BALL MILL


1

Φ 3.2×5.4mWet Overflow Ball Mill Installation And Operation Instruction

Catalog

1 2 3 4 5 6 7

Product Review Main Structural Features & Summa

ry Of Operational Principle Hoisting Transporting & Storage Installing Adjusting Manual & Handling Maintenance

总 22 页 第



2

Φ 3.2×5.4mWet Overflow Ball Mill Installation And Operation Instruction
1. Product Review 1.1 Technical Specification of the Production & Usage Scope

Specifications Mm × mm Φ3200×5400

Available Capacity m? 39

Space Factor % 40

Payload t 72

Speed Ratio % 75

Ball mill Speed n 18.0

Installed Power kW 800

Equipment Weight t 123

Remark

1.1.1 Technical Specification 1.1.2 Applicable Scope This ball mill can crush all kinds of mines by wet crushing. 1.2 Standards All performance indicators are come up to JB/T1406—2002<Ball Mill and the Rod Mill> 1.3 Applicable environment and Working Routine Report 1.3.1 Environment Indoor Installation; environment temperature 5~ 40℃ ; sea level height: ≤ 1000m( except special requirements) 1.3.2 Working Routine Continuously working

2 The Main Structural Features Operational Principle Summary. 2.1 Compositions and Features

总 22 页 第



3

Φ 3.2×5.4mWet Overflow Ball Mill Installation And Operation Instruction
2.1.1 The ball mill is mainly composed feeding assembly, charging assembly, main-bearing, shell, transmission, discharging assembly, coupling, main-motor, lubrication station, hoisting equipment, low-seed drive, electronic control, etc. 2.1.2 Main Structural Features 2.1.2.1 Shell As a main part of ball mill, shell is composed by two ends flange and cylinder, involving liners. 2.1.2.2 Main-bearing Main-bearing with static-dynamic pressure has advantage of centering, for bi-directional arc on its back. The bearing liner is made of water-cooled Babbitt metal. The bearing sealed through piston ring. While starting or stopping, lubricate bearing by high pressure and format oil film by static pressure to prevent slide way from dry friction. In this method, reduce start torque efficiency. During normal operation, use low pressure, oil and supply oil by rotation. The internal bearing is equipped with two resistance bulb. The main bearings and the main motor interlocked. Shutdown temperature can be set at 55℃, or revise it according to the actual situation. In order to compensate for change of ball mill length, owing to changes in temperature, allowing axial

总 22 页 第



4

Φ 3.2×5.4mWet Overflow Ball Mill Installation And Operation Instruction
movement on the journal in the bearing to compensate for thermal expansion and contraction deformation of the shell. 2.1.2.3 Transmission Assembly Gear and pinion are produced by the high quality steel and alloy, drived by helical gear, having advantages of working steadily, low impact, easy to adjust and long time to use. It sprays oil to lubricate in scheduled time and quantity, forming oil film on surface of gear, having good effect on the lubrication, reducing consumption of lubricating oil. 2.1.2.4 Foundation Foundation assembly shows relative position, height of anchor and local of each part. Base includes anchor bolts and the pieces under ground 2.1.2.5 low-speed drive equipment Low-speed drive equipment is used for maintenance of ball mill and replacement of liners. While close the equipment over four hours, medium and materiel may consolidate in shell. Before starting main motor, start in low-speed drive firstly to loosen load. The clutch of low-speed drive is unidirectional. When starting low-speed drive, main motor can not splice. While main motor works, the low-speed transmission can’t splice. Before starting the low-speed drive, it must firstly open high-pressure oil pump, so that rotation can float up.

