have independence hydraulic pressure pumping station; the pumping station is composed with 2 oil pump machine, every oil pump set can drive either 1 anchor machine, or 2 winches. Use middle-press hydraulic pressure set、valve and pipeline, galvanoplastics is A.C. 440V, 60Hz. 本船液压组合锚机和绞车配置独立的液压泵站。该泵站由 2 台油泵机组组成,每台油泵机 组可驱动任意 1 台锚机,或任意 2 台绞车工作。 应采用中压液压设备、阀件及管系,电制为 A.C.440V,60Hz。

3.2.4 Deck Outfittings 甲板舾装件
The amount and arrangement of bollards, mooring pipes and guide rollers accord to need. 按需要确认带缆桩、导缆孔及导缆器、缆索卷车、羊角单滚轮导缆器等设备的安装和数量。

3.3 Rubber fender 护舷
The vessel is equipped with removable and gas-filled type rubber fender on both broadsides. 本船两舷设置活动式充气橡胶护舷

3.4 Positioning Anchor Equipments 工作定位锚设备 3.4.1 Environment 环境条件
Maximum water depth :150m; Intact case: Wind speed: 17.1m/s 3kn; Current velocity: Damaged case: Wind speed: 26.5m/s 3kn; Current velocity:

Significant wave height: 2.5m;

Significant wave height: 6m; 最大作业水深:150m 作业工况:风速 17.1m/s,流速 3kn,波高 H1/3=2.5m; 自存工况:风速 26.5m/s,流速 3kn,波高 H1/3=6m。
21/91

REVOLVABLE CRANE 3600T

TECHNICAL SPECIFICATION

3.4.2 Collocating Standard of Positioning Anchor: 工作锚设备配置要求
The vessel set up 8 point anchor position The positional anchor winches are located in the bow and stern wing tanks of upper deck. Every wing tank has two. The anchor lines will be guided to upper deck by pulleys and connected to the shackles of working anchors after they are to be leaded out of broadside by fairleads. The bow or stern working anchors will be stowed in bow or stern anchor racks. 本船按 8 点锚泊定位配置工作锚设备, 工作锚绞车设置在上甲板下首尾边舱内,每舱 2 台。 首尾部工作锚锚索均通过导向滑轮引到上甲板上,然后再经导向滑轮和舷边转动导缆器引 出船外,并同工作锚连接。

首、尾部工作锚存放在首、尾部两舷处的锚架上。 3.4.3 Working Anchor 工作锚
Working anchors’ spec as follows: Type: Weight: Number: STEVPRIS MK6 (High holding power anchor); 6500kg 8.

海洋工程大抓力锚 STEVPRIS MK6 型,6500kg,8 个。

3.4.4 Anchor Rigging 锚索
Anchor lines are steel galvanized wire ropes with length of 1800m, diameter of 76mm, type of 6×49 SWS+IWR, breaking strength of 3800kN and number of 8. 工作锚锚索为镀锌钢丝绳,长 1800m,直径φ 76mm, 6×49 SWS+IWR, ,破断力 3800 kN , 8 根。

3.4.5 Working Anchor Winch 工作锚绞车
The vessel will be equipped with eight positional anchor winches driven by frequency conversion. The positional anchor winches will be operated either locally or remotely at a centralized control station installed in the wheelhouse. The main performance parameters of the positional anchor winches as follows: 本船设置电动变频驱动锚绞车 8 台。工作锚绞车可在机侧控制,也可在驾驶室集中控制。 工作锚绞车主要技术参数如下: Duty pull: Holding load: 绞车拉力: 绞车速度: 支持负载: 容绳量: 1100kN; minimum 3200kN (at 2ND layer); 1100 kN; 15 m/min(拉力为 1100 kN 时) ;/ ≥30m/min(空载时滚筒中间层); 不小于 3200 kN(滚筒第二层) ; 1800m;
22/91

Mooring speed: 15m/min (at 1100kN); / ≥30m/min(without load at mid drum); Drum capacity: φ 76mm×1800m.

REVOLVABLE CRANE 3600T To be supplied in package: Local control panels; 机侧控制台

TECHNICAL SPECIFICATION

Remote centralised control panels at wheelhouse; 驾驶室集中控制台 Tension indicator for anchor lines; 锚索张力指示仪 Length readout indicator; 锚索放出长度指示仪 Speed indicator for anchor lines; 锚索放出速度指示仪 The brakes and clutches of anchor winches will be driven by hydraulic or pneumatic control. Every 2 anchor winches contain 1 hydraulic pump or air condition. 锚绞车刹车及离合器采用液压或气动控制, 2 台锚绞车配置 1 台液压泵组或空气压缩机。 每

3.4.6 guiding equipment for anchor lines 锚索导向装置
Fairleads Number : 8; 8 只; The amount of pulleys accords to need. 转动导索器: 导向滑轮数量按每根锚索引出路线需要配置。

3.4.7 anchor rack 锚架
Anchor racks will be installed on both broadsides of bow and stern to stowing working anchors. 锚架设在首、尾部舷侧处,供存放工作锚用。

3.5 hoisting equipment 甲板及舱内起重设备 3.5.1 crane 起重设备
Two electric-hydraulic cranes will be arranged on the portside and starboard of B-deck. The performance parameters of the cranes as follows: 首部 B 甲板左右舷设置 2 台 20t-15m 全回转电动液压起重机,其主要技术参数如下: Safe working load: Maximum slewing radius: Minimum slewing radius: Hoisting speed: Hoisting height: Slewing scope: Max heel/trim: Electric motor: 安全工作负荷: 最大工作半径: 最小工作半径: 起升速度: 起升高度: 空载回转速度: 回转范围: 20t; 15m; 3.5m; ~15m/min; 35m; 360°; 5°/2°; 440V, 60Hz, 3PH, 95kW. 20t; 15m; 3.5m; ~15m/min; 35m; ~0.8r/min; 360°全回转;
23/91

Slewing speed without load: ~0.8r/min;

REVOLVABLE CRANE 3600T 最大允许倾角: 电机参数: 功率: 电制:

TECHNICAL SPECIFICATION 横倾 5°,纵倾 2°; 95kW; 440V/60Hz/3PH。 (4.2.2 停泊发电机电制为 440V/60HZ)

3.5.2 Electric hoist 舱内起重设备 An electric hoist will be installed in hawser store to hoist apparatuses and tackles. Tracks for the electric hoist are to be supplied. 索具舱内设置 10t 电动葫芦 1 台,并配置行走轨道,供吊放器材和索具使用。 The main technical data of the electric hoist as follows: 电动葫芦主要技术参数如下: Capacity: Hoisting lift: Lifting speed: Travelling speed: 10t; 9m; 7m/min; 20m/min;

Diameter of steel wire rope: φ 15mm; Electric motor for hoisting: A.C.440V, 60Hz, 13kW; Electric motor for travelling: A.C.440V, 60Hz, 2×0.8kW. 起重量: 起升高度: 起升速度: 运行速度: 钢丝绳: 起重电机: 运行电机: 10t; 9m; 7 m/min; 20m/min; φ 15mm; A.C.440V,60Hz,13kW。 A.C.440V,60Hz,2×0.8kW。

3.5.3 MARINE ELEVATOR for galley 厨房食品升降机
An elevator will be installed in elevator-shaft and travels from medium deck to B-deck. The main technical data of the elevator as follows: Normal capacity: Travelling speed: Stop station: Control: Electric motor: 300kg; 16m/min; three stations;(middle deck, platform, A deck) push button to control; A.C.440,60Hz,3PH, 2.5kW

本船自中间甲板至 B 甲板的升降机通道内设置 300kg 船用食品升降机。 船用食品升降机技术参数如下: 额定载重量: 额定速度: 轿箱型式: 停靠层数: 操纵方式: 300kg; 16m/min; 单开门直分式; 三层(中间甲板、舱内平台、A 甲板) ; 轿外按钮控制;
24/91

REVOLVABLE CRANE 3600T 电制:

TECHNICAL SPECIFICATION 三相,A.C.440,60Hz,2.5kW

3.6 Lifesaving Equipment 救生设备 3.6.1 Lifesaving Boat and Boat Davit 救生艇
Two totally enclosed lifeboats which can be held about 63~66 persons will be arranged on each side of B deck. The vessel has four lifeboats totally and two of them are also used as rescue boat. 本船首楼 B 甲板每舷设置 2 艘 63~66 人全封闭式玻璃钢机动救生艇,全船共 4 艘。其中 2 艘兼作救助艇。 The main technical data of the lifeboats as follows: Material: Total length: Speed: 救生艇主要技术参数如下: 艇长: 核定乘员人数 航速: 8.5m; 63~66 人; >6kn; fiberglass-reinforced plastics 8.5m; 63~66; >6kn.

Carrying capacity of lifeboat:

3.6.2 Boat Davit 吊艇架
The vessel will be equipped with four gravity luffing arm type davits for totally enclosed lifeboats. Remote control is necessary to be supplied with davits. 本船配置 4 副重力倒臂式封闭式救生艇吊艇架,并附设艇内遥控放艇装置绳索滑车。

3.6.3 Life Boat Winch 救生艇绞车
The vessel will be equipped with two electric lifeboat winches (right or left types are also one). The main technical data of the electric lifeboat winches as follows: Working load: Hoisting load: Lowering load: 63kN; 30kN; 40kN; ≥10m/min; 80~110m/min;

Rope hoisting speed: Rope lowering speed: Steel wire rope: Drum capacity: Electric motor:

φ 21mm; 2×50m; A.C.440V,60Hz, 7.5kW;

Remote control is necessary to be supplied with davits 配置 63 kN 电动救生艇绞车 2 台,左式及右式各 1 台。 63 kN 电动救生艇绞车主要技术参数如下: 工作负荷: 起升负荷: 63kN; 30kN;
25/91

REVOLVABLE CRANE 3600T 刹车调定负荷: 起艇时钢丝绳速度: 放艇时钢丝绳速度: 钢丝绳: 卷筒容绳量: 电动机: 功率: 附件: 40kN;

TECHNICAL SPECIFICATION

≥10m/min; 80~110m/min; 2×50m;

φ 21mm; A.C.440V,60Hz, 7.5kW; 艇内遥控放艇装置绳索卷筒

3.6.4 Rescue boat winch 救助艇绞车 The vessel will be equipped with two electric rescue boat winches (right and left types are also one). The main technical data of the electric rescue boat winches as follows: Working load: Hoisting load: Lowering load: 63kN; 30kN; 40kN; ≥36m/min; 80~110m/min;

Rope hoisting speed: Rope lowering speed: Steel wire rope: Drum capacity: Electric motor:

φ 21mm; 2×50m; A.C.440V,60Hz, 22.5kW;

Remote control is necessary to be supplied with davits 配置 63 kN 电动救生艇绞车 2 台,左式及右式各 1 台。 63 kN 电动救生艇绞车主要技术参数如下: 工作负荷: 起升负荷: 刹车调定负荷: 起艇时钢丝绳速度: 放艇时丝绳速度: 钢丝绳: 卷筒容绳量: 电动机: 功率: 附件: 63kN; 30kN; 40kN; ≥36m/min; 80~110m/min; φ 21mm; 2×50m; A.C.440V,60Hz; 22.5kW; 艇内遥控放艇装置绳索卷筒。

3.6.5 liferaft 救生筏
Two liferafts which can seat twenty persons will be arranged on each side of B-deck and the stages for inflatable liferaft with hydrostatic releaser are also to be provided. The vessel has four totally.
26/91

REVOLVABLE CRANE 3600T

TECHNICAL SPECIFICATION

本船首楼 B 甲板每舷设置 20 人可吊式气胀救生筏 2 只, 全船共 4 只。 救生筏置于带有静水 压力释放器的救生筏架上。

3.6.6 lifebuoy and life-equipment 救生圈及其属具
The vessel will be equipped with eighteen lifebuoys and two with life-lines (orange, length of 35m, and diameter of 8mm), eight with self-igniting light, and two with self-igniting light & self-activating smoke signal among these. All the lifebuoys are to be settled on lifebuoy stages which will be fixed by welding. 本船配置不包布救生圈 18 只,其中:带可浮救生索(橙色、长 35m、直径 8mm)2 只, 带救生圈自亮灯 8 只,带自亮灯和烟雾信号 2 只。 所有救生圈均存放在钢质救生圈架上,救生圈架采用焊接固定。

3.6.7 boarding ladder 登乘梯
A boarding ladder is to be fitted on each side of B deck. The vessel has two totally. 本船首楼 B 甲板每舷设置登乘梯 1 架。全船共 2 架。

3.6.8 marine lifejacket 船用背心式救生衣
The vessel will be equipped with 256 lifejackets with lights. The lifejackets will be deposited in accommodation cabins, wheelhouse, engine room and working rooms. 本船配置船用背心式救生衣 256 件, 每件救生衣配置救生衣灯 1 个。 居住舱室按床位每人 1 件, 其余 15 件分别放在驾驶室、机舱、起重机工作间等工作区域。

3.6.9 thermal protective life-saving suit 保温救生服
Twelve thermal protective life-saving suits will be provided for the working personnel of rescue boats. 本船配保温救生服 12 件,供救助艇员工作人员使用

3.6.10 marine life-throwing appliance 船用救生抛绳器
Four life-throwing appliances will be provided. 本船配船用救生抛绳器 4 具。

3.6.11 rocket parachute flare signal 船用红光降落伞信号
Twelve rocket parachute flare signals will be provided at least according to the regulation requirement. 本船配船用红光降落伞信号 12 支。

3.7 working boat 工作艇
The vessel will be equipped with a steel mobile working boat and it also to be used as a traffic boat. The working boat will be mounted on a boat chock fixed on the place that is in the working range of the crane on starboard of B-deck.
27/91

REVOLVABLE CRANE 3600T

TECHNICAL SPECIFICATION

The main technical date of the working boat as follows: Total length: The power of engine: 置艇座。 钢质工作艇主要技术参数如下: 总长: 主机功率: 约 9m; 约 88 kW ~9m; ~88kW.

本船配钢质工作艇 1 艘,可兼作交通艇。该艇存放在首楼 B 甲板右舷起重机工作范围内,并配

3.8 Signal Equipment 信号设备 3.8.1 general
Signalling equipment such as navigating lights, flags, shapes, bells and gong etc. will be provided according to the power-driven vessel’s requirements of the regulation. 本船信号设备按机动船配置号灯、号旗、号型、号钟、号锣及烟火信号。

3.8.2 mast 雷达桅
Mast will be settled on the compass deck. 本船驾驶室顶部中间设雷达桅

3.8.3 christmas tree 示向灯杆 A Christmas tree will be settled on each side of compass deck. 本船驾驶室顶部两舷设左右
舷信号灯杆各 1 根

3.8.4 fore anchor light’s tree 首锚灯杆 A fore anchor light’s tree will be settled on bow centre line of B deck. 首楼甲板船中处设首锚
灯杆 1 根

3.8.5 aft anchor light’s tree 尾锚灯杆 An aft anchor light’s tree will be settled on stern centre line of upper deck.
上甲板尾部船中处设尾锚灯杆 1 根。

3.8.6 letter-board 船名灯牌 A letter-board will be settled on each side of compass deck.
本船驾驶室顶部两舷处设船名灯牌各 1 个。

3.9 ladder,handrail,manhole,hatch,skylight and ventilator 梯、扶手、栏杆、人孔盖、舱口
盖、天窗及通风筒

3.9.1 gangway ladder 舷梯
Two turnable tread steel gangway ladders will be arranged on both sides of upper deck closed to forecastle and the electric gangway ladder’s winch will be provided together. 本船设置活动踏步钢质舷梯 2 架,位于上甲板两舷靠近首楼处,并配电动舷梯绞车。

3.9.2 interior ladder 室内梯
All the interior ladders are made of steel. The width of ladders is 800mm at least and the incline does not exceed 45°. The carrying capacity of foot steps is 200kg at least.
28/91

REVOLVABLE CRANE 3600T

TECHNICAL SPECIFICATION

生活处所及服务处所的梯道均为钢质,净宽不小于 800mm,倾角不大于 45°。踏步承重不小 于 200kg。

3.9.3 exterior ladder
All the exterior ladders are made of steel. The width of ladders is 700mm at least and the incline does not exceed 60°. Foot steps of ladders are checkered steel plate and its carrying capacity is 200kg at least. 各层甲板的室外斜梯以及通向舱内设备处所的斜梯均为钢质,梯宽不小于 700mm,倾角不大 于 60°。踏步为花纹钢板,承重不小于 200 kg。

3.9.4 vertical ladder 舱内直梯
Vertical steel ladders will be placed in these tanks such as ballast water tanks, empty tanks, fresh water tanks, fuel oil tanks, lubricating oil tanks, dirty oil tanks and so on.

上甲板、中间甲板和内底板以下的压载水舱、空舱、淡水舱、燃油舱、滑油 舱、污油舱等密闭处所均设置钢质直梯。 3.9.5 handrail 栏杆
Steel removable handrails will be installed on portside and starboard of upper deck; other deck’s handrails are fixed type. 上甲板两舷设置钢质可拆式栏杆,其余各层甲板设置钢质固定栏杆

3.9.6 storm rail 扶手
Storm rail will be installed on the wall of interior corridor above the deck about 1000mm. 生活处所及服务处所内走道设置风暴扶手。

3.9.7 manhole cover 人孔盖
Steel watertight or oiltight manhole covers will be fitted to ballast water tanks, empty tanks, fresh tanks, fuel oil tanks, lubricating tanks, dirty oil tanks and chain lockers etc. The bolts and nuts of the manhole covers are made of stainless steel. 上甲板、中间甲板和内底板以下的压载水舱、空舱、淡水舱、燃油舱、滑油舱、污油舱以及锚 链舱等密闭处所均设置钢质水密或油密人孔盖。人孔盖的螺栓、螺母均为不锈钢。

3.9.8 hatch 舱口盖
Steel weathertight hatches will be fitted on the top of hawser store and rigging room on upper deck, and their sizes are appropriate to hoist implements and riggings conveniently. Steel weathertight minitype hatches will be provided if the exits for steering oar room, capstan room etc. are on the exposed deck. 作业器材工具舱和索具舱在上甲板上设置钢质风雨密舱口盖, 其大小能方便地吊运器材和索具。 舵桨舱、绞盘舱以及其他舱室在露天甲板上的出入均设置钢质风雨密小舱口盖。

3.9.9 engine room skylight 机舱天窗
Engine room skylights will be installed on the top of engine casing and emergency closing
29/91

REVOLVABLE CRANE 3600T appliances will be supplied too.

