Butler (Shanghai) Inc. No.21 Baosheng Road, Songjiang Industrial Zone, Shanghai ZiP Code:201613 Tel: 02

1-57741717, Fax: 021-57741813 Butler (Tianjin) Inc. No.151 Beihai Road, TEDA Developing Zone, Tianjin Zip code:300457 Tel: 022-25321717, Fax: 022-25327696 BlueScope Buildings (Guangzhou) Limited No.98 Pubei Road, East District, Yunpu Industrial Zone, Huangpu, Guangzhou, Guangdong Province Zip510530 Tel: 020- 82251717, Fax: 020- 82251085

阅读此报价时请先了解以下条款: ? Proposal 必须与 Costmaster 互相吻合。销售部门任何人对 Costmaster(Proposal)作的任何 修改,其本人有责任将变化体现在 Proposal(Costmaster)中。 此报价仅与销售(TS)书面提交给报价部 Proposal Request Form 及 Sketch 要求符合。不保 证完全满足其它任何材料(如业主招标文件,建筑图等)的要求。 此报价接受者有责任对此 Proposal 供货范围及材料规格校核,以确保与您的要求相符。

?

?

DATE:2011,8,24 TO: ATTN.:Bob Lu FROM:Xiao Yan/Tim Zhu RE: Butler Proposal No.: B102016592(Rev.5) NUMBER OF PAGES: SEND TO FAX NUMBER: PROPOSAL TYPE Please consider this proposal to provide materials for the following Butler pre-engineered metal building (“PEMB”) and its related components as specified herein. Proposal type: Firm DESIGN RECURENCE INERVAL Butler will use 50 years recurrence interval for design against load failure BUILDING RELIABILITY LEVEL: 2 MAIN DESIGN BUILDING CODES 1) Technical Specification for Steel Structure of Light –weight Buildings with gabled Frames CECS102:2002
QA FormNo.:310-2 Effective Date: Jul/1/10

1

Butler PROPOSAL

2) Code for Design of Steel Structures GB50017-2003 3) Load Code for the Design of Building Structures GB50009-2001 4) Code for Seismic Design of Buildings GB50011-2001 5) Technical Code of Cold-formed Thin-wall Steel Structures GB50018-2002 6) FM DESIGN LOADS Chinese Code Roof Live Load frame/purlin Roof Reference Snow Load Roof Collateral Load frame/purlin Reference Wind Load Design Seismic Intensity Importance Category: C Roof Dust Load 0.3/0.5kN/m2 0.35kN/m2 0.2/0.2kN/m2 0.4kN/m2 , exposure B 7o(0.10g) Group 1 Soil Profile:II No

Note:Full snow loads on all spans are considered in design only. FM Requirement Roof Live Load Wind Speed Snow Load FM Rating: Field Zone Perimeter Zone Corner Zone 0.96kN/m2 38m/s(3 second gust wind) 0.35kN/m2 I-75(field) I-120(perimeter zone) I-165(corner zone)

FLOOR DESIGN LOADS AND ASSUMTIONS Floor Live Load 2.5/5.0/6.0/10/15 kN/ m2 Floor Dead Load 4.0 kN/ m2 Floor Collateral Load 0 kN/ m2 Floor Partition Load 1.0kN/ m2 Vibrate Load: No Special Equipment Load: No RC Strength Rating: C30 Corrosive: No Special Notes for Collateral load: 1) The bridge load will be taken by roof beams(location refer to skecth) Deflection Limits Frame Drift Roof Beam Deflection Purlin Deflection Girt Sideway Deflection: Floor Beam Deflection: Floor Stringers Deflection: h/60 h/240(With Mezz.) L/180(No Ceiling) L/240(With Ceiling) L/150(No Ceiling) L/240(With Ceiling) L/100 L/400( Dead+Live) L/250( Dead+Live)
QA FormNo.:310-2 Effective Date: Jul/1/10

2

Butler PROPOSAL

Relative Humidity

No special requirement

BUILDING DESCRIPTION Existing building 1: Width Length Height Building Type Roof Pitch Sidewall Bays Endwall Spacing Roof Condition Wall Condition Existing building 2: Width Length Height Building Type Roof Pitch Sidewall Bays Endwall Spacing Roof Condition Wall Condition New building : Width Length Height Building Type Roof Pitch Sidewall Bays Modules Endwall Spacing Roof Condition Wall Condition 29.2 m (column outer line to column outer line) 129.2 m (column center line to column center line) 10.2 m Eave Height Steel roof beam+cladding 7% 17@7.6m 29.2 m 4@7.3m MR24+75mm WMV-VR Butler wall panel is sitting 1.5 m height Wainscot BRII+75mm FSK Insulation+BRII liner Common wall with adjacent buildings is not by Butler 85.2/77.2 m (column outer line to column outer line) 33.1 m (column center line to column outer line)
QA FormNo.:310-2 Effective Date: Jul/1/10