总 22 页 第



5

Φ 3.2×5.4mWet Overflow Ball Mill Installation And Operation Instruction
2.1.2.6 Lubrication station A lubrication station with high and low pressure and a spray lubrication station are used to meet different demands of lubrication. Lubrication with high and low pressure: This kind of lubrication station mainly lubricates main-bear, including lubrication in high-pressure small flow and low-pressure big flow. Spray lubrication: For the size of gear lubrication, the device linked with main motor. After setted up, it sprays oil automatically. 2.1.2.7 Hoisting equipment Hoisting equipment is composed of bracket, jack and other access ones which used for hoisting roll parts. (Note: While hoisting the ball mill of the same specification, it is available to use the same hoisting equipment.) 2.1.2.8 Electronic control The use of high-voltage motors, users generally owned high-voltage controller. To provide low-voltage electric control, the PLC which called programmable logic controller centralize planning, control the working state of all parts, and the sound/light alarming, remote control (central control room, LD control. 2.2 Operation Principles

总 22 页 第



6

Φ 3.2×5.4mWet Overflow Ball Mill Installation And Operation Instruction
Synchronous motor rotates pinion by air clutch, after deceleration, driving ball mill at a fixed speed. As hoisting effect wave-shaped cylinder liner’s hoisting, media and materials will be hoisted to a certain height, then falling down. Throughout the process, due to a joint effect of liner, medium, water, materials is impacted of extruded, cutted and crushed continuously to meet requirement of size. With water out of ball mill crushing process is completed. 3 Transport hoisting & storage 3.1 Transport hoisting Transporting and hoisting product should be executed in accordance with GB191-90 which is the standard of packing and transporting. Please don’t damage while hoisting. Please don’t damage surface, package and make equipment deform permanently. 3.2 Storage 3.2.1 The product should be stored in ventilating、dry and clean room in time. 3.2.2 Prohibit inverting packing boxes, when placed or stacked. Put marked side of box on the position easy to observe, while placing. 3.2.3 Electrical instrumentation, lubricating device and spare parts are strictly prohibited inverting and stacking. Boxes which contain them must

总 22 页 第



7

Φ 3.2×5.4mWet Overflow Ball Mill Installation And Operation Instruction
be stored in a drying chamber. 3.2.4 The bared goods are stored in outdoors or indoors, according to its degree of precision and protection. The filed-mounted components or parts are all prohibited stacking or damaging. 3.2.5 When equipment requires storing outdoors, please check the water-resistant and rust-proof packing are intact. Take effective measures to prevent rain, water, rust and theft in order that the equipment is safety. 4. Installation 4.1 Installation base on drawing and technical requirements of relevant documents and standard .Installation sequence diagram for reference as follows:

Foundation :

foundation

acceptance—→equipment

out

of

storehouse—→measure component dimension— —→foundation alignment—→place block

Ball mill: main bearing block in place—→ foundation once alignment—→once grouting—→ Foundation maintenance—→once align exactly—→shell

总 22 页 第



8

Φ 3.2×5.4mWet Overflow Ball Mill Installation And Operation Instruction
transportation—→shell in place—→ Secondary align exactly—→clean bearing block—→ install transmission assembly—→ Install lubrication cooling system—→ Install feeding and discharging equipment—→ Install safety accommodation — →no load test—→→clean lacquer—→ Secondary grout

4.2 Foundation 4.2.1 Ball mill must be installed on the solid ferroconcrete foundation 。 (If installation location of ball mill is higher than ground, marking no. of concrete should increase accordingly . The bottom area and volume should be designed by relevant professional, according to the max load of foundation and Carrying Capacity of foundation soil. Don’t allow to connect foundation with factory wall, distance between them is 40-50cm at least and filled with stone to protect foundation of building during ball mill operating. Profile dimension of foundation should be larger than pedestal 100mm, if no special requirements. After completing installation,