TECHNICAL SPECIFICATION

机舱围井顶部设置机舱天窗和天窗应急关闭装置

3.9.10 NATURAL ventilator 自然通风筒
Natural ventilators will be provided to equipment rooms below upper deck or B-deck. 首楼 B 甲板以下及上甲板以下各设备舱室均设置自然通风筒。

3.10 DOOR and window 门窗 3.10.1 exterior door 室外门
Sliding stainless doors will be fitted on the both sides of the wheel house. Otherwise, the entrance doors to house decks on upper or above upper deck from exposed deck will all be weathertight type and made of steel. 驾驶室两侧设置不锈钢移门。此外,上甲板及以上各层甲板室通向露天甲板出入口的门均 为钢质风雨密门。

3.10.2 interior door 室内门
Fire-retarding doors will be fitted on the entrances to accommodation and service rooms according to the requirements of fire-resisting division. The exits to exposed deck from interior corridors will be fitted with sound insulation and choke doors, and the same to these doors of centralized control room for machine. 生活处所及服务处所内,按防火分隔要求设置防火门。内走道通向露天甲板的出入口处设 隔音阻气门。机舱集控室的门为隔音阻气门。

3.10.3 NON-OPENING WINDOW FOR WHEEL HOUSE 驾驶室窗
Non-opening and big size heating type windows made of aluminium alloy are will be fitted on the walls around the wheel house. Wipers will be installed on the windows on front and back bulkhead of wheel house. 驾驶室四周设置大尺寸加热型铝合金矩形窗以充分满足驾驶员视野的需要,前、后端壁的 窗配置刮水器。

3.10.4 side scuttle 舷窗
Frames of the side scuttles on or below C deck will all be aluminium alloy. The side scuttles have interior covers. 首楼 C 甲板以下的窗均为带有内盖的铝合金舷窗。

3.10.5 normal rectangular window 普通矩形窗
Normal rectangular windows with aluminium alloy frames will be installed on the deck cabins between bridge deck and C deck. All these windows are side-opening type. 首楼驾驶甲板以下,C 甲板以上的窗均为侧开式普通铝合金矩形窗。

3.10.6 window for centralized control room of machine 机舱集控室窗
Fixed, aluminium alloy, double layers, hollow and sound insulation windows will be installed on the bulkhead faced to engine in the centralized control room for machine. 机舱集控室面向机器一侧的舱壁上,设置固定式铝合金双层中空玻璃隔声窗。
30/91

REVOLVABLE CRANE 3600T

TECHNICAL SPECIFICATION

3.11 Firefighting Equipment 消防器材
The vessel will be equipped with fire extinguishing equipments according to the regulation. (For fire extinguishing system, see engine specification). 本船按规定配备消防器材(消防系统见轮机专业) 。

3.12 navigational aids equipment 航行设备
Projector compass Aneroid Thermometer Psychrometer thermometer Portable aerovane Fixed aerovane 7×50 binoculars Magnifying glass for drawings Protractor Light-weight three-arm protractor Parallel rules Stainless straight rule Chart weight Depth sounder Clinometer Stopwatch CGY-165 1; 1; 2; 2; 1; 1; 2; 2; 1; 1; 2; 1; 2; 2; 3; 2; 1;

Hand lead 3.5kg (with rope of 52m length) Ship bell 投影磁罗经: 无液气压计: 温度计: 干湿温度计: 手提风向风速仪: 固定风向风速仪: 7×50 双筒望远镜: 看图放大镜: 量角器 : 轻型三杆分度仪: 平行尺: 不锈钢直尺: 海图压 : 测深仪 倾斜仪 : 2套 3 个;
31/91

Hand lead 13kg (with rope of 155m length) 1; 10; CGY-165 1 台; 1 个; 2 个; 2 个; 1 个; 1 个; 2 个; 2 个; 1 个; 1 个; 2 个; 1 个; 2 块;

REVOLVABLE CRANE 3600T 秒表:

TECHNICAL SPECIFICATION 2 只;

手用测深锤 3.5kg(配 52m锤绳) 1 套; : 手用测深锤 13kg(配 155m锤绳) 1 套; : 船钟: 10 只。

3.13 helicopter platform 直升机平台 3.13.1 obstruction free zone and symbol 无障碍区及标志
Helicopter platform is eight-square, contain a round with diameter of 22.3m, and the angle scope of obstruction free zone is 210°. The platform serves for the helicopter type of SIKORSKY S61-N to land or take off. Deck symbols for the helicopter platform contain borderlines, target ring, “H” letter and ship name etc. The lights of borderlines and deck will be provided for the helicopter to take off and land safely. 本船直升飞机平台呈八角形,其大小包含一个直径 22.3m的圆,无障碍区为 210°,可供 SIKORSKY S61-N 型直升飞机使用。 直升飞机平台的甲板标志包括:周边的边界线、中间的目标环和“H”字符、船名等,并设 置边界灯和甲板投光灯,可供直升飞机安全起降。

3.13.2 safety net 安全网
Safety nets with width of 1.5m will be installed around the helicopter platform edges to protect personnel. 直升飞机平台周围设置宽 1.5m的安全网,以保护人员安全

3.13.3 routeway 通道
Two routeways will be provided between bridge deck to helicopter platform far from each other. 驾驶甲板和直升飞机平台之间设有 2 个相互远离的斜梯,供人员上下使用

3.13.4 anti-slip net 防滑网
The anti-slip nets shall be covered on the helicopter platform. 直升飞机平台配置防滑网, 以保证直升飞机安全。

3.13.5 moorage 系留装置
Moorages shall be mounted in the helicopter platform around landing ring. 直升飞机平台 设置系留装置,供直升飞机系留使用。

3.13.6 anemometer、wind sock 风速风向仪、风向袋
Anemometer and wind sock will be provided. 落时使用。 设置风速风向仪、风向袋,供直升飞机降

32/91

REVOLVABLE CRANE 3600T

TECHNICAL SPECIFICATION

3.13.7 launder 排水设施
Launders will be mounted around helicopter platform border to collect and drain rain water to overboard directly. 直升飞机平台四周设集水槽,直接排至舷外。

3.14 accommodation equipment 居住舱室 3.14.1 wheel house and cabin 驾驶室及居住舱室 3.14.1.1 wheel house 驾驶室
Wheel house will be equipped with pilot chairs, wiretess operator’s tables, flag chests, key chests, telescope chests and chart tables. 驾驶室设有高脚扶手椅、报务桌、旗箱、钥匙箱、 望远镜箱、海图桌等设备

3.14.1.2 cabin equipment 居住舱室设备
(1) The vessel has eight single cabins with apartments. Each cabin to be fitted as follows: 单人套间 8 间,舱室设备: Single bed with drawers 一斗单人床 Bedstand 床头柜 Mattess 席梦思床垫 Wardrobe with double doors 双门衣橱 Writing desk 写字台 Document cabinet 文件柜 Long sofa (3 person) 长沙发(3 人) Revolving chair 转椅 TV set 电视机 DVD Computer 台式电脑 Small icebox 小型冰箱 Electric water bottle 电热水瓶 Clothing hood 衣钩 1; 1; 1; 1 1; 1; 1; 1; 1; 1; 1; 1; 1; 2;

Thermos rack (stainless steel) 不锈钢热水瓶架 1; Small safe box (digital) 小型保险箱(数字式) 1(only for captain and manager cabin); (仅船长室、经理套间) Radio-receiver recorder (with CD player function) 台式收录机(带 CD 功能) Key chest 钥匙箱 cabin); (仅大付室、大管轮室) Interior programmed telephone 内部程控电话 Sanitary unit 卫生单元 1 1. 1; 1(only for chief officer and first engineer

(2) The vessel has ten single cabins fitted with furniture as follows: 单人间 10 间,舱室设备
33/91

REVOLVABLE CRANE 3600T Single bed with drawers 一斗单人床 Mattess 席梦思床垫 Wardrobe with double doors 办公桌 Writing desk 双门衣橱

TECHNICAL SPECIFICATION 1; 1; 1; 1; 1; 1; 1; 1; 1; 1; 2; 1; 1. 2; 2; 2; 1; 1; 2; 2; 1; 1; 2; 1; 1. 2; 4; 2; 1; 1; 2; 4; 1; 2; 4;
34/91

Revolving chair with arms 带扶手转椅 Double sofa双人沙发 Bed lamp 床头灯 TV set 电视机 Electric water bottle 电热水瓶 Thermos rack (stainless steel) 不锈钢热水瓶架 Clothing hood 衣钩 Interior programmed telephone 内部程控电话 Sanitary unit 卫生单元 Single bed with drawers 单人床 Mattess 床垫 Wardrobe with a door 配单门衣橱 Writing desk 办公桌 Arm chair 扶手椅 Bookshelft 床头书架 Bed lamp 床头灯 Electric water bottle 电热水瓶 Thermos rack (stainless steel) 不锈钢热水瓶架 Clothing hood 衣钩 Interior programmed telephone 内部程控电话 Velour curtain for every 2 bed Sanitary unit 卫生单元 bunk bed with drawers 双层床 Mattess 床垫 Wardrobe with double doors 双门衣橱 Writing desk 办公桌 Arm chair 扶手椅 Bookshelft 床头书架 Bed lamp 床头灯 Electric water bottle 电热水瓶 Towel rack 毛巾架 Clothing hood 衣钩 2 只床各配丝绒床帘

(3) The vessel has forty double cabins fitted with furniture as follows: 2 人间 40 间,舱室设备

(4) The vessel has thirty-eight 4-men’s cabins fitted as follows: 4 人间 38 间,舱室设备

Thermos rack (stainless steel) 不锈钢热水瓶架 1;

REVOLVABLE CRANE 3600T

TECHNICAL SPECIFICATION

Velour curtain for every 4- bed 4 张床各配丝绒床帘 (5) Every bed listed above will be fitted with beddings as follows: 本船每个床位应配备的床上用品: Carpeting and covers; 毛毯及毛毯套; Two bedsheets; 床单 X 2; One quilt; 被子 X 1 Two quilt covers; 被套 X 2 One pillow; 枕头 X 1 Two pillowcases; 枕套 X 2 One mat; 凉席 One tick (sponge covered with canvas). 褥子(海绵外包细帆布)

3.14.2 galley equipment 厨房设备 3.14.2.1 galley equipment for crew 船员厨房设备
Cooking range (with baking oven) 四板电灶(连烤炉) Electric-steaming braising box 电、蒸气加热两用箱 Mincing machine 绞肉机 Stirring machine 搅拌机 Dough mill 和面机 Rice grinder 磨浆机 Filth disposer 污物粉碎机 Dishwasher 洗碗碟机 Automatic electric boiler 全自动电热沸水器 Icebox 冰箱: Microwave oven 微波炉 Serving table (stainless steel) 不锈钢配餐桌 Working table (stainless steel) 不锈钢工作桌 Washing table (stainless steel) 不锈钢洗桌 Dish shelf (stainless steel) 不锈钢碗碟架 Cup shelf (stainless steel) 不锈钢杯架 Bottle shelf (stainless steel) 不锈钢瓶架 Chopping block and rack 砧墩板架 Gas gathering 集气灶 Writing board (white) 写字板(白色) Cooker for 100pv100 人西餐厨具: 1; 1; 1; 1; 1; 1; 1; 1; 1; 1; 1; 1; 1; 1; 1; 1; 1; 1; 1; 1; 1

3.14.2.2 galley equipment for working crew
Microwave oven 微波炉 Cooking range 六板电灶(连烤炉)
35/91

1; 1;

REVOLVABLE CRANE 3600T

TECHNICAL SPECIFICATION 1; 1; 1; 1; 1; 1; 1; 1; 1; 1; 1; 1; 1; 1; 1; 1; 1; 1; 1; 1; 1

Electric-steaming braising box 电、蒸气加热两用箱 Electric frying pan 电煎锅 Mincing machine 绞肉机 Stirring machine 搅拌机 Dough mill 和面机 Rice grinder 磨浆机 Filth disposer 污物粉碎机 Dish washer 洗碗碟机 Icebox 厨房电冰箱 Serving table (stainless steel) 不锈钢配餐桌 Working table (stainless steel) 不锈钢工作桌 Dish shelf (stainless steel) 不锈钢碗碟架 Cup shelf (stainless steel) 不锈钢杯架 Bottle shelf (stainless steel) 不锈钢瓶架 Chopping block and rack 砧墩板架 Gas gathering 集气灶 Writing board (white) 写字板(白色)

Washing table with two pools (stainless steel) 不锈钢双斗洗池 Sterilizing tank (stainless steel) 不锈钢消毒柜 Electric water boiler (stainless steel) 不锈钢防干烧电茶桶 Cooker for 160P 160 人西餐厨具:

3.14.3 dining room 餐厅 3.14.3.1 crew’s dining room 船员厨房
The vessel has one crew’s dining room which can hold 68 persons to repast at the same time. It will be fitted with tables, chairs, buffets, chilling cabinet, ice machine, electric coffeepot, bread baking oven, ice water fountain, TV set, DVD, writing board, correspondence rack etc. in the room. 船员餐厅 1 间,68 个座位。设置餐桌、椅、餐具柜、冷藏柜、制冰机、电咖啡壶、烤面包器、 冷饮水机、电视机、DVD、写字板、信件架等。

3.14.3.2 working crew’s dining room 施工人员餐厅
A dining room for working crew with 160 seats will be provided. It will be fitted with tables, chairs, buffets, chilling cabinet, ice machine, electric coffeepot, bread baking oven, ice water fountain, TV set, DVD, writing board, correspondence rack etc. 施工人员餐厅 1 间,160 个座位。设置餐桌、椅、餐具柜、冷藏柜、制冰机、电咖啡壶、烤面 包器、冷饮水机、电视机、DVD、写字板、信件架等。

36/91

REVOLVABLE CRANE 3600T

TECHNICAL SPECIFICATION

3.14.3.3 dining room for guests 来宾餐厅
A dining room for guests will be arranged and fitted with tables, chairs, ice water fountain, TV set, DVD, writing board, correspondence rack etc. 来宾餐厅 1 间, 24 个座位。设置餐桌、椅、餐具柜、冷饮水机、电视机、DVD、写字板、信 件架等。

3.14.3.4 washing room 洗涤间
A washing room nearby the dining room for working crew will be arranged and fitted with sterilizing tanks. 施工人员餐厅边设置洗涤间,并配置足够数量的碗筷消毒柜。

3.14.4 office and meeting room 办公室和会议室 3.14.4.1 12-person’s meeting room12 人会议室
Two 12-person’s meeting rooms will be provided and fitted with desks and chairs. 12 人会议室 2 间,设置沙发、茶几、冰箱等,并配电脑等会议设备

3.14.4.2 50-person’s meeting room 50 人会议室
A 50-person’s meeting room will be provided and fitted with TV set, projector, video recorder, acoustics etc. The meeting room is also used as amusement room. 50 人会议室 1 间,兼作娱乐室,配有电视机、投影仪、录像机、音响设备等会议设备。

3.14.4.3 office 办公室 A 22-person’s office will be arranged and fitted with desks and chairs.
22 人办公室 1 间。设置办公桌、椅

3.14.5 infirmary and doctor’s room 医务室和医生间
An infirmary will be arranged and fitted with bed for consultation, medicine cabinet, oxygen bottle with accessory for first-aid, two stretchers, writing desk, chair etc. A doctor’s room will be arranged and fitted with a single bed, sofa, desk, chair, TV set with cabinet, toilet etc. 医务室 1 间,设置:钢质诊疗床、药柜、急救用氧气瓶及附件、推抬两用担架 2 付、写字台、 靠背软椅等。 医生室 1 间,设置:单人床 1 张、沙发、办公桌、椅、电视、电视柜及卫生间。

3.14.6 laundry and drying room 洗衣房及干衣房
Laundries and drying rooms at all accommodation decks will be arranged and fitted with tumble washers, washing tanks and electric heated dryer. 各层住人舱室设置洗衣房、干衣间,内设置:滚筒式洗衣机及水池,电热烘干机。

3.14.7 dirty locker room 污衣室
Two dirty locker rooms will be arranged and fitted with working clothing lockers.
37/91

REVOLVABLE CRANE 3600T 污衣室 2 间,设置有污衣柜

TECHNICAL SPECIFICATION

3.14.8 Gymnasium 船员活动室
A gymnasium will be arranged and fitted with gymnastic equipments. 健身房 1 间。设有健身器材。

3.14.9 Bathroom and toilet 浴室及厕所
Bathrooms will be fitted with showers, washbowls, wardrobes etc. Toilets will be fitted with wash closets, urinals, washbowls etc. 浴室内设置淋浴器、洗面盆及更衣柜等。 厕所内设置大便器、小便器及洗面盆等。

3.14.10 storeroom, bedding room and grain depot 储藏室
Store cabinets and shelves will be provided to storerooms, bedding rooms and grain depots. 被服间、储藏室、粮库等处所设置储物柜和搁架

3.15 Insulation 绝缘
Thermal insulation for all exposed decks and external walls of accommodations and service rooms will be rock wool with thickness of 100mm for decks and 50mm for walls. Fire-resistant insulation will be used ceramic fibre to attain the requirements of fire division. All insulation will be fixed by pins. 本船起居处所和服务处所日晒甲板和外围壁的隔热绝缘采用岩棉,甲板处为 100 mm 厚,围壁 处为 50 mm 厚。 满足耐火分隔要求的绝缘材料采用陶瓷棉。 所有绝缘材料均采用碰钉固定。

3.16 Carpentry 木作
The driving console、 engine room console、 living room、 public area(dinner room、 conference) and lining of inner-walkway、single casing wall and ceiling are adopted composite rock wool panel,single casing wall is 50mm thickness double-side plastic covered composite rock wool panel. Lining is 25mm thickness plastic covered composite rock wool panel. The material of face-sheet will be PVC. 本船驾驶室、机舱集控室、居住室、公共处所(餐厅、会议室等)和内走道的衬板、独立围壁 板和天花板均采用复合岩棉板。 厨房采用不锈钢复合岩棉板, 其余处所均采用贴塑复合岩棉板。 衬板为 25 mm 厚单面贴塑复合岩棉板,独立围壁板为 50 mm 厚双面贴塑复合岩棉板,天花板 为 30 mm 厚单面贴塑复合岩棉板。贴面采用进口 PVC 贴面。 厕所和浴室的衬板和天花板采用玻璃钢板。

3.17Deck and floor aux-material 甲板铺材和地板敷料
38/91

REVOLVABLE CRANE 3600T

TECHNICAL SPECIFICATION

3.17.1 Wooden sheathing 木甲板
Wooden sheathing will be laid on the left operation area of upper deck. 本船上甲板左侧起重作业区部分铺设木甲板。

3.17.2 covering for non-wet area 非潮湿处所的地板敷料
Anti-fire primary deck coverings will be laid on the deck of wheel house, accommodation, public areas (dining room, meeting room etc.), storerooms, corridors etc. and the plastic floor laid on the top. 本船驾驶室、居住室、公共处所(餐厅、会议室等) 、生活用品储藏室和内走道等处所的地板敷 设不易着火的甲板基层敷料,并贴塑料地毡