48 m (column outer line to column outer line) 152 m (column center line to column center line) 10.2 m Eave Height Only supply reinforce steel 7% 20@7.6m 6@8m Existing roof Siphon system on the grid C Existing wall 48 m (column outer line to column outer line) 129.2 m (column center line to column center line) 10.2 m Eave Height Only supply reinforce steel 7% 17@7.6m 6@8m Existing roof Siphon system on the grid D Existing wall

New office : Width Length

3

Butler PROPOSAL

Height Building Type Roof Pitch Sidewall Bays Modules Endwall Spacing Mezzanine Floor Height Roof Condition

Wall Condition

10.2 m Eave Height Multi-ridge 7% 6.9m+2@7.6m+2@5.5 8m+11.2m+18m+2@24m/11.2m+18m +2@24m 8m+2@5.6m+2@9m+6@8m 4.9 m MR24+75mm WMV-VR Siphon system on the grid C&D Inerior eave gutter on the grid F Full height Butler wall BRII+75mm FSK Insulation+ BRII liner Common wall with adjacent buildings is not by Butler 15 m (column outer line to column outer line) 68.4 m (column center line to column center line) 5.8 m Eave Height(5.0 m Clear Height) LRST 5% 9@7.6m 15 m 2@7.5m BRII+75mm WMV-VR Exterior eave gutter Butler wall panel is sitting 1.5 m height Wainscot BRII+75mm FSK Insulation+BRII liner Common wall with adjacent buildings is not by Butler 8.1 m (column outer line to column outer line) 15.3 m (column center line to column center line) 5.8 m Eave Height(5.0 m Clear Height) LRST 5% 2@7.65m 8.1m 8.1m BRII+75mm WMV-VR Exterior eave gutter Butler wall panel is sitting 1.5 m height Wainscot BRII+75mm FSK Insulation+BRII liner Common wall with adjacent buildings is not by Butler

Annex Room 1 : Width Length Height Building Type Roof Pitch Sidewall Bays Modules Endwall Spacing Roof Condition Wall Condition

Annex Room 2 : Width Length Height Building Type Roof Pitch Sidewall Bays Modules Endwall Spacing Roof Condition Wall Condition

QA FormNo.:310-2 Effective Date: Jul/1/10

4

Butler PROPOSAL

Structure Scheme Brief Introduction Existing building 1&2 and New Mezzanine: 1) The reinforce steel of existing buildings is designed by DI, The weight of reinforce steel is about 235.647 tons after our estimation for the structural drawings provided by DI(2011,08,04). Butler will supply reinforce steel(no pre-engineered,只给型 钢,不预制,主要工作现场安装) and deliver products to jobsite ,Butler only consider dimension of drawings and don’t consider deflection、modification and machining deviation. In case the final structure drawings have something different from the present ones, Butler will change our lump-sum price accordingly 2) Mezz. beams are designed base on composited type New building: 1) Only supply roof beams、wind posts and secondaries 2) Bracing type-Roof: rod 3) Steel structure design will be finished by Butler. And we assumed the foundation has not been finished. New office: 1) Columns with mezz. are with fixed base,other columns are with pinned base 2) Bracing type-Roof: rod, wall: X type rod, there will be some interior portal frame bracing above mezz. 3) Mezz. beams are designed base on composited type 4) Steel structure design will be finished by Butler. And we assumed the foundation has not been finished. Annex Room 1&2: 1) Single story buildings rigid frames with pinned base; 2) Bracing type-Roof: rod, wall: X type rod 3) Steel structure design will be finished by Butler. And we assumed the foundation has not been finished. MATERIALS SCOPE, INCLUDED Existing building 1&2: Primary Steel 1 Lots of reinforce steel -Pre- painted with Butler’s standard primer 50?m