总 22 页 第



9

Φ 3.2×5.4mWet Overflow Ball Mill Installation And Operation Instruction
should check the foundation. 4.2.2 Elevation of foundation plate is lower than bottom plate about 50-80mm, so that place block between them for adjusting (against relevant specification to confirm this distance) 4.2.3 To combine with old foundation closely, while secondary grouting, should shovel foundation face to pockmark. Shovel one by one pits on foundation face, their diameters are about 30-50mm. The distances between them are different, according to their differences sizes, generally about 150mm. Shovel gap on the corner of foundation to make the secondary grouting more solid. 4.2.4 After inspecting foundation and it meets requirements, can inbuilt pivot .As basis of aligning centerline ,pivot locates measure elevation place generally , against factory zero point to measure its elevation . 4.2.5Check special measure tools for crossing, such as special bracket, piano chord hammer, thedolite, level instrument, should meet technical requirements. According to drawing and installation specifications, cross vertical horizontal centerline and pivot (or elevation line) on the foundation of ball mill, and vertical horizontal centerline of transmission assembly. After that, it should be at center point not more than 1mm in diameter out

总 22 页 第



10

Φ 3.2×5.4mWet Overflow Ball Mill Installation And Operation Instruction
of center. To attract attention, smear around between center points with red paint, for using conveniently.

4.2.6 Pre-installed anchor bolts should clean rust and oil on them, but the thread parts are still painted oil to prevent rust. Check whether bolts and nuts connect well or not. Anchor and bushing should be installed protective cover to prevent debris from falling into anchor bolt hole. Before burying, check if bushing and anchor connect well and meet dimension requirements or not. As the same time, inspect whether anchor bolt location comes up to general and foundation drawing or not.

4.2.7 Can self-made base plate and washer and they must touch with bottom-board of soleplate. Note: Make washer by 25mmX100mm steel plates and length are not greater than soleplate width. The number of them is no less than eight pieces, uniformly distributed. Make base plate by different thickness steel plates, no more than two pieces on each base plate.

4.2.8 Secondary grouting

总 22 页 第



11

Φ 3.2×5.4mWet Overflow Ball Mill Installation And Operation Instruction
Secondary grouting after ball mill no load test normally. Before secondary grouting, should tighten anchor bolts, clean oil, paint , rust on the bearing clock and base plate, sweep dust and oil soil on the foundation with water .After that , start secondary grouting. When secondary grouting, cement mortar used in the ratio of 1:2(cement grade 525), note that fill full of bearing block underneath with cement mortar and consolidate, don’t exist gap. 4.2.9 Tighten anchor bolts Anchor bolt nut must equip washers and tighten it by locking equipment, such as spring washer or double nuts. Only when Concrete meets 75% of design intensity, allow tightening anchor bolts. Remark direction of rectangle head on the surface of bolt top and direction of foundation contains rectangle head slot on the foundation surface. After burying pieces insert bolt, fill their back cut with batched jute about 200mm to ram the gap between bushing and bolt. 4.3 Main bearing Only when foundation intensity meets above 75% and passes examination, can install main bearing on foundation. 4.3.1Before installing bearing base plate, must clean it and cross vertical and horizontal centerline on its surface as aligning baseline. After that,

总 22 页 第



12

Φ 3.2×5.4mWet Overflow Ball Mill Installation And Operation Instruction
install it and anchor bolt together on the foundation and adjust it to the correct location. 4.3.2Center distance between two base plates should comply with rule of designing drawing /file (tolerance is not greater than 2mm). After installing Shell and end cap, actual size and design size have bias sometimes, under this condition, construct against actual size if relevant parts agree that. 4.3.2Measure relevant elevation between two main-bearing base plates with liquid-connected equipment /theodolite, tolerance is 0.5mm; make sure feed end is higher than discharge end, measure elevation and level simultaneously. 4.3.3 Place bearing block on bearing board and make their centerline coincide, observation holes toward outside, their interface connect equably, parts gap isn’t greater than 0.1mm, end length untouched is not more than 100mm,total length is not greater than 1/4 of circumference length, otherwise, it should be handled. Before installation, should check if bearing bushing face and trunnion of sell end cap connect well or not? Inspect whether bushing back and bushing base connect well or not, without jamming, with appropriate gap. 4.3.4 After installing bushing, should test its pressure, value isn’t lower its