3.17.3 covering for wet area 潮湿处所的地板敷料
Wet areas such as galleys, bathrooms, toilets etc. will be covered with tiles around the walls with height of 300mm and cements & anti-slip tiles on the decks. 厨房、浴室和厕所等潮湿处 所,周围壁高 300 mm 以下敷设瓷砖,地板敷设水泥和防滑地砖。

3.18 Paint 涂装 3.18.1 preparation for steel surface 钢材表面处理
If the thickness of steel plates is ≥6mm, rust grade should attain to Sa2.5. Except that, rust grade should attain to St2.5. Steel plates should be sprayed shop primer as soon as possible after cleaning. 本船 6 mm 及以上钢材应经预处理达到 Sa2.5 级,6 mm 以下的钢材经预处理达到 St2.5 级。 经处理后的钢材应尽快涂上车间底漆。 钢材经加工制成分段以后,应对所有表面再一次检验,并进行二次表面除锈。其中船体上甲板 以下结构的内外表面、甲板室起重机外表面、以及露天甲板部分应达到 P1 级,其余部分可为 P2 或 P3 级。

3.18.2 means of coating 涂装方法
Spraying is preferred, but it will be allowed to coat by rollers or brushes at the areas not to spray conveniently. 应尽可能采用喷涂法,对于喷涂不方便的区域可采用滚轮或刷子涂刷。如 果涂刷几层涂料,则应在前面一层完成并干燥后,再进行下一层的涂刷。

3.18.3 coating plan 涂装方案
Hull paints mainly use epoxy; superstructure paints use alkyd or acrylic. The design service life is 5 years. The supplier may be “HEMPEL” or “INTERNATION”. 本体采用环氧系列油漆,上层建筑采用醇酸系列或丙稀酸系列油漆,淡水舱为环氧饮水舱厚涂 型油漆。 油漆按防腐年限 5 年考虑。水下漆膜厚度大于 280μ ,并使用防污漆,防止海生物的生长。 油漆选用“HEMPEL”或“INTERNATION” 。
39/91

REVOLVABLE CRANE 3600T

TECHNICAL SPECIFICATION

3.19Cathode protection 阴极保护 3.19.1 Impressed current cathodic protection 外加电流阴极保护
Impressed current equipment will be used to protect the hull parts under waterline. 本船船壳 外板水线以下部位设置外加电流阴极保护。

3.19.2 sacrificial anode 牺牲阳极保护
Sacrificial anodes will be used to protect ballast tanks and suction boxes and service life designs for 5 years. 压载舱及海底阀箱设置牺牲阳极保护,预计使用寿命为 5 年

3.20 symbol and cabin name plate 标志及舱室铭牌 3.20.1 symbol for ship name and port 船名及港名标志
Symbols for ship name will be shown on both sides of bow hull above waterline. Symbols for ship name and port will be shown on stern transom plate. Symbols for ship name and company will be shown on the balance weight of crane. 本船首部水线以上两舷船壳板处显示船名,尾部端封板处显示船名及港口名称。起重机配重箱 上标志船名和公司名。

3.20.2 safety symbol 安全标志
All escape route ways have marker by symbols. Warning boards will be fitted if necessary. 本船设置脱险通道标志,并根据需要设置警告牌

3.20.3 cabin name plate 舱室铭牌
Copper name plates will be fitted at all working rooms, accommodations, public areas, service rooms, storerooms etc. 本船所有工作舱室、起居处所、公共处所、服务处所、储藏室及居住室均设置铜质中文铭牌。

3.21 provision 供应品
Provisions will be provided according to “the allocation rules for spares and provisions of seagoing cargo ship” (CB*3166). 本船供应品按“海洋货船舱面属具备品及供应品定额” (CB* 3166)配备。

3.22 hardware and drygood 小五金、纺织品及用品 3.22.1 hardware 小五金
Hardwares will be made of copper or stainless steel. All sanirary unit and accessory will be good quantity, and the spare part will be copper or stainless steel. Stainless steel ashtrays will be fitted on every table, desk, teapoy and fixed type to be provided in wheel house.
40/91

REVOLVABLE CRANE 3600T

TECHNICAL SPECIFICATION

Clothing hooks will be provided in wheel house, meeting rooms, accommodations etc. Towel staff will be set in accommodation. Millor, basin, saop box will be provided in public bathrooms and lavatorys. Toilets will be fitted with wash closets, urinals, washbowls etc. Handrail and paper will be fitted with urinals. Bottle shelf and thermos rack will be provided in every accommodation, wheel room, meeting room, mess room. Other spare parts 小五金为铜质或不锈钢。 所有卫生设备及附件应质量良好,配件为铜质或不锈钢。 每个餐桌、写字台、茶几上配不锈钢烟灰缸,驾驶室配固定烟灰缸。 驾驶室、会议室、居住舱室、更衣室、活动室等舱室配挂衣钩。 居住舱室设毛巾杆。 公共浴室及厕所配台盆、镜子、肥皂缸等相应设施。 大便器及淋浴器旁配防浪扶手。大便器旁配卫生纸盒。 每个居住舱室、驾驶室、会议室、餐厅等舱室配水瓶架及茶杯架。 其余相应配件。

3.22.2 drygoods 纺织品及用品
All windows for accommodations will be fitted with double layers curtains. The inner layer will be thick & euphotic type and the outer layer will be shade type. The pelmets will be provided. Curtains and tracks will be provided around the chart table. 所有居住舱室窗配双层窗帘,内层为透光薄窗帘,外层为遮光窗帘。窗上方配窗帘轨。 除 1 人间,所有床配床帘并配床帘轨。 海图桌周围配遮光帘及导轨。

3.23 Noise 噪音
The design of the vessel and accommodation areas shall pay attention to minimize structure and air born noise from machinery spaces. Resilient mounting of machinery will be provided where possible. Particular attention is to be paid to hydraulic equipment. 船舶和舱室的设计应注意结构最小和机器噪音。机器弹力底座应在需处安装。液压设备应特别给 予注意。 The design of the vessel shall ensure compliance to following maximum allowable noise levels: 船舶设计应保证符合如下最大噪声允许等级 Max noise level in dBA 最大噪音分贝 85

Space 区域 Machinery spaces 机器间
41/91

REVOLVABLE CRANE 3600T

TECHNICAL SPECIFICATION

Engine Control Room 机舱 Workshops (8h / day) 工作室 Stores 储藏室 Galley / pantry 厨房/配餐间 Control Rooms and wheel house 控制室和驾驶室 Bridge wings 驾驶室两翼 Radio Room 无线电室 Offices 办公室 Day rooms 起居室 Recreation rooms 娱乐室 Hospital 医务室 Corridors 走廊 Changing rooms 更衣室

55 85 85 70

55

65 50 55 55 55 50 55 55

4 Machinery part 轮机部分 4.1 General 概述
The machinery part of the ship is designed and built according to the requirements of GL “steel sea ship class and build rule” and its amendments, complying with MARPOL 73/78. 本船轮机部分设计和建造按 GL 规范及其修改通报的要求进行,同时满足国际防污染公约 1973 及 1978 年议定书的要求。 Environment condition: all major equipments and accessories in the engine room can operate normally in the following conditions: Ambient temperature: 45° C Sea water temperature: 35° C
42/91

REVOLVABLE CRANE 3600T

TECHNICAL SPECIFICATION

Cooling fresh water temperature: 40° C Absolute atmospheric pressure: 0.1 MPa Relative humidity: 60% 环境条件: 机舱所有主要设备和附件均能在下列设计条件下正常运行 环境温度: 45℃ 海水温度:35℃ 冷却淡水温度:40℃ 绝对大气压: 0.1 MPa 相对湿度: 60% According to the characteristic of self-navigation on unrestricted area and operation on unrestricted area, and complying with the requirements of maritime projects and crane operation, it is equipped with two sets of 4500kW steerable thruster driven by electric moter at the aftship and two sets 2500kW retractable azimuthing thruster at thd forship and two set of 2000kW tunnel thruster at bow. The dynamic positioning system is GL Dynpos-Autr class to navigation and positioning in deep water. 根据本船自航于无限航区并在无限航区作业的特点,为满足海洋工程及起重作业的要求, 尾部配备 4500kW 电动舵桨两套,首部设 2500kW 可伸缩电动舵桨两套、2000kW 侧推两套,本船 动力定位具有 Dynpos-Autr 模式控制,方便船舶航行及深水定位。 the requirement of fuel 燃油要求: fuel of main generator sets: HFO(below 800s/1000F, equal to100mm2/s 50℃)or MDO 主柴油发电机组燃油: 重油(800 秒以下/1000F 相当于 100mm2/s 50℃)或重柴油 fuel of harbor generator set: 20# MDO, 0# MDO or -10# MDO 停泊柴油发电机组燃油: 20#重柴油、0#柴油或-10#柴油 fuel of auxiliary boiler: same as harbor generator set 辅锅炉燃油: equipments. 机舱内设集控室,有人值班,对机电设备进行监控。 同停泊柴油发电机组 In the engine room there is a control room with man-watch to monitor and control electric

4.2 Generator sets 发电设备 4.2.1 Main generator sets 主发电机组
Diesel generator sets are equipped with NOx emission certifications, complying with the requirements of MARPOL convention.The diesel engine connect with the generator through resilient coupling directly, and it will be equipped on the common base frame. Flextable mounts will be set between the common base frame and hull foundation. 柴油发电机组要求具备 NOx 排放证书,满足 MARPOL 公约的要求。柴油机与发电机通过弹 性联轴器直接联接,安装在公共底座上,公共底座与船体底座间设弹性减震器。 6 main generator sets which should be capable of running in parallel for continuous operation to be installed. Main parameters as following: 本船设主发电机组 6 台,要求 6 台机组并车运行,主要参数为:
43/91

REVOLVABLE CRANE 3600T

TECHNICAL SPECIFICATION

Set rated power:4150~ 4345kW Set rated speed: 720r/min Set power type: AC 60Hz 6600V Φ0.8 Diesel engine: MAN B&W 9L32/40 or W? RTSIL? 9L32 Max. Continuous power:4320~4500kW Rated speed: 720r/min
机组额定功率: 机组额定转速: 机组电制: 柴油机: 最大持续功率: 额定转速: 4150~4345kW 720r/min AC 60Hz 6600V φ 0.8 MAN B&W 9L32/40 或 W?RTSIL? 9L32 4320`4500kW 720r/min

Accessories and auxiliary equipments (excluding E. G. set) to be provided according to the requirement, such as LT air cooler, L.O. cooler, LT and HT cooling water pump, nozzle cooling water pump, nozzle cooler, LT and HT thermostatic valve, L.O. thermostatic valve, remote control devices and alarms, etc. 根据要求配齐附件及辅助设备(应急发电机组除外) :如低温空气冷却器、滑油冷却器、 高低温冷却水泵、喷油嘴冷却水泵、喷油嘴冷却器、高低温调节阀、滑油调温阀、监测遥控装 置、报警等。 4.2.2 Harbor generator set 停泊发电机组 One harbor generator set to be installed as following : Set rated power: ~1140kW Set rated speed: 900r/min Set power type: 440V 60Hz 3Φ Diesel engine: MAN B&W 5L21/31(ZHENJIANG/CHINA) or DAIHATSU 6DK-20(ANQING/CHINA) 本船设停泊发电机组 1 台,主要参数为: 机组额定功率:~1140kW 机组额定转速: 900r/min 机组电制: 柴油机: 4.2.3 440V 60Hz 3φ MAN B&W 5L21/31(镇江)或 DAIHATSU 6DK-20(安庆)

Emergency generator set 应急发电机组

One emergency generator set to be installed. Compressed air and battery starting system shall be arranged for automatic starting and supply power to important electric equipments. 本船设应急发电机组 1 台,应急柴油发电机组具有压缩空气和蓄电池两种起动方式,自启 动向重要电气设备供电。 Set output: 200 kW
44/91

REVOLVABLE CRANE 3600T

TECHNICAL SPECIFICATION

Set power system: 440V 60Hz 3Φ Speed: 1800r/min Starting system: battery starting and compressed air starting 机组功率: 200 kW 机组电制: 转速: 起动方式: 440V 60Hz 3φ 1800 r/min 电起动和压缩空气起动

4.3 Auxiliary propulsive equipments 辅助推进设备 To comply with the requirement of GL Dynpos-Autr class dynamic positioning system, it is equipped with two sets azimuth thrusters at the aftship and two sets of tunnel thrusters at bow and two sets retractable azimuth thrusters` at the foreship. Accessories and control equipment, hydraulic device to be supplied. 为满足 GL Dynpos-Autr 模式控制的要求尾部设置全回转舵桨 2 套,艏侧推 2 套;首部可 伸缩全回转舵桨 2 套。附属设备及控制设备液压装置一应配齐。 (1) azimuth thrusters 2 sets Type: FPP 360°steerable , upside installation Max. input power: 4500kW Input speed: 900r/min 全回转舵桨 型式: 输入转速: (2) Tunnel thruster 2套 FPP 360 度全回转上部安装 900 r/min 2 sets

最大输入功率: 4500 kW

Type: FPP, driven by electric motor directly Max. input power: 2000kW Input speed: 900r/min 侧推 驱动型式: 输入转速: 2套 FPP 电机直接传动 900 r/min 2 sets

最大输入功率: 2000 kW (3) Retractable azimuth thrusters Max. input power: 2500kW Input speed: 900r/min 可伸缩式全回转舵桨 驱动型式: 输入转速: 4.4 Pump 泵
45/91

Drive Type: FPP 360° steerable , upside installation

2套

FPP 360 度全回转上部安装 900 r/min

最大输入功率: 2500 kW

REVOLVABLE CRANE 3600T

TECHNICAL SPECIFICATION

All types of pumps should obtain GL certifications to adapt and comply with requirements. 各种泵应取得 GL 证书,适应和满足船舶要求。 Electric centrifugal pump’s main materials are the following: 电动离心泵主要材料如下: fluid 介质 casing 泵壳 impeller 叶轮 shaft 泵轴 seal 密封 主要材料如下: gear pump 齿轮泵 casing and cover 壳体与盖 gear 齿轮 shaft/screw 轴/螺杆 seal 密封 cast iron 铸铁 carbon steel 碳钢 carbon steel 碳钢 screw pump 螺杆泵 cast iron 铸铁 carbon steel 碳钢 carbon steel 碳钢 sea water 海水 bronze 铜质 bronze 青铜 stainless steel 不锈钢 mechanical seal 机械密封 fresh water 淡水 cast iron 铸铁 bronze 青铜 stainless steel 不锈钢 mechanical seal 机械密封 齿轮泵和螺杆泵的

Main materials of gear pump and screw pump shall be as follows:

according to manufacturer’s standard 按制造厂标准

The spare parts and tools shall be supplied according to manufacturer’s standard and satisfied with the GL rules.各泵的备件和专用工具按制造厂标准且满足 GL 规范。 4.4.1 Pump for main generator sets and auxiliary boiler 为主发电机组及辅锅炉服务的泵 (1) (2) (3) (4) (5) (6) (7) (8)

HFO transfer pump 2 sets 重油输送泵 MGO transfer pump 2 sets 轻油输送泵 MDO transfer pump 2 sets 重柴油输送泵 L.O. transfer pump 2 sets 滑油输送泵 Sludge pump 1 set 渣油泵 Main SW pump at stern 3 sets 尾部主海水泵 LT FW cooling pump at stern 3 sets 尾部低温淡水冷却水泵 Stand-by feed water pump for auxiliary boiler (supplied with auxiliary boiler) 3 sets 1set
3sets 首部主海水泵

2 sets

辅锅炉备用给水泵(随辅锅炉一起供) (9) Hand pump 手摇泵 (11) Main SW pump at fore (12) LT FW cooling pump at fore 4.4.2 Pumps for whole ship 为全船服务泵 (1) Ballast pump 压载泵 Type: Motor: 型式: 4sets vertical centrifugal type,with self priming 280 kW AC 440V 60Hz 立式离心式,带自吸装置
46/91

(10) Cooling water pump for air compressor 起动空压机冷却水泵

首部低温淡水冷却水泵 3sets

Capacity X head: 2200m3/h X 30m H2O

REVOLVABLE CRANE 3600T 规格: 电动机: (2)

TECHNICAL SPECIFICATION

2200 m3/h×30m H2O 280 kW AC 440V 60Hz 1set 3sets 1set

Bilge water pump 舱底泵 3 sets (3) Bilge water pump in ER 机舱舱底泵 (4) Fire water pump 消防泵
(5) (6) Fire water make-up pump 消防水补压泵

Foam fire pump 泡沫消防泵 1set (7) Sewage pump 污水泵 1set (8) ejector 喷射泵 1set
4.4.3 PUMPS FOR DOMESTIC SERVICE 为生活服务的泵 (1)Sanitary pump 卫生水泵 (2) Fresh water pump 清水泵 (3) Drinking water pump 饮用水泵 (4) Hot water circulating pump 热水循环泵 2sets 3 sets 2 sets 4 sets

4.5 AIR COMPRESSOR AND AIR RESERVOIRS 空压机及空气瓶 For starting air system of diesel engines starting air compressors and starting air reservoirs to be installed in the engine room. Compressed air shall be supplied from starting air reservoirs to for whole ship servlce and whistle through a pressure reducing valve. A hand air compressor be equipped for starting of emergency generator set.为了压缩空气起动柴油机 在机舱内设起动空压机和起动空气瓶。经减压供全船杂用及气笛空气等所需,另外配手动空压 机一台,用于起动应急发电机组。 (1) Starting air compressor 起动空压机 (2)handling air compressor 手动空压机 (3) Starting air reservoir 起动空气瓶 (4)General service air reservoir 杂用空气瓶 (5)Whistle air reservoir 气笛空气瓶 (7)Air dryer 空气干燥器 1set 1set 1set 1set (6)Manoeuvre control air reservoir 操纵控制空气瓶 (8)Emergency air reservoir 应急空气瓶 2sets 1set 2sets 1set

(9)Air operated quick close valve control installation 气控快关操纵装置 1set 4.6 FUEL OIL AND L. O. CENTRIFUGAL OIL PURIFY DEVICE 燃滑油离心分油设备