总 22 页 第



13

Φ 3.2×5.4mWet Overflow Ball Mill Installation And Operation Instruction
than rated working pressure of high pressure oil pump, testing time isn’t less than 30min, if discover leakage ,should eliminate it drastically. 4.3.5Before installing cap ,should put through cooling water pipe firstly and then test pressure. Testing pressure is 0.4-0.6Mpa, testing time is 30 min, should be no leakage. 4.3.6 After installing bearing base, check if cooling tube in bearing block and trunnion connect well or not, bushing clamp and gap between bushing should meet requirements of drawing. At last, clean foreign matters in bearing block and blank off all of unuseless hole pit bolts, fill sealing ring gouge with lithium grease where main shaft and trunnion connect and test whether grease nipple is unimpeded. 4.3.7 Install ring seal according to technical requirements of drawing. 4.4Turning assembly (feeding assembly, discharging assembly , shell, gear ) 4.4.1Before installing turning assembly, check quill shaft and repair damnification of surface. Such as corrosion, scratch and so on. At the same time, clean glitch, fins and anti-corrosive paint, if can’t install right now after cleaning, should daub anti-corrosive grease on machined surface and pack it. 4.4.2Before installing turning assembly on bearing, should equip lower

总 22 页 第



14

Φ 3.2×5.4mWet Overflow Ball Mill Installation And Operation Instruction
housing of bearing firstly. After installing it, must measure its overall length and length between two trunnions. Also, correct it with center distance of bearing block, if isn’t discrepancy, need to modify foundation. Before installing turning assembly on main bearing assembly , should clean interior of main bearing and trunion ,when install shell ,prohibit fastening wire ropes on trunnion so as to score surface of it, during installation ,should avoid dust falling into surface of bushing ,when trunnion fall to connect bushing closely ,about 5-10mm,shell should pause falling, at this time ,wash bushing surface and trunnion by diesel, after that , add a little lubrication oil on them and then put trunnion on the bushing ,shouldn’t bruising it. 4.4.3After installing shell on main bearing, should check if generatrix of two trunnions are at the same horizontal plan or not and their bias shouldn’t greater than 1mm, Also feeding end should higher than discharging end. At the same time ,measure the gap between internal end surface of moving end(feeding end ) trunnion and bushing surface should more than 15mm. 4.4.4Before installing gear on shell, should put lower housing of gear on its location and check gear cover. If discover leakage ,should get rid of it

总 22 页 第



15

Φ 3.2×5.4mWet Overflow Ball Mill Installation And Operation Instruction
and clean its interior. 4.4.5Clean gear and shell, after installing, flange end face and shell end face should contact closely, gap between them is less than 0.15mm. Tightening torque putting together all bolts is for 196-294N.M. 4.4.6Two half-gear valleys should contact closely without gaps. 4.4.7The tightening torque of shell ,end cover and gear accord to JB/T5000 assembly general technical appendix A:8.8grade M56, 6791N.m ;8.8grade M48 4236N.m; 8.8grade M36,1749N.m;

M30,1004N.m;1004N.m. 4.4.8Don’t lift rotation assembly by lifting lug on end cap. 4.5 Transmission assembly 4.5.1After installing gear on shell, adjust by adjusting bolts: gear face runout isn’t more than 0.25mm/per meter cross-sectional diameter, gear radial runout isn’t greater than 0.25mm/per meter cross-sectional diameter. 4.5.2Gap between gear and pinion should be about 1.4-2.5mm after installing. 4.5.3 meshing contact ratio of gear and pinion ,height along tooth isn’t less than 45%, length along tooth isn’t less than 60% 4.5.4 Only when gear and pinion should be all meet standard , can fasten

总 22 页 第



16

Φ 3.2×5.4mWet Overflow Ball Mill Installation And Operation Instruction
bearing block and fix position. 4.5.5 Should smear a little lubrication oil on sealing face of gear two sides. 4.5.6 If heat pack pinion, shaft and bearing, heating temperature shouldn’t exceed 120℃ ,after installing ,shouldn’t quench(nature

cooling)and roast by open fire; if cold stock ,temperature isn’t lower than -80℃ 。 4.6 Install clutch Accord to installation manual strictly and check all parts dimension (such as diameter ,length ,keyway, chamfer, interference) firstly ,when heat pack ,heating to required temperature by oil or metal box, forbid roasting by open fire, error of axiality of driven shaft which need to be contacted shouldn’t exceed 0.2mm. 4.7Lubrication system Before installing lubrication system, should clean oil tank firstly, then accord to manufacturer instruction for installation after passing inspection. During installation, oil drain hole of oil tank should extend to its foundation outside and distance away from ground isn’t less than 300mm (or set pits), otherwise, it is inconvenience to discharge oil.

总 22 页 第



17

Φ 3.2×5.4mWet Overflow Ball Mill Installation And Operation Instruction
4.7.2 Before installation, should pickling steel pipe firstly by 20% sulfuric acid or hydrochloric acid solution, during the washing process should observe momentarily, after removing rust, immerse pipe to 3% limewater about 1-2 hours to neutralize them and then inject lubrication oil into pipe to prevent re-rusting, at the same time, block both ends of pipe to prevent dust. Above operation should be continuous. Parallel or cross-pressure pipeline, there should be a space between two tube walls to prevent vibration interference. After installing lubrication system, should be tested, testing pressure throughout the cooling water is not less than 0.45Mpa and no leakage within 30min ,high-pressure pipeline test pressure shouldn’t lower than the high-pressure pump rated pressure, test pressure 30min. 4.7.3Returning pipeline must be tilted to the direction of oil tank and its slope isn’t less than 1:40. 4.7.4 Lubricating medium and dosage a. Main bearing: Recommend N200-N460 Industrial gear oil GB5903-1995.Input dosage against oil standard instruction (about 1m3) b. Rolling bearing: Recommend lithium-based grease No.3 GM GB7324-1994.Amount shall not exceed the 1/2volume of bearing cavity .

总 22 页 第



18

Φ 3.2×5.4mWet Overflow Ball Mill Installation And Operation Instruction
c. Ring sealing: Recommend lithium-based grease No.3 GM GB7324-1994.Fill full of ring groove. d. Gear and pinion: Recommend N680 industrial gear oil

GB5903-1995, Set spray cycle by service condition, advises to spray once time per 30 min (10seconds) at least.

4.8.1Before using, must pad the bottom solidly and on the same level. During using process, as hoist as pad fixing timbering. No synchronized rated of jack isn’t more than 3% .Don’t support transmission assembly by lifting device long-term. 4.8.2 Lifting device should fall back stably (switch location of pressure maintaining of high-pressure pump and discharging) 4.9Motor Disalignment of clutch and motor isn’t greater than 0.3mm; grandient of centerline isn’t more than 1mm/m. if necessary, refer to motor installation instruction. 5. Adjusting 5.1Inspect ball mill before starting, only when meets requirements as Follows:

总 22 页 第



19

Φ 3.2×5.4mWet Overflow Ball Mill Installation And Operation Instruction
a. Tighten all of bolts as requirements b. The lubrication and cooling systems should be consistent with design requirements and the relevant film, all pipe valve should be flexible , no leakage, oil surface is up to required elevation ,if in winter, heating lubrication oil to 20-25℃ and check the flow of oil ,gas, water ,pressure. c. All security contacting signal and protect device should be flexible ,interlock normally , apparatus show correctly. d. Check if accessory equipment have been installed and perform normally or not, after starting, material shall be unimpeded. e. Clean up the site and dispose barrier effecting the operation of ball mill ,after opening ,don’t stand on the two ends of ball mill. f. Check whether slow drive, clutch are flexible or not, when unused, should be in the disengaged position and fixed. J .motor rotation must be consistent with drawing requirements(check by motor rotation) 5.2 starting ball mill at the first time should take the way of stopping at any moment. a. make ball mill rotate slowly by the slow transmission 1-2 ,check all parts