(1) HFO purifier 燃油分油机 2 sets (ALFA LAVAL) (2) MDO purifier 柴油分油机 1 set (ALFA LAVAL) (3) L. O. purifier 滑油分油机 2 sets (ALFA LAVAL) Each purifier shall be provided with electric control box, steam oil heater, supply pump
and etc.每台分油机配齐电控箱、蒸汽加热器、供油泵等附件。
47/91

REVOLVABLE CRANE 3600T

TECHNICAL SPECIFICATION

4.7 Main generator fuel supply unit 主发电机组燃油供油单元 Fuel feeder/bosster unit 燃油供油单元 4.8Pollution prevention equipment 防污染设备 A bilge oily water separator to be installed. through which the discharge bilge water could be comply with IMO discharge requirement and less than 15 PPM oil content of separated water. An oil content bilge alarm shall be provided, which will alarm if oil content of separated water exceeds the maximum value permitted. The oily-water separator should be capable of separating emulsion. 设置舱底水油水分离器,经分离后达到 IMO 的排放要求,排水中含油量小于 15PPM,并应带排 放监控装置,排放水超标时报警,所选用的油水分离器可分离乳化剂。 Sewage treatment plant to be biological treatment type for 250 persons. The residues should be sent to incinerator for burning. The treated sewage shall be comply with international discharge standard. Grey water from galley shall be led to treatment plant via grease trap,. 生活污水处理装置采用生化法,满足作业时 250 人使用,其污泥送到焚烧炉燃烧,处理后污 水达到国际排放标准,厨房污水先由撇油器除油后再进处理装置。 1set

(1) Bilge oily water separator 舱底水油水分离器 1 set 5 m3/h, with oil content meter (2) Sewage treatment plant 生活污水处理装置 2 sets capability: 150 persons per set (3) Incinerator 焚烧炉 1 set (4) Grease trap 撇油器 2 sets 4.9 Auxiliary boiler and its accessorial devices 辅锅炉及其附属设备 Auxiliary boiler: 2 sets (2 sets assembly hot well), one set for domestic steam, another for oil tanks heating. 辅锅炉数量:2 台(组装式热井模块 2 套)一台供全船生活用蒸汽,另一台供
油舱柜加热。

Type: vertical water needle tube boiler, automatic control load Rated evaporation: ~4500kg/h Rated steam pressure: 0.6 MPa
型式: 额定蒸发量: 额定工作压力: 立式针型管锅炉,负荷自动调节 ~4500 kg/h 0.6 MPa

4.10 Ventilation devices 通风设备 To ensure machinery equipments operating normally and the requirement of heat emission and air changes, the following spaces be equipped with mechanical forced ventilation system. The spaces with possible oily, poisonous and deleterious gas should be equipped with exhaust fan. The vent of exhaust fan should be away from air intake area of diesel engine’s tubocharger as far as possible. 为保证机器设备正常工作以及散热换气需要, 下列处所将提供机械进行强制通风, 对于可 能产生油气有毒有害气体的处所进行抽风, 抽风机的抽风口应尽量远离柴油机增压器进气区域。
48/91

REVOLVABLE CRANE 3600T (1) Ventilator for engine

TECHNICAL SPECIFICATION room 机 舱 通 风 机 (reversible) ( 可 逆 转 )

6 sets exhaust fan for engine room 机舱抽风机 (2) Exhaust fan for purifier room 分油机间抽风机 (3) ventilator for stern azimuth thruster room 尾舵桨舱通风机 (4)ventilator for fore azimuth thruster room 首舵桨舱通风机 (5)ventilator for bow thruster room 首侧推舱通风机 (6)Exhaust fan for sewage treatment room 生活污水处理舱抽风机 (7)Exhaust fan for pipe tunnel 管隧抽风机 (8) Ventilator for emergency generator room 应急发电机室通风机 (10) Exhaust fan for CO2 room CO2 气瓶间抽风机 (11) ventilator for ballast pump room 压载泵舱通风机 4.11 Pressure water tank and heat exchanger 压力水柜及热交换器 (1) (2) (3) (4) (5) (6) (7) 1set 1set 1 set 1 set 2 sets 2sets 2sets 1set 2sets 1set

(9) Exhaust fan for acetylene and oxygen room 乙炔室及氧气瓶室用抽风机 2sets

Fresh water hydrophor 淡水压力柜 Sea water hydrophor 海水压力柜 Drinking water hydrophor 饮用水压力柜 Electric –steam heating calorifier 电蒸热水柜 Electric heating calorifier 电热水柜 Drinking water purifier 饮水净化器 Fresh water generator 制淡装置

2sets 1set 1set 2sets 1set 2sets 3sets((anti-osmotic 50t/d 反渗透式) 2sets 2sets 1set

(8) stern central cooler 尾部中央冷却器 (9) Fore central cooler 首部中央冷却器 (10) fire water hydrophor 消防水压力水柜 4.12 Fire fighting apparatus 消防设备

(1) Fixed local application fire fighting system
机舱局部细水雾灭火设备

:

1 set

(2) Fire fighting apparatus for machinery spaces such as engine room etc and paint store: CO2 fire extinguishing system and 222 bottle of 68L CO2 reservoirs , portable foam applicator and foam extinguisher with carriage.
机舱等机器处所及油漆间消防设备: CO2 灭火装置及 68L 气瓶 222 瓶、空气泡沫枪装置、手 推式泡沫灭火器

(3) Fire water system: fire pump provide high pressure water to whole ship, and fire apparatus complying with relevant conventions to be provided in all spaces. 全船水灭火设备: 由
消防泵提供高压水至全船,各处应配有符合船舶有关公约的消防设备。

(4) Fire fighting apparatus for helicopter platform: foam fire pump, foam proportioning unit, foam fire fighting gun, dry power extinguisher and CO2 extinguisher.
直升飞机平台消防设备:泡沫消防泵、泡沫比例混合器、空气泡沫炮、干粉灭火器、CO2 灭火器。
49/91

REVOLVABLE CRANE 3600T 4.13 Workroom device 机修设备 (1) Universal lathe 普通车床

TECHNICAL SPECIFICATION

1set 1set 1set 1set 2sets 2sets 2sets (revert 待定) 1set 1set 2sets 1000kg

(2) Vertical drilling machine 立式钻床 (3) Table drilling machine 台式钻床 (4) Ox-head planer 牛头刨床 (5) Grinding machine 砂轮机 (6) Vice 台钳 (7) Nozzle testing device 油头试验装置 (9) Electric welding machine 电焊机

(8) Traveling crane or pulley hand calabash 行车或滑车组手拉葫芦 (10) Acetylene -oxygen gas welding device 乙炔氧气焊工具 (11)5 tons traveling crane in the engine room 机舱行车 5 吨 (12)passenger-cargo elevator 客货两用电梯 (13) 1t lifting beam for workshop and purifier room 2 sets 4.14 Quick modulate system for ballast water 快速调载系统 1set

机修间与分油机室起吊装置 1 吨

(1) Remote sounding system of air-blowing type for tank level and four point draught measure 1 set 吹气式舱柜液位、四角吃水测量及遥测装置 1 套 (2)Electric-hydraulic operated butterfly valve and remote control device for ballast system 1 set 1套 1set 压载系统电液蝶阀及遥控装置

(3) Quick modulate system for ballast water 快速调载系统 4.15 Piping 管系

The adjacency and removability of piping layout to be considered as possible. Pipes should be flexible enough to avoid distortion stress from piping expand and constriction or hull distortion. The piping to be supported.. The piping which endure distortion stress should be compensated by necessary measures. 管系布置应尽可能考虑可接近和可拆性。管系应有足够柔性以防止管系由于膨胀和收缩或 船体变形引起的胀缩应力。管子应设置支撑架,承受胀缩的管子,应采取必要的措施加以补偿。 The procedure of mpurity clearing and blowing away impurity by compressed air to be done before piping to be installed. Acid pickling and flushing should be applied for F.O. and L.O. service system of Main and auxiliary engine , hydraulic pipes and control pipes according to manufacture standard or relevant technique. 所有管系安装前应清除电焊渣杂质,并用压缩空气吹清。对主、辅机的燃、滑油日用系 统和液压管路、控制管路等应按制造厂标准工艺或有关工艺进行酸洗处理和清洗。
50/91

REVOLVABLE CRANE 3600T

TECHNICAL SPECIFICATION

Where galvanized piping is applied, the galvanizing to be carried out after welding of flange and acid pickling. If the galvanized piping fabricated on board the welding parts to be touched up with zinc solution of high purity after welding of flange. 对镀锌管一般规定为在法兰焊接完毕经酸洗处理后镀锌。在船上制造的镀锌管可在法兰 焊接后在焊接部分补涂富锌漆。 Small galvanize damaged parts because of inevitable welding should be ouched up with zinc solution of high purity . 由于不可避免的焊接而造成的相对较小的镀锌损坏部分应涂以富锌漆。 All pipes should be painted with mark paint according to CB standard and owner’s requirements. 所有管路按CB标准与船东要求涂标志色漆。 Exterior diameter of all seamless steel pipes should comply with marine industry standards(CB3078-87). 所有无缝钢管外径应遵照船舶工业标准(CB3075-87)。 The flange connection to be adopted between pump, tank and piping which shall be DN20 & above. The flange connection to be adopted as pipe joint when the piping are DN20 & above.. 与泵、柜等相接的公称通径大于 20 mm 以上的一般用法兰连接。管子接头通径 20 mm 以上的一般用法兰连接。 material of pipes should satisfy the following:管系材质按以下要求: 序号 No. 1 2 系统名称 system 压缩空气 compressed air 冷却淡水 cooling fresh water 材 料 material 备 注 remarks

无缝钢管 seamless steel pipes 无缝钢管 seamless steel pipes 一般系统镀锌,柴油机淡水冷却系 统磷化处理 general system piping to be galvanized and pipng for diesel engines system fresh water cooling to be phosphorized.

3 4

冷却海水 cooling sea water 燃油

无缝钢管 seamless steel pipes 无缝钢管
51/91

镀锌 galvanized

REVOLVABLE CRANE 3600T 序号 No. 5 6

TECHNICAL SPECIFICATION

系统名称 system fuel oil 滑油 lub. oil 压载和舱底水 water



料 material



注 remarks

seamless steel pipes 无缝钢管 seamless steel pipes 无缝钢管 镀锌 galvanized 镀锌 galvanized 露天甲板外表涂环氧防锈漆 deck galvanized DN = 300 mm 及以下的排气管采 Exhaust gas pipe with DN=300 mm and below should be seamless steel pipes with 6.5mm

ballast water and sewage seamless steel pipes 7 8 消防水 fire water CO2 灭火 CO2 fire fighting 9 10 热水 hot water 排气 exhaust gas 无缝钢管 seamless steel pipes 热镀锌无缝钢管 galvanized steel pipes steel pipes 钢板卷制或无缝钢管 steel pipes

seamless epoxy anti-rust paint on open

无缝钢管 seamless 镀锌

steel plate or seamless 用壁为 6.5 mm 的无缝钢管

11

疏排水 scupper pipe

热镀锌无缝钢管或镀锌 水煤气管 galvanized steel pipe seamless or pipes

galvanized water gas 12 13 饮用水 drinking water 生活用淡水 domestic fresh water 14 15 16 17 油舱测深管 oil tank sounding pipe 水舱测深管 water tank sounding pipe 仪表用管 instrument pipe 液压油管 不锈钢 seamless steel pipes 无缝钢管镀锌或紫铜管 seamless steel pipes or copper pipe 无缝钢管 seamless steel pipes 无缝钢管 seamless steel pipes 紫铜管 copper pipe 无缝钢管
52/91

镀锌 galvanized

REVOLVABLE CRANE 3600T 序号 No. 18

TECHNICAL SPECIFICATION

系统名称 system hydraulic oil pipe 污水管 sewage pipe



料 material



注 remarks

seamless steel pipes 无缝钢管(加厚) (enhance) 镀锌 seamless steel pipes galvanize 无缝钢管 seamless steel pipes 无缝钢管 seamless steel pipes 镀锌 galvanize

19 20

泡沫灭火管 foam fire pipe 蒸汽及加热管 steam and heating pipe

All piping flanges should be comply with GB2506-89 各管路法兰按 GB2506-89 标准。 The material of sea suction valve to sea of sea water system should be of bronze, and other valve material of systems should be comply with requirement of rules and material of valve attached to the equipment should comply with manufacture standard. 海水系统的通海阀材料采用铜质,其它各系统的阀件材料满足规范要求,随设备附带的阀 件材料按制造厂标准。 All material, fabric, technics and manufacture tolerance of valves and cock should be comply with GB and CB standard. 所有阀件和旋塞的材料、结构、工艺和制造公差应按 GB、CB 标准。 Choose different filter according to the system. 按系统选取不同型式的滤器。 4.16 通风管 Vent-pipe Vent-pipe should be made of anticorrosive painting or galvanization steel plate. 通风管用涂有防锈漆的钢板或镀锌钢板制成。 4.17 Floors, ladders and gratings 花钢板、扶梯及格栅 The engine room should be provided with floors, ladders and gratings for check, operation and maintain of all machinery and as passage way to outside. At the opening of ladders and deck railing should be provided according to practice for safety and convenience of operation. 为检查、操作及维修所有机械设备和作为与外界的通道,机舱内应设有花钢板、格栅及 扶梯。为安全和操作方便,在扶梯开口及甲板开口处均按实际情况设置栏杆。 4.18 动力系统 Power system

(1) Fuel oil system: Two sets of HFO transfer pumps, two sets of MDO transfer pump, two sets of MGO transfer pump, several sets of fuel oil hand pumps (48 l/min), two sets of HFO purifier, one set of MDO purifier, two sets of steam heating HFO heater, one set of steam heating MDO heater, two sets of HFO supply pump, one set of MDO supply pump and fuel
53/91

REVOLVABLE CRANE 3600T

TECHNICAL SPECIFICATION

feeder/booster unit, filter and etc.
燃油系统: 重油输送泵二台,柴油输送泵二台,轻油输送泵二台,燃油手摇泵多台(48 l/min),重油离心分油机二台,柴油离心分油机一台,重油蒸汽加热器二具、柴油蒸汽加热器 一具、重油供油泵二台、柴油供油泵一台及燃油供油单元、滤器等常用设备。 (2)Lub.oil system:two sets of lub.oil transfer pump, one set of lub.oil hand pump (48 l/min),

two sets of lub.oil purifier, two sets of lub.oil heater (steam heating), one sludge tank and one lub.oil clean tank.
滑油系统:滑油输送泵二台,滑油手摇泵一台(48 l/min),滑油离心分油机两台,滑油加热 器两台(蒸汽加热),油渣舱一只,滑油净油舱一只。 (3)Cooling water system: 3 sets of stern main SW pump, 3sets of stern LT FW pump, 2sets of

stern central cooler, 3 sets of fore main SW pump, 3 sets of fore LT FW pump, 2 sets of fore central cooler.
冷却水系统:尾部主海水泵 3 台、尾部低温淡水泵 3 台、尾部中央冷却器 2 具,首部主海水 泵 3 台、首部低温淡水泵 3 台、首部中央冷却器 2 具。 Equipments onboard are cooled by central cooling system, and include stern central cooling water system and fore central cooling water system. Main generator set diesel engine, main generator, harbor generator set diesel engine, air conditioner for stern transducer room, air conditioner for stern rest room, air conditioner for ECR, stern hydraulic pump unit, stern working anchor winch, coolers of stern azimuth thrusters and. motor, atmospheric condenser, air compressor, frequency coverters and transformers for azimuth thrusters motor, main transformers to be included in stern cenral cooling system. Fore center air conditioner, refrigerating installation, fore hydraulic pump unit, fore working anchor winch,air conditioner for fore transducer room, fore retractable azimuth thrusters and electric motor , frequency coverters and transformers for retractable azimuth thrusters motor,tunnel thrusters and electric motor, frequency coverters and transformers for tunnel thrusters motor to be included in fore central cooling system. 本船设备采用中央冷却系统冷却,分为尾部中央冷却水系统、首部中央冷却水系统。主发电 机组柴油机、主发电机、停泊发电机组柴油机、尾部变频器室空调、尾部休息室空调、集控室 空调、尾部液压泵站、尾部工作锚绞车、尾部舵桨及电机冷却器,大气冷凝器,空压机冷却、 舵桨电机变频器及变压器、主变压器等一并纳入尾部中央冷却水系统中。首部的中央空调、冷 藏装置、首部液压泵站、首部工作锚绞车、首部变频器室空调、首部可伸缩式舵桨及电机、舵 桨电机变频器及变压器、首侧推及电机、侧推电机变频器及变压器等一并纳入首部中央冷却水 系统中。 (4)Starting air system: two starting air compressor (191m3/hX3MPa), two starting air reservoirs (6m3X3MPa), one whistle air reservoirs (0.5m3X1MPa), one general service air reservoir (5m3X1MPa) two manoeuvre air reservoirs (0.5m3X1MPa). 起动空气系统:起动空压机 2 台(191m3/hx3MPa) ,起动空气瓶 2 只(6.3m3x3MPa) , 气笛空气瓶 1 只(0.5m3x1MPa) ,杂用空气瓶 1 只(5m3x1MPa) ,
54/91

REVOLVABLE CRANE 3600T

TECHNICAL SPECIFICATION

操纵空气瓶 2 只(0.5m3X1MPa) 。 (5) Steam and condensate、 auxiliary boiler feed water piping system: two sets of auxiliary boilers, two sets of hot well with atmospheric condenser , feed water pump unit (include one stand-by pump) supplied with boiler. One boiler for oil tank heating, and another for domestic use and air-conditioning heating. 辅锅炉蒸汽、凝水给水系统:辅锅炉 2 台,2 套热井带大气冷凝器,锅炉给水泵组(包括 备用泵一台)随辅锅炉供应。一台锅炉供油舱、柜加热,另一台供生活及空调用。 (6)Ballast water system: Four ballast pumps (2200 m3/h), electric-hydraulic operated butterfly valve, level remote sounding system, quick modulate system of ballast water to be included in this system. This system be used in crane operation condition to adjust the trim and heel of ship. 压载水系统:由压载泵 4 台(2200 m3/h)、电控液压蝶阀、液位吃水测量、快速调载系统组成, 配合起吊作业,调整船舶。 (7)Bilge water system and oily water treatment system: three bilge pumps (self-priming), bilge oily water separator (5m3/h), one bilge water tank. 汇集舱舱底水系统及油污水处理系统:舱底泵 3 台(自吸),舱底油污水分离装置(5 m3/h),舱 底水舱 1 只。 (8)Fire water system: three fire water pump, CO2 reservoirs, 135L and 65L Foam extinguisher with carriage and several portable foam applicator. 消防系统:消防泵 3 台, CO2 瓶组,135L、65L 大型泡沫灭火装置,手提式泡沫枪装置几套。 (9)Open deck scupper system: Open decks to be drained by deck scuppers and led to overboard directly. 露天甲板疏排水系统:露天甲板的排水直接排舷外。 (10)Enclosed spaces scupper system: Drainage from bathroom lavatory, washbowls, laundry, basin sink on main deck and above deck to be led through storm valve and discharged to overboard directly. 舱室疏排水系统:上甲板及其以上各层的浴室、盥洗室、洗脸盆、洗衣房、洗池等疏排水直接 通过防浪阀排至舷外。 (11)Sewage treatment system:Two sets of sewage treatment plants, one sewage pump, Raw sewage from toilet and drainage from hospital, drains from galley (via grease trap) to be led to sewage treatment plant. After treated, the sewage meet to rule’s discharge requirement shall be directly discharged to overboard and the remaining sludge shall be discharged to incinerator for burning. Furthermore, raw sewage shall be be led to overboard directly in another way for emergency. In some ports, the treated sewage also be not allowed to discharge then it be drained to the sewage tank and discharged after ship have been left the ports. 生活污水处理系统:生活污水处理装置二台,污水泵一台,厕所的粪便污水及医务室脸盆疏水 及厨房用水(经撇油器后)均引入生活污水处理装置,经处理后,符合法规对生活污水排放的要 求,可直接排出舷外,残存在装置内的污泥泵到焚烧炉焚烧。此外,粪便污水尚接一路直接排
55/91