总 22 页 第



20

Φ 3.2×5.4mWet Overflow Ball Mill Installation And Operation Instruction
b. motor idling(without mill),operates continuously about 4 hours C.drive ball mill to operate continuously 24 hours (without ball and material) D. Manual in gear meshing place. 5.3 Unload testing should meet requirements as follows: a. All of lubrication points should be normal, no leakage b.Temperature of main bearing shouldn’t exceed 50℃ and return oil shouldn’t exceed 40℃ . c. temperature of cooling bearing :water at<28℃ out of water at,40℃ , ; volume of water: general2-4m3/h. d.Ball mill should operate stably and gear transmit without abnormal noise, tooth contact well. e. lining and moving parts are not loosen. 5.4Adjusting 5.4.1Starting low and high pressure oil station, buoyance lift revolution assembly (apparent relief, or visible grinding pendulum), starting low -speed driving and Spray lubricating Equipment, so that ball mill rotates one circuit at least. 5.4 After passing the no-load testing, add steel medium into shell, after that, ball mill shouldn’t operate without material so as not to damage

总 22 页 第



21

Φ 3.2×5.4mWet Overflow Ball Mill Installation And Operation Instruction
liners. when testing with load ,add 20-30% ball to ball mill at first, it takes 50% of total material, starting by prescribed procedures, operate normally , every 30 minutes by adding 10% of the total medium, and add into appropriate amount material until ball mill full load, run continuously for 24 hours. 5.5Ball mill run with load, should meet requirement s as follows: a. working stably , without dramatic cyclical vibration. b. Current value of main motor within permitted scope and no abnormal fluctuations. c. All components operate normally. d. Bolt parts of per liner can’t leak powder, if not, tighten bolts in time e. Check if the bolt of all parts of is loose, break or fall off or not. f. Main bearing temperature is below 55 ℃ return oil temperature is , below 50 ℃ .

6. Usage and operation 6.1Sequence of Starting and stopping 6.1.1 Starting sequence Low pressure oil pump---high pressure oil pump-----main

总 22 页 第



22

Φ 3.2×5.4mWet Overflow Ball Mill Installation And Operation Instruction
motor-----motor of feeding assembly Generally, shouldn’t start machine twice time continuously within one hour. 6.1.2Stopping sequence Stop feeder - → stop main motor - → start high-pressure oil pump automatically - → after ball mill stopped, stop low-pressure oil pump - → stop high-pressure oil pump according to bearing temperature, and then (manually), every 30 minutes start 2 minutes high-pressure oil pump (until the shell cooled to room temperature).

Spray lubrication system runs or stops automatically while main motor works or stops When main motor are working, slow drive can’t be started, while slow drive is running, can’t start main motor.

6.2 Emergency Stop During operation process, sometimes with a certain special

circumstances, in order to ensure the safety of equipment, must take urgent measures to stop machine as the following conditions: a. gear and pinion mesh normally, vibrate suddenly, or reducer sounds

总 22 页 第



23

Φ 3.2×5.4mWet Overflow Ball Mill Installation And Operation Instruction
noisy. b. lubrication system failure and supply oil unmorally c. liner bolts loose or broken off. d. Ball mill runs continuously without material in shell e. main bearings, main motor temperature rise or current value of main motor exceed the specified value f. pre- process and post process fail to loss capacity. g. Anchor bolts of main bearing, transmission equipment and the main motor loose.. h. Other required an emergency stop condition. During an emergency stopping, should stop feeding instantaneously and cut down motor and power of other assemblies, after then, deal with the accident. 6.3 Stop on a long time Long-term stop, Shell cooling and contract gradually, trunnion slides on bearing to reduce friction and axial tension generated by shell contraction, start high-pressure oil pump about two minutes every sessions after stopping machine, so as to maintain a certain film Thickness between the Trunnion and bushing of bearing.