REVOLVABLE CRANE 3600T

TECHNICAL SPECIFICATION

舷外作应急用。有些港口,即使处理过的污水亦不允许排出,则排入污水舱,出港后适时排出。 (12)Domestic water system: two sets of fresh water hydrophor , one set of sanitary water

hydrophor, one set of drinking water hydrophor three fresh water pumps, two sanitary water pumps, two drinking water pumps, three sets of calorifier and four hot water circulating
pumps . Three sets of 50t/d anti-osmotic fresh-water generator should be provided to make-up the lack of fresh water. 生活水系统:淡水压力柜 2 具,卫生水压力柜 1 具,饮用水柜 1 具,清水泵 3 台,卫生水泵 2 台,饮用水泵 2 台,热水柜 3 具,热水循环泵 4 台。配置 50t/日反渗透造水机 3 台,以补充淡 水不足。 (11)Mechanical ventilation: The following places or areas, such as engine room, purifier room , stern and fore azimuth thrusters room,tunnel thrusters room, ballast pump room, sewage treatment room and foam fire pump room shalll be equipped with mechanical ventilation or exhaust system 机械通风:机舱、分油机室、首尾舵桨舱、侧推舱、压载泵舱、生活污水处理及泡沫消防泵舱 进行机械通风或抽风。

4.19 Paint 油漆
Piping and valves in engine room will be painted with one priming coat and two pigmented paints after installtion. For the purpose of easy identification, all piping will be sorted and painted with different color.according to function. 机舱内的管路和阀件在安装完毕后,都将刷上油漆:一道底漆,二道色漆。 所有管路根据其用途分别刷以不同颜色的油漆,以利识别。

4.20 Spare parts and Tools 备件与工具
The quantity of spare parts should be supplied according to equipments manufacturer’s standard and GL rules. General tools shall be supplied as normal and according to owner’s requirements. 各机械设备之备件根据生产制造厂的供应标准,但必须符合 GL 船级社的规定。 通用工具根据船东要求及常规供应。(Spares required for the first 2 years of maintenance and operation to be supplied)要求备件在最初两年使用中维修保养

56/91

REVOLVABLE CRANE 3600T

TECHNICAL SPECIFICATION

5. Electrical Equipment 电气部分 5.1 General Principle 总则
(1) The main electrical equipment will be to comply with the marine environmental conditions and to have GLGL certificate. (2) The marine cables temperature class will be to permitted in 85℃. The power cables conductor cross-section of less than 1.5mm2 and the lighting and control cables conductor cross-section of less than 1mm2 are not to be used. (3) The cables laying will be according to the technology of the shipbuilding. 1)主要电气设备均应符合船用条件并取得 GLGL 认可证书。 2)电缆选用船用电缆 电缆允许最高工作温度为 85℃。 电力电缆截面不小于 1.5mm2,照明及控制电缆截面不小于 1mm2。 3)电缆敷设按照船舶建造工艺

5.2 Inspect and test 检验和试验
The inspect and test of the electrical equipment will be according to the requirements of “the test outline of the electrical equipment” of this vessel design. The test report will be provided to owner. 电气设备的检验和试验应按本船“电气设备试验大纲”的要求进行。试验应作好记录,试验报 告应向船东提交。

5.3 Electric Power Source 电源 5.3.1 General rule 通则 The power station consist of main generator, harbor generator, emergency generator and relative transformers:
本船电站由主发电机、停泊发电机、应急发电机及相关变压器等组成:

Main generator
主发电机

6 set

AC6600V

60Hz

3 phase 3 wire with neutral earthed
3 相 3 线高阻接地系统

Harbor generator
停泊发电机

1 set 1 set

AC440V AC440V

60Hz 60Hz

3 phase 3 wire insolated
3 相 3 线绝缘系统

Emergency generator
应急发电机

3 phase 3 wire insolated
3 相 3 线绝缘系统

Main transformer
主变压器

2 sets

Kitchen transformer 4 sets
厨房变压器

Lighting transformer 2 sets
照明变压器

3 phase 6600V/440V 3 wire insolated 60Hz 3 phase 440V/440V and 440V/230V 3 wire insolated 3 线绝缘系统 60Hz 3 phase 440V/230V 60Hz 3 wire insolated
3 线绝缘系统

57/91

REVOLVABLE CRANE 3600T

TECHNICAL SPECIFICATION

Emergency lighting 2 sets transformer
应急照明变压器

3 phase 440V/230V 60Hz

3 wire insolated
3 线绝缘系统

Battery 蓄电池 Shore 岸电

5 sets 1 set

24V 400Ah AC440V 60Hz

2

wire

insolated

2 线绝缘系统

3 phase 3 wire insolated
3 线绝缘系统

6 sets main generators may be to operate parallelly continually . The harbor generator and main transformer will be to permit operation parallelly short time to transfer load. Between main generator, harbor generator and emergency generator will be to lock.
Between shore and any generator will be to bock.

During harbor, this vessel can be supplied by shore for lighting and daily life.
6 台主发电机可以长期并联运行。 停泊发电机和变压器可以短时并联运行转移负荷。 主发电机、停泊发电机和应急发电机相互联锁。 岸电和各发电机相互联锁。 停泊时,起重船可以采用岸电供电,供照明和生活设施用。

5.3.2 Generator 发电机 The generators specification are: 发电机技术规格如下
Main generator 主发电机 phases 相数 Rated power/kW 额定功率/kW Rated voltage/V 额定电压/V Rated speed/r/min 额定转速/r/min Rated pf. (lagging) 额定功率因数(滞后) Operation 工作制 Excitation 励磁 Frequency/Hz 频率/Hz Cooling method 冷却 3 4345 6600 720 0.8 S1 Harbor generator 停泊发电机 3 1140 440 900 0.8 S1 Emergency generator 应急发电机 3 200 440 1800 0.8 S1 Brush less 60 F Air

Brush less 无刷自励 Brush less 60 60 F Air 空气
58/91

Insulation class 绝缘 F Air-water 空气-水

REVOLVABLE CRANE 3600T Degree of

TECHNICAL SPECIFICATION

protection 防护形式

IP54

Ip23

IP23

5.3.3 Transformer 变压器 The transformers specification are. 变压器技术规格如下
Emerg. Main 主变压器 Phase 相数 Rated power/kW 额定 容量 Primary voltage/V 初级 电压 Secondary voltage/V 次 级电压 Frequency/Hz 频率 Type 型式 Operation 工作制 Insulation class 绝缘 Vector group 连接方式 Cooling method 冷却 Degree of protection 防 护形式 3 3150 6600 440 60 cast resin S1 F Ddo AF Ip23 Lighting lighting Kitchen Kitchen transformer transformer transformer transformer Transformer 照明变压器 应急照明变 厨房变压器 厨房变压器 压器 3 200 440 230 60 dry S1 F Ddo AN Ip22 3 63 440 230 60 dry S1 F Ddo AN Ip22 3 63 440 440 60 dry S1 F Ddo AN IP22 3 30 440 230 60 dry S1 F Ddo AN Ip22

5.3.4 Battery, Shore Power Supply and UPS 蓄电池、岸电、UPS
5 sets battery 24V 400Ah lead-acid type. Shore power is to be 440V 1200A capacity. UPS capacity will to be comply with the load consumption. 五台 24V400Ah 酸性蓄电池 400V1200A 容量的岸电 UPS 容量满足负载需要

5.4 Distribution switchboard
6600V switchboard 22 panels, 440V switchboard 20 panels, 440V emergency switchboard 3 panels and crane switchboard 5 panels. 6600V switchboard will be to provided the power management system PMS. 6600V 配电板 22 屏、440V 低压配电板 20 屏、440V 应急配电板 3 屏及起重机配电板 5 屏。 6600V 配电板配置功率管理系统 PMS。

5.5 Estimated loading of electric power plant / KW 电站电力负荷估算/kW
59/91

REVOLVABLE CRANE 3600T DP lifting

TECHNICAL SPECIFICATION DP laying DP 铺管 19400

Sailing 航行 Total load 总负荷 In6600V 荷 In440 load Generator 发电机 Load ratio Main Load ratio Stand-by Stand-by 器 /%发 transf. /%主 gene transf 电机负荷率/% /KVA 主变压器 变压器负荷率/% /kW 备用发电机 /kW /kW 其中 440V 负荷 1380 3x4345 79.6 1x3150 54.8 3x4345 load /kW 10380

Ballast 压载 2480

Move 移船 2500

Harbor 停泊 880

Emergency 应急 180

DP 起重 19400

/kW 其中 6600V 负 9000

17900

17900

/

1200

/

/

1500 5x4345 89.3 1x3150 59.5 1x4345

1500 5x4345 89.3 1x3150 59.5 1x4345

2480 1x4345 57.1 1x3150 98.4 5x4345

1300 1x4345 57.5 1x3150 51.6 5x4345

880 1x1140 77.2 / / /

180 1x200 90 / / /

/KVA 备用主变压 1x3150

1x3150

1x3150

1x3150

1x3150

/

/

During the DP state, the one generator set will be to spare which is complied with the requirement of the DP2 class for generator redundance. 注:DP 工况时有 1 台主发电机组备用,符合 DP2 动力定位对发电机有冗余的要求。

5.6 Electric boxes 电箱
The distribution device consists of the power distribution box, power supply box on deck for operation, lighting distribution box, navigation / communication distribution box, charge and discharge box, shore connection box and electric test box: 分配电装置、动力分电箱、甲板作业供电箱、照明分电箱、助航通信分电箱、充放电箱、岸电 箱、电工试验箱

5.7 Control equipment 控制系统 5.7.1 Azimuth propulsion and tunnel thruster 全回转舵桨推进器及侧推
All azimuth propulsion and tunnel thrusts will be to apply fix pitch propulsion by converter drive, the motor for primary engine provides power, the thrust of the propulsion can be changed by means of change motor speed. The motor can be controlled by converter, the control can be transfered between in wheelhouse console and local converter cabinet.
60/91

REVOLVABLE CRANE 3600T

TECHNICAL SPECIFICATION

全回转舵桨推进器及侧推均采用定距桨变频调速控制,电动机作为原动机提供动力,推进器改 变推力及功率用改变电动机转速的方法进行。 对电动机采用变频器进行控制,可在驾控台上遥控及在变频柜上就地转换控制。 Motor type Phase Power /kW induction motor with squirrel cage rotor 3 main azimuth propulsion 4500 Bow tunnel thruster 2000 Retractable azimuth thruster 2500 Voltage /V Speed /r/min Frequency /Hz Operation Cooling method Type of construction Insulation class Degree of protection Converter type 型式 相数 功率/kW 电压/V 转速/rpm 频率/Hz 工作制 冷却方式 安装方式 绝缘 防护形式 变频器型式 3 4500/2000/2500 待定 900 60 S1 空气-水 立式 F IP55 24 脉冲 PWM 交-直-交变频器矢量控制 to await 900 or 720 60 S1 Air-Water IMV1 F IP55 24 pulse PWM AC-DC-AC vector control converter 交流鼠笼电动机

5.7.2 Positioning anchor winch 锚绞车
Positioning anchor winchs will be to apply converter drive. Motor type Phase Power /kW Voltage /V Speed /r/min Frequency /Hz Operation induction motor with squirrel cage rotor 3 400 690 720 60 S1
61/91

REVOLVABLE CRANE 3600T Cooling method Insulation class Degree of protection Converter type 型式 相数 功率/kW 电压/V 转速/rpm 频率/Hz 工作制 冷却方式 安装方式 绝缘 防护形式 变频器型式 3 400 690 720 60 S1 空压 立式 F IP55 交流鼠笼电动机

TECHNICAL SPECIFICATION force air F IP55

12 pulse PWM AC-DC-AC vector control converter

12 脉冲 PWM 交-直-交变频器矢量控制

5.7.3 Ballast pump 压载泵
The ballast pump motor will be to apply low voltage 440V motor by soft starter starting. The ballast pump control can be transfered between in wheelhouse console and local starter. 压载泵采用 440V 分配电板断路器供电、电动机电压 440V,软起动器起动方法。 压载泵可在驾控台遥控及在压载泵附近就地控制转换。

5.7.4 Engine central control room and console control desk 机舱集控室
Console control desk is equipped and located in engine central control room to monitor and control all equipments and apparatus in engine room. 机舱集控室设置机舱集控台,作为机舱机电设备集中监视和运行控制的设备。

5.7.5 Bridge console of the wheelhouse
The bridge console will be to install in the wheelhouse for central control and monitoring navigation equipment. (1) Azimuth propulsion remote start or stop and speed adjustment (2) Bow thrust remote start or stop and speed adjustment (3) Ballst pump motor remote start or stop and ballst water valve control (4) Ballst tank level and vessel draft monitoring device (5) Positioning anchor winch remote start or stop and speed adjustment (6) Positioning anchor winch room and vessel important place TV monitoring device (7) Communication and navigation equipment. the console can be one or more sets according to the system function. 驾驶室设置驾控台,作为全船航行、作业(除起重机)的集中监视和运行控制的设备 (1) 舵桨电动机遥控起停和调速控制 (2) 艏侧推电动机遥控起停和调速控制
62/91

REVOLVABLE CRANE 3600T

TECHNICAL SPECIFICATION

(3) 压载泵电动机遥控起停和压载舱阀门控制 (4) 全船压载舱液位及船舶吃水的监视装置 (5) 锚泊绞车调速控制 (6) 定位绞车舱及船舶重要部位的电视监视装置 (7) 通讯、导航设备 驾控台可按系统功能做成一台或多台。

5.8 Lighting and illumination 照明
The lighting lamp and control device will be to install according as the requirement of various place. 根据各场所配相应照明灯具及控制设备

5.9 Inner communication 船内通讯
The command telephone, daily service telephone, public address system, radio / TV antenna and satellite communication / TV device, engineers call system, refrigerating chamber call system and sick bay call system will be to install. 指挥电话、程控电话、广播、广播电视天线 系统与船载卫星广播电视、广播电视天线设置、轮机员呼叫装置、冷库呼叫系统、病房呼叫系 统

5.10 Television monitoring system 电视监视装置
The TV monitor will be to install on the bridge console, power source AC220V. The focusing color camera will be to install on the port and starboard of the helicopter platform, the fix focus color camera will be to install in the position anchor winch room. 在驾驶室集中控制台设有电视监视器,工作电源为 AC 220V,在直升机平台左右设变焦彩色摄 像头,在定位绞车舱装有定焦摄像头。

5.11 Local area network 局域网系统 The vessel will be arranged local area network. 本船设有局域网系统 5.12 Alarm system 报警系统 Alarm system on board will consist of audible and visual alarm plant, fire alarm, general alarm, watertight alarm, CO2 releasing alarm system and engine room monitoring system.
机舱声光组合报警板、火灾报警、通用报警、水密门报警、CO2 释放预告警系统、机舱监测报 警系统

5.13 Navigation and communication apparatus 1) Sounding apparatus 测深仪 2) Radar 雷达 3) DGPS DGPS 卫星导航仪 4) Gyrocompass 电罗径 5) Meteorological apparatus 船舶气象仪 6) Weather map facsimile receiver 气象传真接收机 7) AIS (Automatic Identification System) 船舶自动识别系统 8) Rain-water cleaner and wiper 雨雪清除器和刮水器 9) Fog diaphone 雾航气笛
63/91

2 units 2 units 2 units 1 unit 1 unit 1 unit
(AIS)

1 unit 6 units 1 unit

REVOLVABLE CRANE 3600T

TECHNICAL SPECIFICATION

10) Automatic steering gear 自动操舵仪 11) Navigation data recorder 船舶航行数据记录器(VDR) 12) GMDSS 13) NAVTEX 14) Satellite communication F station 卫通 F 站 15) Ultra short wave radio station for helicopter 直升机对空超短波电台 16) Aviation wireless radio-phare set 航空无线电信标机(NDB) 17) Two-way VHF for life boat 救生艇双向甚高频无线电话 18) EPIRB 19) SART 20) SSAS

1 unit 1 unit 1unit 1 unit 1 unit 1 unit 1 unit 3 units 1 unit 2 units 1 unit

64/91

REVOLVABLE CRANE 3600T

TECHNICAL SPECIFICATION

6. Ventilation, air condition and refrigerating system 通风、空调、冷藏系统 6.1 Ventilation system 舱室通风系 Mechanical ventilation and natural ventilation system will be applied at working compartments which are not covering in air conditioning system. The mechanical ventilation system will content to the requirement of air exchange ratio. The ventilation system in air conditioning compartments will achieve positive draft.
本船在非空调区域的有关工作舱室设置机械通风或自然通风,通风系统的配置满足舱室一定的 换气次数;而处于空调区域的舱室,其通风系统的设置则需兼顾维持空调区域正压的要求。

6.1.2 换气次数 air exchange ratio the air exchange ratio of main cabin: 本船主要舱室通风系统换气次数如下:
No 通风处所 名 称 name of ventilation area 换 气 次 数 排风 进风型式 mode of air exchange 型 inlet air ratio(T/H) (次/时) 式 换 气 次 数 (次/时) exchange ratio(T/H) 1 2 3 4 单 元 卫 生 间 toilet 空调回风 return unit toilet bathroom 拍 片 冲 洗室 photo dark room 空调送风 inlet air by condition 5 洗衣室 laundry 自然 natural / 机 械 mechinery 机 械 15~20 10~12 机 械 machinery ~12 air by condition air by condition air by condition 公 共 厕 所 public 空 调 回 风 return 公 共 浴 室 public 空 调 回 风 return / / / 机 机 机 械 械 械 machinery machinery machinery ~15 20~25 15~20 排风≧空调 送风 of aircondition 局部空调定 点送风 inlet air of aircondition 6 7 干 衣 间 room 蓄 电 池 室 drying 自然 natural / mechinery 机 械 25~30 local air draft≧inlet air 备 注 remark

(mode of air air draft)

accumulator room
8 and room

cell 自然 natural

/

mechinert 机 械

~30

ExdIIC-T1

充 放 电 间 charge discharge 自然 natural /

mechinery

15~20

65/91

REVOLVABLE CRANE 3600T No 通风处所 名 称 name of ventilation area

TECHNICAL SPECIFICATION 换 气 次 换 气 次 数 排风 数 式 (次/时) exchange ratio(T/H) 排风≧空调 备 注 remark

进风型式 mode of air exchange 型 inlet air ratio(T/H) (次/时)

(mode of air air draft)

9

医务室 infirmary 空调送风 inlet air of condition 10~15 机 械 mechinery 12~15





air

draft≧inlet air of aircondition

10

更衣室 cloth locker 空 调 回 风 / 自 然 return air by / condition /natural





mechinery 机 械

~8

11

被 服 间 bedding 空 调 回 风 / 自 然 rooms return air by / aircondition /natural

mechinery 机 械

~5

12

空 调 器 室 condition room

air 空 调 回 风 / 自 然 return air by / aircondition /natural

mechinery 机 机 机 械 械 械

~8 局部排风 local air draft 局部排风 local air draft 局部排风 local air draft 局部空调定 点送风 air draft ~40 of aircondition local

13 14 15 16

驾 驶 室 navigation 空调送风 inlet air room of condition of condition 餐 厅 dinner room 厨 房 kitchen 机械 mechinery 空调送风 inlet air of condition 会议室 meeting room 空调送风 inlet air

~15 ~12 ~12

mechinery mechinery mechinery

/ / /

~35





mechinery

17 18 19 20

空 调 机 室 condition room 冷 冻 机 refrigerant room

air 机 械 / 自 然 mechinery/natural 室 机 械 / 自 然 mechinery/natural 空调送风

12~25 ~30 8~10

机 机 机

械 械 械

mechinery mechinery mechinery 机 械

15~30 ~30 8~10

健身房 gymnasium

被服舱 bedding cabin 空调送风/自然 air conditioning ~6
66/91

supply/natural

mechinery

~6

REVOLVABLE CRANE 3600T No 通风处所 名 称 name of ventilation area

TECHNICAL SPECIFICATION 换 气 次 换 气 次 数 排风 数 式 (次/时) exchange ratio(T/H) 备 注 remark

进风型式 mode of air exchange 型 inlet air ratio(T/H) (次/时)

(mode of air air draft) 机 机 机 机 机 械 械 械 械 械

21 22 23 24 25 26

液 压 泵 站 hydraulic pump station 定位绞车舱 mooring position winch room. 管隧 pipe tunnel 油漆间 painting room 灯 间 lighting room 乙 炔 室 acetylene room

自然 natural 自然 natural 自然 natural 自然 natural 自然 natural

/ / / / /

mechinery mechinery mechinery mechinery mechinery 机械/自然

10~20 6~8 6~8 ~15 ~15 ExdIIB-T3 ExdIIA-T3

自然 natural

/ /

mechinery/n ~15 atrual 机械/自然 ~15 mechinery/n atural

ExdIIC-T2 ExdIIC-T2

27

氧 气 室 oxygen 自然 natural room

28

祈祷室 room

orison 空 调 送 风

air ~8

机械 machinery ventilation

~8

conditioning supply

上述未提及的处所通风要求见相关专业的技术规格要求 see the relating technical specification about the ventilation requirement of some cabin which have not mentioned

6.2 空调系统 air condition 6.2.1 Designing condition 设计条件 ? Summer 夏季
The air conditioning system is designed to achieve the temperature of dry bulb thermometer at 27℃with relative humidity at 50% 95%。舱内空气设计干球温度 27℃@相对湿度 50%。 in its covering areas when outer environment is 45℃ with relative humidity at 95% . 舱外空气设计干球温度 45℃@相对湿度

? Winter 冬季 The air condition system is designed to achieve the temperature of dry bulb thermometer at 22℃with relative humidity at 40% in its covering areas when outer environment is -20℃with relative humidity at 50%. 舱外空气设计干球温度-20℃@相对湿度 50%,舱内空气计算干球温
67/91

REVOLVABLE CRANE 3600T 度 22℃@相对湿度 40%。

TECHNICAL SPECIFICATION

? Fresh air criteria 新风量标准 Living compartment: 28.8M3 /H Per person Public rooms: 18-25 28.8M3 /H Per person The ratio of fresh air to air of system will be from 40% to 50%.
居住舱室每人新风量:28.8 m3/h。 公共舱室每人新风量:18~25 m3/h。 全空气间接式空调系统新风比:0.40~0.50。

6.2.2 Air condition covering areas 实施空调的区域
? ? ? ? ? ? ? ? ? ? Living compartment 全船生活住舱 Navigation bridge 驾驶室 Meeting room 各类会议室 Dining room or dining saloon 各类餐厅; Dispensary 医务室 Gymnasium 健身房 engining room console and stern lobby(separated air condition) 机舱监控室及艉部休息室(独立式空调) washing room(spot cooling)洗衣房(局部定点空调送风) kitchen(spot cooling) 厨房(局部定点空调送风) grain depots of crew and construction sub-contractor galley, (spot cooling) 船员、施工人员粮食库(局部定点空调送风)

6.2.3 Air-conditioner mode 空调方式
The packaged air conditioners shall be respectively provided for E.C.R. frequency converter room and relaxation room located at stern. (The packaged air conditioners shall be with refrigeration compressor and direct expansion system. Environmental protection refrigerant R-404A). The air-conditioning system shall be of single duct, one time recirculated, definite volume indirect type air handling unit. Air via ducts be operated in indirect type air conditioner (heating/cooling, humidity, filter) supplied to air conditioning area, holding design criteria. Indirect air conditioner’s evaporator shall be have the ability of heating or cooling air. Cooling medium water shall be supplied by water chilling unit in Summer. Heating water shall be supplied by steam pump via steam-water exchanger in Winter. Humidity steam shall be supplied in Winter. 机舱监控室及艉部休息室变频器室采用独立式水冷柜式空调机(带制冷压缩机、直接蒸发 式、环保制冷剂 R-404A );其余空调区域则采用单风管一次回风、定风量间接蒸发式集中中 央空调,即通过风管系统将空气在间接式空调器内一次处理(热、湿、过滤等)后送至各被调舱 室,以维持一定的舱室温(湿)度。间接式空调器的空气处理盘管为冷热共用型,即夏季由冷水 机组提供冷媒水而冬季则通过(蒸)汽-水热交换器提供热媒水,冬季加湿则采用蒸汽。

6.2.4 Center air conditioner cool、hot headstream 中央空调冷、热源
Cooling medium of central air conditioning system is chilling water from four (3) sets of marine
68/91

REVOLVABLE CRANE 3600T

TECHNICAL SPECIFICATION

screw compressor chilling units with central fresh water cooling. Heating medium is hot water from 3 sets of steam-water heat exchanger heated by boiler steam. And steam is used for humidification of indirect type central air handling unit and 100% fresh air handling unit (for gally) too. Equip 2 set cool/hot intermedium water pump, 1 in use 1by standby, supplied center air conditioner cool/hot intermedium water circle. 中央空调冷源采用船用螺杆式冷水机组 3 套,中央淡水冷却. 中央空调热源采用(蒸)汽-水热交换器 3 只,由蒸汽锅炉提供热交换器蒸汽(并向间接式中 央空调器/间接式厨房新风空调器提供加湿蒸汽)。 设冷/热媒水泵 2 台,1 用 1 备,供中央空调冷/热媒水循环用。 6.2.5 control of the air-conditioner system 空调系统的控制 1) PLC auto operating and safe protecting control will be set in the cool water machine, it can auto work under the designed temperature, and the terminal user can work under the designed temperature. The safe control include: compressor inlet/outlet pressure protection, compressor oil-pressure protection, voltage protection, cooling water pre-freezing protection, interlock protection or loss-of-coolant protection for cooling medium water and chilling water etc. 冷水机组设有 PLC 全自动运行和安全保护控制,能按 设定的出水温度进行自动运行,从而保证空调用户末端在设计进水温度条件下工作;同时, 冷水机组的安全控制包括有:压缩机吸、排汽压力保护,压缩机油压保护,电压过载保护, 冷媒水防冻保护,以及冷媒水、冷却水连锁或失水保护等等。 2) Steam-water heat exchanger has got steam flow-controlling valve. It controls the steam flow through detecting water-temperature in order to control the temperature of water supply. In this way the air-conditioning can operate within the designed temperature range. 汽-水热交换器设有蒸汽流量调节阀,通过感应出水温度来控制加热蒸汽量从而控 制冬季采暖热水供水温度,以保证空调用户末端在设计进水温度条件下工作。 3) The end equipment consists of: indirect type central air handling unit and 100% fresh air handling unit (for gally). The operational control style of the former one is: 空调末端设备 主要包括有:间接式中央空调器、间接式厨房新风空调器,它们的运行控制是: The indirect type central air handling unit: thermostats of indirect type air conditioner influence air return temperature to control 3-way flow valve to regular cooling/heating medium water volume (via evaporator of indirect air conditioner), control cooling/heating capacity of AHU. Hygrostat of indirect type air conditioner influence air return humidity to control steam volume for humidification in Winter. The 100% fresh air handling unit (for gally): Thermostats of 100% fresh air handling unit influence air supply temperature to control 3-way flow valve to regular cooling/heating medium water volume, control cooling/heating capacity of 100% fresh air handling unit. Hygrostat of 100% fresh air handling unit influence air supply humidity to control steam volume for humidification in Winter. 间接式中央空调器通过温控器感应回风温度来控制三通流量调节阀的冷热媒水旁通水量(亦即
69/91

REVOLVABLE CRANE 3600T

TECHNICAL SPECIFICATION

流经空调器盘管的冷热媒水量) ,从而调节空调器的制冷、制热量,并由湿度控制器感应回风 相对湿度来控制冬季加湿蒸汽量;间接式厨房新风空调器是通过温控器感应送风温度来控制三 通流量调节阀的冷热媒水旁通水量进而调节新风空调器的制冷、制热量,并由湿度控制器感应 送风相对湿度来控制冬季加湿蒸汽量。 4) Individual water-cooling cabinet style air-conditioner, has its own cooling source, with operation and protection controlling system integrated. It only needs cooling water and power supplied to start working in required condition. 独立水冷柜式空调机自带冷源、包 括运行和保护控制系统自成一体,船上只需连上冷却水和电源便可按设定条件整体自动运 行。

6.2.6 Main equipments in air conditioner 空调系统主要设备 (1) screw mode cool water machine 3 set( indent technical specification in rule) electrical expand valve support
船用螺杆式冷水机组 电子膨胀阀供液; (2) 3 set gas-water hot exchanger (indent technical specification in rule) 汽-水热交换器 3 只(以订货技术规格书为准) (3) Marine indirect type central air handling unit 船用间接式中央空调器 (4) Marine 100% fresh air handling unit (for gally) 船用间接式厨房新风空调器 (5) 2 sets cool water counter air conditioner 船用水冷柜式空调机 (6) 2 sets air conditioner cool/hot intermedium water pump (1 in use and 1 standby) 空调冷/ 热媒水泵 2 台(1 用 1 备) ~200 只 1只 (7) 3 sets electrical water processor (?)电子水处理仪 3 只 (8) approximately 200 sets types of ventilation terminal 各类布风器 (9) Expansion chamber of cooling/heating medium water 冷/热媒水膨胀水箱 3 套(以订货技术规格书为准)

6.3 mess deepfreeze system 伙食冷藏系统
This ship shall be provided to two (2) sets of refrigeration system for sailor and worker. Design criteria as follows: 本船设船员、施工人员伙食冷藏系统各 1 套。伙食冷藏系统的外界 设计条件与空调系统一致;对船员、施工人员伙食冷藏系统的配置要求如下:

6.3.1 Outer condition of design tank:设计参数
(1)Refrigerated system for sailor:90P keeping day:60days Parameter of refrigeratory: tank fish tank meat tank vegetable tank temperature(° C) -18 -18 4
70/91

REVOLVABLE CRANE 3600T dairy tank lobby room 船员伙食冷藏 按定员 90 人,自持力 60 天

TECHNICAL SPECIFICATION 2 temperature in balance

The net volume between the cooling room and the freezing room can be adjusted

冷库组成:鱼库、肉库、乳品库、蔬果库、缓冲间。 冷库主要参数: 库 名 鱼 库 肉 库 蔬果库 乳品库 缓冲间 库温(℃) -18 -18

4
2 平衡温度

低温库之间和高温库之间的净库容允许作适当调整。 (2)Refrigerated system for worker:150P keeping day:60days Parameter of refrigeratory: tank fish tank meat tank vegetable tank dairy tank lobby room temperature(° C) -18 -18 4 2 temperature in balance

The net volume between the cooling room and the freezing room can be adjusted, the vegetable tank can be separated. 施工人员伙食冷藏 按定员 150 人,自持力 60 天 冷库组成:鱼库、肉库、乳品库、蔬果库、缓冲间。 冷库主要参数: 库 名 鱼 库 肉 库 蔬果库 乳品库 缓冲间 库温(℃) -18 -18 4 2 平衡温度

低温库之间和高温库之间的净库容允许作适当调整,蔬果库可作分隔。
71/91

REVOLVABLE CRANE 3600T

TECHNICAL SPECIFICATION

6.3.2 Main devices for frigrator system 制冷方式
R-404A direct expansion, electric heating defrost for evaporator, refrigeration equipment in cooling/freezing room shall be use unit coolers. 采用环保制冷剂 R-404A 直接蒸发式、库内冷 风机强制冷却的方式;冷风机融霜形式为电加热融霜。

6.3.3 冷藏装置
(1)、refrigerating plant 2 set (for sailor and worker) 4 set (original import, 2 in use and 2 standby) 4 set 4 set 4 set 4 set unlock refrigeration compressor liquild receiver oil separator control panel (2)、unit coolers (1)冷藏装置 开启式制冷压缩机 卧式壳管式冷凝器 储液器 油分离器 装置电控箱: (2)冷库冷风机 2 套(船员、施工人员各一套) 4 台(原装进口,二用二备) , 4只 4只 4只 4只

Horizontal shell and tube condensator

7 Crane Part 起重机部分 7.1 Machanism for Crane 起重机械 7.1.1 General 概述 Main hook、auxiliary hook and small hook could work at one time by the instance of not full burthen; Hoisting and luffing could not work at one time, hoisting and revolving could not work at one time; luffing and cricumgyrate could not work at one time; the parameter is as followings: 主钩、副钩、小钩在非满负荷时可同时工作;起升和变幅不可同时工作,起升和旋 转不可同时工作;变幅和旋转不可同时工作。各工况下的参数如下: (1) Main hook singlel work Main hook load: 4400tx37m(stationary over stern) 3000tx30m (revolving) , speed with full load: 2.5m/min speed with empty load: 5.0m/min Max. stability power: 4x850=3400kw (1)主钩单独工作时 主钩最大起重量:4400tx37m(船艉固定) ,3000tx30m(旋转)
72/91

REVOLVABLE CRANE 3600T 速度为 2.5m/min

TECHNICAL SPECIFICATION

空载速度为 5.0m/min 最大稳态功率:4×850 = 3400kW (2) Auxiliary hook single work Auxiliary hook load: 550t, speed with full load: 8.0m/min speed with empty load: 16.0m/min Max stability power: 2x850=1700kw 副钩单独工作时 副钩最大起重量:550t,速度为 8.0m/min 空载速度为 16.0m/min 最大稳态功率:2×850 = 1700kW (3) Luffing with loading Main hook load: 4400t The time of span from 40m to 30m is 6.5min Max stability power: 2x850=1700kw 带载变幅工作时 主钩最大起重量:4400t 跨距从 40m 至 30m 时的时间约为 6.5min 最大稳态功率:2×850 = 1700kW (4) Revolving with loading Main hook load: 3000t speed with load : 0.2r/min Speed with empty load: 0.33r/min Max stability power:8x400=3200kw 带载旋转工作时 主钩最大起重量:3000t 负载速度为 0.2r/min 空载速度为 0.33r/min 7.1.2 Designing Specification设计规范 All mechanism of the crane, such as: Main Hoist, Minor Hoist, and small Hook luffing system,hoist system, ranging system, rotation system and other metal structure, like: Crane Limb, “A” frame, rotation platform, etc. are designed or calculated according GL and relevant specification in FEM, etc. 起重机各机构如主、付、小钩起升、变幅、旋转及各金属构件,如 起重臂、人字架、转台……等的设计计算应满足 GL 的有关起重机设计规范和规则、FEM(欧 洲起重机设计规范)等。 7.1.3 Working Condition of the Crane 起重机使用条件 Atmosphere temperature: Max humidity is lower: Wind speed :( working condition)
73/91

-20° ~+45° 95% less than 17.1m/s

REVOLVABLE CRANE 3600T (Shelter condition) Normal: Work instance: lifting load 3000t

TECHNICAL SPECIFICATION 50m/s pitching 0° rolling 1° , pitching 3.5° rolling 3.5° , pitching 1.5° rolling 1.5° , Pitching +/- 10° rolling +/-20° , -20° ~+45° 95% 17.1m/s 50m/s 纵倾 0° 横倾 1° 纵倾 3.5° 横倾 3.5° 纵摇±10° 横摇±20°

Lifting load less than 4400t Condition of trail run: 大气温度: 最大湿度不超过: 风速: (工作时小于) (避风时) 固定状态: 工作状态:吊 3600t: 拖航条件:

(Remark: crane arm is located in level and used fix device when trailing run)

吊 1500t 以下 : 纵倾 1.5° 横倾 1.5° (注:拖航时,起重臂放落在水平位置,并使用固定装置) 7.1.4 Primary Parameter and Working Condition for the Crane 初定起重机的主要技术参数及性能要求(What is T4,L2,M4?)什么是 T4,L2,M4? Mechanism 机 构 Main 主起升 Minor Hoisting 副起升 Luffing 变幅 Small Hook 小 钩 Hoisting Class 用等级 T4 T4 T4 T4 of State 情况 L2 L2 L2 L3 of Group 工作级别 M4 M4 M4 M5 Utilization 利 Loading 载荷 classification