总 22 页 第



24

Φ 3.2×5.4mWet Overflow Ball Mill Installation And Operation Instruction
Stopping in winter, should exhaust all cooling water of water cooling assembly (blowing with compressed air) and to avoid Frost Crack pipeline. Generally, before stopping, should stop feeding, after then, stop ball mill running soon. Plan long-stay parking, should clean media and materials out in order to avoid distorting shell and consoled load. 6.46 when operating normally, operator must observe and pay attention to the following matters. 6.4.1 If not feeding, ball mill shouldn’t operate with a long-term so as not to damage linings and consume media. 6.4.2 Feeding uniformly is one of the important conditions that ball mail can work with optimum working efficiency, so operator should ensure to feed uniformity. 6.4.3 Inspect wear pattern of liner and media in shell, replace rupture bushing in time and replace or tighten bolts which are loosed or break off, in order to avoid to worn out shell 6.4.4Check and ensure that all lubrication points are full fill with enough cleaning lubricating oil (grease), scavenge filter of thin oil station should be cleaned once time at least per month and check quality of lubricating every six months, if necessary, should replace new oil.

总 22 页 第



25

Φ 3.2×5.4mWet Overflow Ball Mill Installation And Operation Instruction

6.4.5 Check if pinion and gear mesh well or not and whether bolts loose or not. 6.4.6 According to materials and product size, regulate adding volume and size distribution of medium, and add them into ball mill promptly, so that they can keep on high-point, adding medium is the maximum diameter of specifications for the first time adding. 6.4.7Protecting cover and other safety protect devices are good for using, in danger area, should hang up warning board. 6.4.8 during operation shouldn’t repair machine .When need to enter shell, must get in touch with the officers firstly, take control measures and make markings. When ball mill is running, observe interior of main bearings; pay special attention not to be injured by moving objects.

6.4.9when Inspect and repair auxiliary machinery, only use low pressure lighting device, when welding components of ball mill, should pay attention to grounding protection to prevent major surface of ball mill.

6.4.10temperature and quantity of cooling water in main bearing and oil

总 22 页 第



26

Φ 3.2×5.4mWet Overflow Ball Mill Installation And Operation Instruction
station shouldn’t exceed permitted temperature with adjusting

appropriately. 6.4.11During using process, should inspect and maintain the machine timely, Should clean it usually, ensure that no leak water, powder, no oil, no loose bolts and no debris around the equipment. 6.4.12Ball mill shouldn’t operate without material 6.4.13when start or stop machine, high-pressure pump should be in operation. 6.4.14 ball mill shouldn’t overload, filling rate of feeding is the maximum. 7Maintaince

Excepting maintain and inspect daily, should overhaul timely , according to particular case of equipment, make repairing plan to overhaul timely. According to degree of injury, divide into current, medium and heavy repair. 7.1Current repair
Generally, do current repairs every 1 -- 2 months, when in special circumstances may do it at any time, main overhaul items as following: a check pumps, oil filters, and lubrication pipeline , if necessary, clean them and replace of oil.

总 22 页 第



27

Φ 3.2×5.4mWet Overflow Ball Mill Installation And Operation Instruction
b. Check joint of bolts and replace defective fasteners. c. clean and inspect if pinion and gear have defects such as cracks or not. At the same time, check the meshing case and record its wearing depth, check if bolts of gear loose or not. d. check clutch and make a record, replace the wearing parts. e. inspect and repair the easy-wear parts of the feeding and discharging device. f. replace parts of ball mill liner. g. Check the bearing alloy thickness of main bearings h. Check if cooling water system, pipeline are blocked or leak or not, replacing aging oil rubber tubes (in the main bearing box). 7.2 medium repairs The medium repairs cycle is generally 12 months, overhaul items as follows: a. including current repair items b. Replacement of Liner c. Check or replace bushing of feeding and discharging. d. check , repair or replace pinion. e. Check and adjust horizontal position of shell, inspect concentricity of drive shaft, clutch and motor.