7.2 Safety Protection 起重机必须设置以下安全保护装置: The crane should be equipped with following safety devices: 1、 the control devices of height-limitation for all the hooks The result should be feedback on the control panel. 2、 the alarm and protection devices for overload warning at all hooks. 3、 Limited switches for speed control for hook at the end of travel distance. At 5% of travel distance of hook (upper and lower position), there should be automatic speed limit function in avoid of collision. 4、 The limited switches for Ranging of the crane limb. One set of Sensor is required.
74/91

REVOLVABLE CRANE 3600T

TECHNICAL SPECIFICATION

The data should be reflected to the monitor by load cell fitting various working condition, so as to function as alarm of torch warning. 5、There should be indicator of Mechanical angle and limited switches below the Limb support, and there should be graph of the relationship between angle and lift weight. 6、Speed limited switches for Ranging termination. 7、Synchronization Device for Ranging system. 8、Monitoring system for crane The monitor for crane should be equipped with camera, in order to control the display of operator’s cab, so as to supervise the whole procedure of working. 9、There should be monitor in the proper position in Winch cabin, in order to supervise the working situation of Winch. 1 各吊钩起升高度极限位置控制装置。操纵台上能显示控制效果。 2 各吊钩起重量显示装置和超负荷报警、保护装置。 3 吊钩近极限位置时的限速装置, 当吊钩距上下极限 5%时, 有自动限速功能, 防止冲顶。 4 变幅幅度数字指示装置和变幅行程终点限位装置。变幅机构在臂架上装角度传感器 1 套。传感器输出臂架角度值,输送到负荷限制器,用于控制不同跨距的不同负荷(形成负荷力 矩曲线) 。达到力矩保护和报警的功能。 5 臂架下绞点处装有机械式角度指示牌及角度限位器,有角度和起重量关系曲线图 6 变幅行程终点前的减速装置。 7 变幅机构工作同步装置 8 起重机摄像装置。起重机臂架适当位置装有摄像探头,在操纵室内设显示屏幕,以随时 观察主钩吊重后的运行过程。 9 绞车房适当位置装有摄像探头,以随时观察吊重时绞车运行情况。 7.3 Electric system 电气系统 7.3.1 Standard of Electrical Devices 电气装置的标准 The motors and controlling equipment will be made according to IEC standard and approved by Classification. Controlling equipment and element will adopt import or assembling products, which have high quality and reliability.电机和控制设备按照 IEC 标准以及船级社认 可。控制设备和零件采用进口或组装件,保证高质量和可靠性。 7.3.2 Electric Motor 电机 All driven motors will be approved by GL. 所有电机有 GL 认可 7.3.3. Method of Control 控制方式 Crane system is controlled and locked together by PLC. Electromotor is started and controlled by transducer. 起重机控制系统由 PLC 控制并连锁。 电动机的由变频器启动和控制。 1.Crane electronic control is transducer. Transducer, PLC, light-electronic coder and command coder(main switch) in the system are international famous nameplate and drivers
75/91

REVOLVABLE CRANE 3600T

TECHNICAL SPECIFICATION

cabinet is assembled internal. Crane’s main electromotors are transduce electromotor. 起重 机的电子控制设备是变频器。系统里的变频器,PLC,电子编码器和命令编码器(主开关) ,都 是国际知名品牌,并且驱动柜内部集成。起重机主电动马达是变频式的。 2. Main hoister and subsidiary hoister should be with constant power control function without load and timing with different load. Two hooks should be equipped with height limit equipment separately and with speed-limit function when near to the terminal. 在任何载重情况下,主起 升和辅助起升都应该具备持续力的控制功能(在各级负载量下装载调速) 台吊钩分别设置高 。2 度限制设备以及在接近末端时具备速度限制功能。 3. System from 0 to rated speed is to be infinite variable speed. But master hand grip from null position to max. control angle is to be 5 levels. 从 0 速度到额定速度实现无级变速。但主 手柄从 0 位置到最大控制角度分为 5 挡。 4. Hoisting structure should be set a load inspect and protect device. 起升机构要配备重量感 应和保护装置。 5. Indicate the hoisting capacity of each crane and the sum of the two cranes 指示每台起重机 的起升能力以及两台机的总和。 6. A video monitor will be equipped to monitor the whole process of hoisting and the condition of hoisting winch during the crane working. 一台视频监视器用来监视起升的整个流程, 以及起 升工况。 7. The instant luffing range of crane will be indicated during the crane working.If over rating range being detected, the protection system will stop the crane to hoisting overloading weight. 起重机即时的转向幅度要在起重机工作时反映出来。如果测到过载,保护系统要停止起重机的 起升动作 7.3.4 Sefety inter-lock and protection 安全互锁和保护 1. All main circuits and auxiliary circuits set over-flow protection, low-voltage protection, short-circuit protection and short-phase protection.所有主要回路和辅助回路设置超流保护,低 压保护设置,短路保护以及短相保护。 2. All structures will supply runninga and stop indicator light.所有设备提供运行和停止指示灯 3. Operation alarm equipment: Considering of the seafty, the driver should press operational button, hoot alarm before operating main lifting, luffing and boom structure. 运行警报设备:考虑到安全,司机要按下操作按扭,在运行主起升、转向、动大梁前,鸣响警 报 4. Over-load( torque) protection device.超载(扭矩)保护装置 5. Position limit protection and interlock of main lifting structure. 限位保护以及主起升机构的连锁 6. Position limit protection and interlock of luffing structure.定位限制保护和起重臂变幅的连锁 7.3.5 Lighting system 照明系统 1. Working lighting: Assure the gound illumination of working area is more than 100 lux.工作 照明:确保工作区域的照明超过 100LUX 2. Two red navigation lights (30W) are set on the top of crane.起重机顶部设置 2 个红色航行灯
76/91

REVOLVABLE CRANE 3600T (30W)

TECHNICAL SPECIFICATION

7.3.6 Communication system 通讯系统 One loud-speaker, one HF telephone, two wireless interphone will set in the operating room; the telephone system will arragened in the operating room, electrical room and machinery room. 操作室设置 1 台扩音器,1 台 HF 电话,2 台短线室内电话。操作室,电气室和机械室设置电 话系统。

8. PIPE HANDLING AND LAYING EQUIPMENT 敷管设备部分 8.1 General 概述 A firing line shall be longitudinal arranged on upper deck, ending up in a fixed stinger at the stern. The firing line will be suitable for laying single or double joints. A production line for preparing double joints operations shall be provided on upper deck on PS of firing line. Pipe storage facility shall be arranged on upper deck, with a minimum capacity of 300 pieces of pipes with 12m long and 30"-32"diameter, equipped with one crawler crane for transport of single joints to pipe conveyors. 上甲板上延纵向布置一条敷管线, 延伸至艉部的固定式托管架。 敷管线适合单管和双管的敷设。 在上甲板的敷管线左舷一侧布置双接管的设备。 上甲板设管子堆场,最小能堆放 300 根 12m 长的 30"-32"的管子,配备有履带式起重机用于 单接管的吊装至敷管线的输送设备。 8.2 Crawler crane 履带式起重机 One (1) crawler crane shall be arranged on PS of upper deck with the following main design data: ? Maximum lifting capacity : ? Maximum lifting height : capacity) 上甲板左舷布置一台履带式起重机,其主要设计参数: ? 最大起升能力: ? 最大起升高度: 8.3 PIPE LAYING EQUIPMENT 铺管设备 8.3.1 Specific design data 主要设计参数 ? Pipe Diameter Range (overall outside diameter) : ? Pipe Diameter Range (steel outside diameter) : 6 to 60 [inch] 6 to 48 [inch] 250t 80t(非最大吊重时) 250t 80m(not at maximum lifting

? Additional oversize due to anodes, buckle arrestors etc. : 1 [inch]
77/91

REVOLVABLE CRANE 3600T

TECHNICAL SPECIFICATION 12.2 [m] 24.4 [m] ± 0.1 [m] ± 0.5 [m] ** 40 [ton] 80 [ton]

? Pipe joint length, single joint (nominal) : ? Pipe joint length, double joint (nominal) : ? Individual pipe joint length tolerance, single joint : ? Pipe joint length tolerance, double joint * : ? Maximum single joint weight : ? Maximum double joint weight :
* double joints shall be pre-fabricated on board ** over five (5) joints in the firing line

Pipe coatings: Concrete; coal tar enamel; polyethylene; epoxy or other typical pipeline anti-corrosion coatings. ? 管径范围(外径总和) : ? 管径范围(钢管外径) : ? 因牺牲阳极等附加外径: ? 单节管管节长度(名义) : ? 双节管管节长度(名义) : ? 单节管长度公差: ? 双节管长度公差*: ? 单节管最大重量: ? 双节管最大重量: * 双接管在船上预处理 **敷管线上 5 个管子接头长度 管子包覆:水泥;煤焦油;聚乙烯;环氧或其他防腐蚀型管子包覆。 8.3.2 Main firing line 敷管线 The main line welding system typically consists of ? Two (2) pipe facing systems ? Two (2) pipe pre-heating systems ? One (1) line-up station ? Three (3) external welding stations ? One (1) welding repair station ? Welding control and logging system ? One (1) shielding gas distribution system ? Welding converters ? One (1) NDT and repair station ? Two (2) Mastic infill stations (12.2m apart) Welding process : Automatic welding, Gas Shielded Arc Welding or Flux Core Arc Welding. The firing line shall be provided with adequate walkways along the entire length, consisting of grating on suitable supports, and all required provisions to create a safe and proper working area, such as:
78/91

6 to 60 [inch] 6 to 60 [inch] 1 [inch] 12.2 [m] 24.4 [m] ± 0.1 [m] ± 0.5 [m] ** 40 [ton] 80 [ton]

REVOLVABLE CRANE 3600T ? Lighting ? Emergency escape routes ? Video cameras ? Public address ? Power outlets ? Rack for welding machines ? Ventilation ? Drinking water ? Overhead trollies

TECHNICAL SPECIFICATION

All welding stations shall be designed to minimize exposure of adjacent personnel to weld flash. Any paint finish in or around welding stations shall be matt, not gloss. Adequate ventilation shall be provided to remove fumes and unused gas from weld process. 敷管线上焊接系统设备包括: ? 2 套管子表面处理系统 ? 2 套管子预热系统 ? 1 套对中站 ? 3 套外部焊接站 ? 1 套焊接修理站 ? 焊接控制和记录系统 ? 1 套焊接保护气体分配系统 ? 焊接变流器 ? 1 套 NDT 和修理站 ? 2 套包覆站(安装间距 12.2m) 焊接方式:自动焊,保护气体氩弧焊或熔化极电弧焊。延敷管线全长设置有足够空间的通道, 包括适当的格栅等以提供一个安全合适的工作区域,配置设备如下: ? 照明 ? 紧急逃生通道 ? 视频监控 ? 广播 ? 电源插座 ? 焊接设备搁架 ? 通风设备 ? 饮用水 ? 机舱行车 所有焊接站的设计将焊接的闪光与人之间的距离减至最小。 靠近焊接站附近的设备油漆喷涂为暗淡色,非光洁色。 提供良好通风以消除焊接产生的烟雾和废气。

79/91

REVOLVABLE CRANE 3600T 8.3.3 Double jointing 双接管

TECHNICAL SPECIFICATION

One (1) double jointing prefabrication plant shall be provided. Double joint pipe welding system typically consists of: ? Two (2) pipe facing system consisting of one machine with support ? Pipe pre-heating equipment ? One (1) line up system ? Two (2) external welding systems ? One (1) combined external / internal welding system ? One (1) welding repair system ? Conveyors ? Welding convertors ? One (1) NDT and repair station Additionally two (2) sets of pipe cutting equipment shall be provided. Welding process : Automatic welding Production rate is 6 double joints/hour (48 [inch] steel outer diameter, 1 [inch] wall thickness pipes). All welding stations shall be designed to minimize exposure of adjacent personnel to weld flash. Any paint finish in or around welding stations shall be matt, not gloss. Adequate ventilation shall be provided to remove fumes and unused gas from weld process. 配备有一套双接管设备,双接管焊接系统组成: ? 2 套管子表面处理系统,其中之一带固定支座 ? 管子预热系统 ? 1 套对中站 ? 2 套外部焊接站 ? 1 套内/外部组合式焊接站 ? 1 套焊接修理站 ? 管子输送机 ? 焊接变流器 ? 1 套 NDT 和修理站 另外提供 2 套管子切割设备。 焊接方式:自动焊 接管速度为每小时完成 6 套双接管(钢管外径 48 [inch], 1 [inch] 壁厚) 。 所有焊接站的设计将焊接的闪光与人之间的距离减至最小。 靠近焊接站附近的设备油漆喷涂为暗淡色,非光洁色。 提供良好通风以消除焊接产生的烟雾和废气。 8.3.4 Support Rollers 支承滚轮 Vertically adjustable rollers shall be installed to support of the pipeline on the main firing line.
80/91

REVOLVABLE CRANE 3600T

TECHNICAL SPECIFICATION

The support roller units shall be mounted either directly on the Ship's deck, or on an adjustable frame provided by Builder. 敷管线上安装有高度调节式滚轮用于管线支承。支承滚轮安装于船体甲板上,或安装于设备供 应商提供的可调整式框架结构上。 8.3.5 Tensioners 张紧器 A combined 3 x 80 t tension system shall be installed in the main firing line. Number of tensioners : Maximum tension capacity (each) : Overall pipe outside diameter range : Drive type : 敷管线上配备 1 套组合式 3 x 80 t 张紧器。 张紧器数量: 最大张力(每套) : 管径范围(外径总和) : 驱动型式: 3 80 t 6" to 60" 电动 3 80 t 6" to 60" Electric

The tensioning system shall be controlled from the Pipelay and DP CR.

张紧系统可以在铺管监控设备和 DP 监控设备上进行控制。 8.3.6 Abandonment and recovery winch A/R 绞车 A 200 t A&R winch shall be installed on upper deck forward, complete with: ? level winder ? measuring sheave ? turning sheave(s) ? Storage reel Rated tension capacity : Max. tension capacity : Pay-out speed at rated tension : Drive type : 200 t 220 t ~20 m/min Electric

The A&R winch shall be controlled from the Pipelay and DP CR. One (1) heavy duty steel sheave including bearings, shaft and housing, suitable for the A&R wire rope and A&R tension shall be provided. The sheave shall be executed as a measuring sheave, with a contact angle of approx. 90 degrees. The measured parameters for the measuring sheave shall include: ? Line tension ? Line speed ? Line displacement The sheave shall be retractable, to clear the firing line position whenever the A&R system is not in use.
81/91

REVOLVABLE CRANE 3600T

TECHNICAL SPECIFICATION

上甲板上安装一台 200t A/R 绞车,其包含: ? 绞车 ? 测量滑轮系统 ? 转向滑轮 ? 钢索储存卷筒 额定张力: 最大张力: 额定张力时的放绳速度: 驱动型式: 200 t 220 t ~20 m/min 电动

A&R 绞车可以在铺管监控设备和 DP 监控设备上进行控制。 配备 1 套重型滑轮,包括滑轮轴承、滑轮轴和支架,滑轮的设计满足 A&R 绞车张力和钢丝绳 的直径需要。其可用作测量滑轮,导向角度约 90 度。 测量滑轮的测量参数包括: ? 管线张力 ? 管线速度 ? 管线放出长度 A&R 绞车未使用时测量滑轮可以缩回。 8.3.7 Conveyors 管子输送机 Suitable electrically driven longitudinal and transverse conveyors, with a capacity of 40 t for single joint or 80 t for double joint, shall be installed on upper deck where required. The conveyors shall be fitted with an emergency stop control cord along their length. 电力驱动的纵向和横向管子输送机满足 40t 单管或 80t 的双接管的输送,安装于上甲板上所需 位置。 输送机具有紧急停止控制功能。 8.3.8 Pipe storage stanchions 管子堆放 Pipe shall be stacked in the nested configuration and restrained by portable stanchions, installed along the outboard edges of the storage areas. 在管子储存堆放区域,安装有可拆装式支柱用于管子的堆放。 8.4 STINGER 托管架 A stinger shall be installed to support the pipe in the overbend as it departs from the stern. The stinger shall be of the fixed type and shall be hinge connected to the stern at two hinge points. The hinge points shall be suitably integrated with the stern structure completely flush with the stern. The stinger shall be supplied complete with a stinger adjuster system. The stinger shall be equipped with quick release mechanism system. 船尾设一套托管架用于管线从艉部下放时的支承,以防止管线的过度弯曲。 托管架为固定式,通过两个铰链于船尾连接。铰链的位置利于与船尾结构的结合。
82/91

REVOLVABLE CRANE 3600T 提供一套托管架调节系统。 托管架可实现快速的下放功能。 8.4.1 Roller boxes 滚子支架

TECHNICAL SPECIFICATION

Support roller boxes shall be provided on the stinger. These sets shall be suitable for accommodating small pipe diameters in combination with high tensions as well as the bigger diameters of pipe. 托管架上配备支承滚轮。滚轮的配置能适应大张力小管径的铺设,同时也适用于大管径的管子 敷设。 8.4.2 Stinger control shack 托管架控制室 A stinger control shack shall be installed at the stern, in such a position that a good view on the stinger is ensured. A pneumo-fathometer from the last roller on the stinger shall be led to the stinger shack and a gauge shall be provided. An echo sounder to measure the depth of water under the stern of the Ship shall also be provided, with the readout in the stinger shack. A panel with a graphical representation of the stinger shall be included with three sections capability set to the correct relative angles and depths, including the read-out and visualization of the water depth Load indicators for the last rollers on the stinger shall be located in the stinger control shack and a television monitor showing the last rollers shall also be located here and in the Pipelay Control room. 船尾设置托管架控制室,控制室的布置有利于对托管架的控制视野。 托管架上最后一个滚轮旁设置一套测深仪,并可远传至托管架控制室。船尾也将安装有声纳装 置,以测量船尾的吃水,测量数据可远传于托管架控制室。 在托管架控制室设置有一套三维监视控制托管架位置的面板,可以显示最后一个滚轮的吃水、 负载的数值。在托管架控制室和敷管控制室均设用于托管架最后一只滚轮工作状况的监视器。 8.4.3 Control of Pipelaying 铺管控制方式 The main operating center for controlling the pipelaying shall be situated in the Pipelay Control room on the Navigation Bridge deck. The Control table will consist of a mimic-panel having red and green lights operated by each working station indicating their status and TV monitors from all tensioners, A&R winch, line-up station and last roller on the stinger, shall be installed in the Pipelay Control room, in one group. The Control table shall also have indicators for trim, list, draught and wind speed and direction. Working stations on the firing line shall be equipped with audio-visual warning systems operated from the Control table. The control system shall be linked to an electrical warning system (lights and bells) during pipe movements. The controls for the tensioners and A&R winch shall be situated in the Pipelay Control room,
83/91