总 22 页 第



28

Φ 3.2×5.4mWet Overflow Ball Mill Installation And Operation Instruction
f. clean up oil inside gear cover. g. inspect and calibrate instruments. h. other items needed to be repaired.

7.3heavy repairs The heavy repairs cycle is generally 15-10 years, according to the damaged degree, overhaul items as follows: a. Including items of current and medium repair. b. Replace bushing of main shaft and gear, pinion. c. Repair or replace end covers of feeding and discharge devices d. Inspect foundation , re-aligning and cast second time In short, install and usage of ball mill must be accordance with the technical requirements of relevant standards, specifications, drawings strictly.

总 22 页 第



29

Φ 3.2×5.4mWet Overflow Ball Mill Installation And Operation Instruction
Wearing parts catalog: Wearing parts Name
Cover Feed drum Feed bushing Side liner 1 Side liner 2 Cylinder liner 1 Cylinder liner 2 Cylinder liner 3 Cylinder liner 4 Cylinder liner 5 Discharging bushing

Wearing parts Drawing No.

Remark

pinion

总 22 页 第




相关文章:
BALL MILL
BALL MILL_机械/仪表_工程科技_专业资料。1 Φ 3.2×5.4mWet Overflow Ball Mill Installation And Operation Instruction Catalog 1 2 3 4 5 6 7 1 Φ ...
球磨机使用说明书
球磨机的安装 The installation of the ball mill 1.付底板安装 Pay floor installation 1) .在安装主底板前基础表面应清除杂物、 污垢, 在施工中不得使基础表面...
Ball Mill
Ball Mill_英语考试_外语学习_教育专区。We are specialized in providing Ball Mill to our esteemed clients. Ball Mill is a horizontal rotatin...
行星球磨机设计说明书
Keyword:Ballmill;Planetarygear;Themainparameters;Motion analysis 本科毕业设计(论文)通过答辩 4 第一章绪论 1.1 课题的来源、研究的意义及现状分析 1.1.1 ...
Prevent fretting wear for ball mill grinding ball
Prevent fretting wear for ball mill grinding ball_冶金/矿山/地质_工程科技_专业资料。The fretting wear phenomenon in ball mill is difficult to be ...
Matching relation between grinding ball hardness and Ball mill liner hardness
Matching relation between grinding ball hardness and Ball mill liner hardness_机械/仪表_工程科技_专业资料。Currently grinding ball and mill liners is mostly...
球磨机毕业设计论文
关键词: 关键词:球磨机;进料装置;进料口;进料点 - III - Abstract Abstract Ball mill winch grinds material by rotating a cylinder with steel grinding ...
φ3200x4500球磨机说明书en
(1)球磨机操作的知识 Operation method for ball mill 判断球磨机运转是否正常有两种常用的办法:第一种办法是检查物料的出料粒 度,若合乎要求,且跳动不大,就说明...
沈重球磨机[1]
球磨机、自磨机、半自磨机 球磨机、自磨机、半自磨机 价格:¥ 面议 1、产品用途及特点 球磨机(Ball Mill)、自磨机(AG Mill)、半自磨机(SAG Mill)广泛应用于...
UG编程注意需知
Milling 一、 End mill (non indexable) 端铣(不可转位) 端铣(不可转位) 二、 End mill (indexable) 端铣(可转位) 端铣(可转位) 三、 Ball mill (non...
更多相关标签:
mill | ball milling | eia | ball mill是什么意思 | 摇床 | planetary ball mill | ceramic ball mill | ug ball mill |