REVOLVABLE CRANE 3600T as well as the DP controls. 在桥楼甲板上设有敷管线的控制室。

TECHNICAL SPECIFICATION

控制台上设有模拟板,通过电视监视器和模拟板上的红色和绿色指示灯显示所有张紧器、A&R 绞车、对中装置和艉部滚轮的工作状态。 控制台可以显示船舶纵倾、横倾、吃水、风速和风向。 敷管线上的工作站通过控制台进行控制,配备有声光警告系统。当敷管线上管节移动时,控制 系统自动进行声光警告。 8.4.4 Access 使用 Suitable and safe means of access shall be provided to the stinger and adjuster system, as required for operation, service and repair. 提供托管架及其调节系统的适用的安全使用方法,如操作、服务和维修的说明。 8.5 NDT EQUIPMENT 无损探伤设备 Three (3) sets of NDT measuring equipment shall be provided for both firing line and pipe preparation plants. The NDT equipment shall be complete with transducers, displays, printers and data storage. Non Destructive Testing shall be performed with the Ultrasonic Method. NDT equipment shall include probes, data acquisition, data handling, data storage, displays, printer, and computers. The NDT equipment shall be suitable to find the following defects: ? cracks (all types) ? lamination ? de-lamination ? porosity ? incomplete fusion ? incomplete joint penetration ? inclusions ? seam and laps In the main welding line a complete working set and a complete spare set shall be available. Data storage shall be suitable for 3 months of pipe laying, including a separate backup of all test data. Data extraction of all test data shall be available, through a connection to a client room on the vessel. Suitable office space shall be reserved in vicinity of the test area. 在敷管线上和管子预处理线上配备有三套 NDT 设备。NDT 设备包含传感器、显示器、打印机 和数据的存储功能。 使用超声波进行无损探伤。 NDT 设备包括探射器、数据读取、数据处理、数据存储、显示仪、打印机和计算机。
84/91

REVOLVABLE CRANE 3600T

TECHNICAL SPECIFICATION

NDT 设备适用于下列设备失效的检测: ? 裂纹(各种型式) ? 层压结构 ? 剥离式迭片结构 ? 气孔 ? 未完全熔化 ? 未焊透 ? 夹杂物 ? 裂痕和重皮 在敷管线上配备有一整套的 NDT 工作设备和一整套 NDT 备用设备。敷管线的检测数据能存储 3 个月,并对所有检测数据做单独的备份。 8.6 MASTIC INFILL EQUIPMENT 包覆设备 Field Joint Mastic Equipment divided in two (2) work station in the main firing line shall be provided, comprising: ? Two (2) crushers (minimum) ? Two (2) mastic loading conveyor systems ? Six (6) mastic melt/mix kettles with heating system ? Six (6) mastic buckets with hoists ? Two (2) Overhead hoisting monorails ? Controls 敷管线上设有两套包覆站,包覆系统设备包括: ? 2 套敷料切割器 ? 2 套敷料输送系统 ? 6 套带加热装置的熔化搅拌罐 ? 6 套可起吊的敷料桶 ? 2 套单轨式悬挂起吊系统 ? 控制设备 8.6.1 Mastic crusher 敷料切割器 The maximum size of mastic block to be handled will be 300 mm (W) by 300 mm (L) by 300 mm (H). Two mastic crushers shall be provided to handle 300 mm cube blocks. Each crusher is required to drop crushed dope onto the conveyor outside the tub to be transported to the kettles inside the tub. Crushed dope shall be 50 mm x 50 mm x 50 mm maximum. The crushers shall be laid out to meet the loading demand of the melt kettles. 所需处理的最大敷料块尺寸为 300 mm(长)×300 mm(宽)×300 mm(高) 。两个敷料切割 器用于向 300 mm 管接头间的包覆料的供给。每个敷料切割器将敷料切割成最大 50 mm(长) ×50 mm(宽)×50 mm(高)的块状物,再通过输送机输送至熔化搅拌罐中。

85/91

REVOLVABLE CRANE 3600T

TECHNICAL SPECIFICATION

8.6.2 Mastic feeding conveyor system 敷料输送系统 A mastic feeding conveyor system shall be designed and provided to transport the crushed mastic from the crushers to the melt kettles. The conveyor system shall be laid out to meet the loading demand of the melt kettles. The handling, cutting and crushing of the packaged mastic supply shall be performed on the SB stern of the vessel outside the tub. 1 套敷料输送系统用于将切割好的敷料块输送至熔化搅拌罐。输送系统的布置满足熔化搅拌罐 的需要。 敷料的处理、切割和压碎过程在船体右舷实现。 8.6.3 Melt / mix kettles 熔化搅拌罐 The melt system shall provide a total melting rate to suit the production of pipe laying of 48 inch pipe with 6 inch coating and 300[mm] cutback. Each of the melt kettles shall be equipped with an electrical power driven agitator to keep the aggregate in suspension, plus a time/temperature recorder with a minimum of 12 hr capacity recording chart. All kettles shall be constructed with a stainless steel or other corrosion resistant alloy, replaceable, inner shell suitably hardened to resist abrasion and have carbon steel outer jacket. All kettles shall be fully insulated. Doors to have air powered rams for opening and closing. The Vendor shall supply exhaust collection hoods and exhaust fans, over the kettles to suck fumes and smoke and burner exhaust to the atmosphere. Fresh air vent fans to be provided to blow clean air into the tub. The kettles shall be diesel oil fired either directly heated or via a separate generator, and equipped with alarms and safety devices to meet classification society standards for fired, non-pressure vessels. A powered loading door/hatch shall be located on top of each kettle and shall be both locally and remotely operated. The opening size of the door/hatch will be designed to ensure efficient loading operations. A control panel shall be provided for the operation of kettles and conveyor loading system. The control panel shall, amongst others, show the temperature of the mastic. A local plus remote operated no-leak air powered sluice gate shall be provided to transfer mastic to the buckets. The maximum attainable temperature of the mastic shall be up to 275°C. A day tank of adequate size will be supplied. This tank shall be filled from the diesel fuel oil system already on board. 敷料熔化搅拌罐的熔化速度将适合 48 英寸管子、 英寸的包覆层和 300mm 的管节头间距的包 6 覆需要。 每只熔化搅拌罐配备有电动搅拌器使包覆料处于溶解悬浮颗粒状态, 能记录 12 小时以内的 “时
86/91

REVOLVABLE CRANE 3600T 间 / 温度”曲线。

TECHNICAL SPECIFICATION

所有的敷料罐将由不锈钢或其他耐腐蚀合金制成,罐内壳为可替换的型式,具有较高硬度以减 少磨损,同时,外壳为碳钢材料。所有敷料罐做绝缘处理。罐口通过气动实现开关。 设备供应商应提供敷料罐的废气收集罩壳并排出至空气中。同时新风补充至敷料罐中。 敷料罐的加热热源来自柴油的燃烧直接加热或通过单独的发电机组供电加热,配备有报警和安 全装置以满足船级社对燃烧用的非压力容器的要求。 每个敷料罐顶部设有动力驱动的装卸口,装卸口的开闭可通过现场或遥控操作。装卸口的开口 尺寸满足装卸敷料的要求。 提供一套用于敷料罐和输送机的控制面板。控制面板带敷料罐的温度显示。 提供一套可现场和遥控蝶阀用于将熔化后的敷料输送至敷料桶中。 敷料罐的最大容许温度为 275°C。 提供一个足够容积的日用油箱。油箱的燃油可从船上的燃油系统供给。 8.6.4 Buckets 敷料桶 There will be six (6) heated buckets. Each bucket shall have each a capacity of not less then 0.33 m3 and a top opening for loading with hot mastic. The buckets shall be equipped with a fully insulated self-contained electrically heated, thermostatically controlled oil jacket system (having immersion heaters in the jacketed space) for heating of mastic material while being transported. A manually operated no leak sluice gate shall be used to transfer mastic from bucket to field joint mould. Side restraint system shall be provided to dampen the sideway movement of the bucket during rough weather throughout the entire traveling distance. Control of motion of buckets shall be provided on push button panels which can be operated by the coating operator during the travel of the gantries. The panels shall include emergency stop buttons. 配备有 6 只已加热的敷料桶。每只敷料桶的容积不少于 0.33 m3 ,顶部开口以装载加热后的敷 料。 敷料桶设有完全绝热的自动电加热系统, 恒温调节的外壳控制系统 (加热器置于壳体的空间内) 以满足敷料桶输送过程中的加热保温。1 只手动蝶阀用于实现敷料桶至管接头之间的输送。 8.6.5 Overhead hoisting system 单轨式悬挂起吊系统 The hot mastic shall be transported from the melt kettles to the coating areas by two overhead hoist systems with powered hoists. Two continuous loop monorail systems, each serving one infill station and three kettles shall be provided. Each continuous loop monorail system shall carry three buckets. The length of each continuous loop monorail system shall have a loop length of approximately 30 [m]. Sufficient headroom along the firing line shall be provided to ensure safe working operations and access to the largest diameter pipeline. 2 套单轨式悬挂起吊系统提供加热后的敷料从敷料熔化罐至包覆工作区域的起吊。
87/91

REVOLVABLE CRANE 3600T

TECHNICAL SPECIFICATION

配备 2 套连续的环状单轨系统,每个单轨用于一个包覆站和 3 个敷料熔化罐的使用。每个单轨 系统能输送 3 个敷料桶。每个单轨的长度约 30m。 预留延敷管线方向上的足够的静空高度,以保证在大直径的管道敷设时的安全操作空间。 8.7 Pipe Repair Davits 修管吊 Five (5) pipe repair davits 50T)will be arranged on the starboard of main deck. Davits will be ( used for hoisting and repairing of lain pipes on the seabed. 在上甲板右舷设有五台 50t 扒杆式修管吊,用于已敷设好的管子的吊放及修理。

9 dynamic Positioning 动力定位 9.1 composition and classification 组成及分类 It’s a highly comprehensive system, which consists of dynamic system, measuring system, propel controlling system and controller. Dynamic and propeller system has been covered in the Engine section and Electricity section. 动力定位是一个高度综合的系统,包括动力系统、测量系统、推力器系统、遥控推力控制系统 和控制器。动力系统及推力器系统已在轮机部分及电气部分中有叙述。 According to Norway’s GL standard, DP2 is bracketed into AUTR. 按照挪威 GL 规范,对应 DP2 的动力定位分类为 AUTR 类。 AUTR requires: 3 sets of position reference system in measuring system; 2 sets of vertical-section reference system; 2 sets of gyro compass; 2 sets of anemoscope and dogvane; 2 sets of controller (computer quantity); propel remote-controlling system requires manual controller with automatic positioning, individual joystick for each propeller. 按 AUTR 要求,测量系统中位置参考系统需 3 套,垂直面参考系统需 2 套,陀螺罗经需 2 套,风速风向仪需 2 套,控制器(计算机数量)需 2 套,遥控推力控制系统需有手动控制带自动 定向的人工操纵和各个推力器的单独手柄。

9.2 Operation mode 运行模式 Operation modes as follows 动力定位具有下列运行模式: Automatic mode – automatic positioning and course controlling 自动模式 ---- 自动定位和航向控制 Manual mode – controlling each propeller’s speed, direction, start and stop individually 手动模式 ---- 个别控制每个推力器的速度、方位、起动/停止 Auto-tracking mode – programmable operation of reference point, including automatic steering and ROV tracking 自动跟踪模式 ---- 具有参考点可编程的运动,包括自动舵和 ROV 跟踪。 Propel remote-controlling mode – manually positioning by all-direction joystick and selectable automatic course controlling
88/91

REVOLVABLE CRANE 3600T

TECHNICAL SPECIFICATION

遥控推力控制模式 ---- 用万向操纵杆手动定位控制和可选自动航向控制。 Thruster Assisted Mooring system mode – mooring system together with thrusters controlling. 锚辅助控制模式-锚泊系统与推进器共同控制定位。 9.3 Configuration of measuring system 测量系统配置 9.3.1 position reference system 位置参考系统 (1) 2 sets of acoustic positioning system 声学定位系统 2 套 To install a multi-beam hydrophone, in order to receive signals from sea bed and ROV. This system can calculate each signal’s position comparative to the vessel, and transmit the information to dynamic positioning system, so that the vessel can keep fixed distance from the signal’s giver (beacon). 在船底安装一个多波束水听器,以接收从海底、ROV 的声学信标发送来的信号。 该系统能计算每个信标相对船的位置并将数据传送给动力定位系统,使船能保持与固 定或移动信标之间相对位置。系统采用超短基线系统工作,适用于 2km 范围内运行。 Each set includes display processing unit, high-efficiency all-direction beacon, acoustic micro-beacon, hydrophone and exclusive-use cable. 每套包括显示处理单元、高功率全向信标、微型声学信标、水听器及专用电缆等。 (2) 1 set of DGPS receiver DGPS 接收机 1 套 Including GPS receiver, antenna, exclusive-use cable and modem, etc. 每套包括 GPS 接收机、天线及专用电缆、解调器等。 9.3.2 9.3.2 tight rope system ( 2 sets ) 紧绳系统 2 套 a boom and a hydraulic winch to be set beside the shipboard, which be pulled on the heavy iron by the constant tension wire rope and the universal joint. Wire rope can automatic check the ship’s relative depth and the inclination amount of the sea floor by means of transmission an electronic formula rope counter. It can count the motion state of pitching, rolling and heaving. This system usually used in depth range of 300m. each system consists of boom, heavy iron, winch and control panel and so on. 在船舷旁安装一个吊杆和液压绞车,通过恒张力钢索及万向接头牵引在海底的重块上,钢 索传动一个电子式绳索计数器自动检测水面运动船舶相对海底的水深及倾斜度,可以计算出船 舶的纵摇、横摇、垂荡等运动状态。系统通常应用于 300m 水深范围内。 每套包括吊杆、重块、绞车、控制板等。 9.3.3 gyrocompass ( 2 sets ) 陀螺罗经 2 套 9.3.4 aerovane (2 sets ) 风向风速仪 2 套 9.3.5 Vertical reference unit(VRU) (2sets)垂直参考系统 2 套。

89/91

REVOLVABLE CRANE 3600T

TECHNICAL SPECIFICATION

9.4 outfit of dynamic positing system 动力定位控制系统配置 9.4.1 integrated dynamic positing system ( 2 sets)集成的动力定位控制系统 2 套 consists of control-table, computer etc.包括操纵台、计算机装置等。 9.4.2 integrated ship control system ( 2 sets )集成的船舶控制系统 2 套 consists of control-table, computer etc.包括操纵台,计算机装置等。 9.4.3 peripheral equipments 外围设备 consists of UPS, portable universal controller, printer etc. 包括 UPS、可携式万向操纵器、打印机等。 9.4.4 9.4.4 software capability 软件功能 (1) closed-loop PID control, Kalman filtering (2) thruster (3) allot logic of thruster (4) power management and limited (5) effect analysis (6) effective wind compensation (7) event / alarm record print (8) environment sensor (9) posirion-reference sensor (10) quality control of the self-restraint sensorrao (11) auto-weighted of sensor data (12) fault auto-checking of sensor data (13) auto stopping calculation because of the short-time depreciation of position sensor (14) jan-to-signal ratio (1) 闭环 PID 控制,卡尔曼滤波 (2) 推力器选择和使能 (3) 推力器分配逻辑 (4) 功率管理、功率限制 (5) 效果分析 (6) 有效风力补偿 (7) 事件/报警记录打印 (8) 环境传感器选择和使能 (9) 位置参考传感器选择和使能 (10) (11) (12) (13) (14) 具有自动抑制的传感器数据输入的质量控制 传感器数据自动加权 传感器数据故障自动检测 位置传感器短时跌落时自动停滞计算 扰动设置和杂信比设置
90/91

REVOLVABLE CRANE 3600T

TECHNICAL SPECIFICATION

91/91


相关文章:
技术规格书(中英文)
技术规格书(中英文)_机械/仪表_工程科技_专业资料。海洋石油资料NPC-National Petro Co. 3600t Revolving/Engineering Crane Technical Specification (Project Plan) ...
Technical Spec Barge 内陆油驳技术规格书-中英版
Technical Spec Barge 内陆油驳技术规格书-中英版_英语学习_外语学习_教育专区 暂无评价|0人阅读|0次下载|举报文档 Technical Spec Barge 内陆油驳技术规格书-中英...
技术规格书(中文)
技术规格书(中文)_信息与通信_工程科技_专业资料。南水北调中线一期穿黄工程泥水加压平衡盾构设备采购合同 技术规格书 A- 954No. A-1954-00 南水北调中线一期...
英文技术规格书
5财富值 笑死我的英文书 4页 免费如要投诉违规内容,请到百度文库投诉中心;如要提出功能问题或意见建议,请点击此处进行反馈。 英文技术规格书 隐藏>> Description:...
进口阀门技术规格书中英文对照
进口阀门技术规格书中英文对照_机械/仪表_工程科技_专业资料。进口阀门技术规格书中英文对照 进口阀门技术规格书 Off-shore Valve Specification 1.总则 1. General ...
电气规格书(中英文对照)
电气规格书(中英文对照)_电力/水利_工程科技_专业资料 暂无评价|0人阅读|0次下载|举报文档电气规格书(中英文对照)_电力/水利_工程科技_专业资料。电气中英文对照...
英文技术规格书封面
英文技术规格书封面 隐藏>> DESAY LITHIUM-ION BATTERY SPECIFICATIONS ( DV60L50 ) Prepared by Check by Approved by 吴 可 DESAY POWER TECH. CO., LTD. ...
船舶中英文规格书
船舶中英文规格书_合同协议_表格/模板_实用文档。散货船船舶中英文规格书 ...个别设备不同于规格书中的 描述,则总体特性、技术参数、厂商的标准等应采用最终...
ZC-FSHB5中英文技术规格书整体式
ZC-FSHB5中英文技术规格书整体式_机械/仪表_工程科技_专业资料。ZC-FSHB5中英文技术规格书整体式ZCZC-FSHB5 反渗透海水淡化装置 ZC-FSHB5 Reverse Osmosis Fresh...
更多相关标签:
油船技术规格书中英文 | 锂电池规格书中英文 | 技术规格书 | 技术规格书 模板 | 投标物资技术规格书 | 产品技术规格书 | 技术规格说明书 | 软件技术规格书 |