Roof System 1 Lots of reinforce roof structurals - Located on roof of existing vent - Pre-galvanized 1140 Square meter of Butlerib? II roof panel as follows:(un-punched) - Located on roof of existing vent - 0.5mm TCT - ZINCALUME ? steel - Utilizing self drilling screw for panel to structure and panel to panel fastener - Using sealants at side and end laps 38 Sets of electric axial flow type roof fans as follows: - 28 sets of roof fans of capacity per unit:15000 m3/h; 4 sets of roof fans of capacity per unit:8348 m3/h; 4 sets of roof fans of capacity per unit:12114 m3/h; 5 QA FormNo.:310-2
Effective Date: Jul/1/10

Butler PROPOSAL

20 456 282

2 sets of roof fans of capacity per unit:8552 m3/h; - Aluminum body and cover - Aluminum alloy blades - With roof curbs Lineal meter of gable trim with panel eave closure (charcoal, stone white or prime painted colors-other colors available at an additional charge) Lineal meter of side eave trim (charcoal, stone white or prime painted colors-other colors available at an additional charge) Lineal meter of wide stainless steel multiple gutter (This item specifically includes siphon system of 50 years recurrence interval).

Wall System 9 Wall openings as follows: - 8@2mx0.8m+1@2mx0.4m - Support opening with trims and flashings - The locations may need to be adjusted a little bit to match panel modules(within +/-300mm) Other 3 1 New building: Primary Steel 1 1 Lots of primary steel -Pre- painted with Butler’s standard primer 50?m Lots of bracing -Pre- painted with Butler’s standard primer 50?m -Rod type Sets of specific erection drawings Formal Design Data (if required)

Roof System 3783 Square meter of roof structurals (Z Purlin) - Continuous span, punched - Pre-galvanized 3603 Square meter of MR-24? roof panel as follows: - Deducted roof Lite*panels area - 0.63mm TCT - ZINCALUME ? steel - Punched for panel to eave and splice attachment - Panel sidelap will be formed to 360o Pittsburgh double lock standing seam - Utilizing high quality movable panel clip for panel to structure attachment - Using sealants at side and end laps 1 Lot of roof insulation as follows: - 75mm thick fiberglass blanket,16kg/m3 - WMP-VR facing: polypropylene reinforced with fiberglass & polyester/kraft paper backing 8.7 Lineal meter of below eave canopy: - 1.5m projection - Butlerib? II ZINCALUME ? steel roof panel 6

QA FormNo.:310-2 Effective Date: Jul/1/10

Butler PROPOSAL

100

18

29

- With standard gable trims, gutter, downspouts and transition - With BRII soffit Pieces of MR24? roof Lite*panels as follows: - 600 mm x 3000 mm each(including edge frame) - Double layer - Trims with fixed color (may be different with liner panel, it needs additional price and schedule for other colors) Sets of electric axial flow type roof fans as follows: - 14 sets of roof fans of capacity per unit:15000 m3/h; 2 sets of roof fans of capacity per unit:8348 m3/h; 2 sets of roof fans of capacity per unit:12114 m3/h; - Aluminum body and cover - Aluminum alloy blades - With roof curbs Lineal meter of gable trim with panel eave closure (charcoal, stone white or prime painted colors-other colors available at an additional charge)

Wall System 229 Square meter of wall structurals for a Butlerib? II wall system, pre-galvanized 229 Square meter of Butlerib? II wall panel as follows: - 0.5mmTCT - Clean COLORBOND? XPD Pre-painted steel - Standard colors (Special coating and color need confirm and additional cost) - Un-punched for panel to structural attachment - Utilizing Torx self drilling screw panel to structural fastener - Utilizing Torx self drilling screw panel to panel fastener - Wall panel will not be factory cut for man door, louver or window openings - Man doors, louvers and windows will be field located 229 Square meter of BRII wall Liner panel as follows: - 0.37mm TCT - OPALTM steel - Painted Butler standard stock polyester paint on exposed side - Un-punched for panel to structural attachment - Utilizing Self drilling screw panel to structural fastener - Utilizing Self drilling screw panel to panel fastener - Wall panel will not be factory cut for man door, louver or window openings - Man doors, louvers and windows will be field located 1 Lot of wall insulation as follows: - 75mm thick fiberglass blanket, density 12kg/m3 - FSK facing: Aluminum Foil reinforced Scrim / Kraft paper backing 4 Windows openings as follows: - Support opening with trims and flashings - 1@26.4mx1.5m+1@8mx1.8m+1@4.8mx1.8m+1@6.4mx1.8m - The locations may need to be adjusted a little bit to match panel modules(within +/-300mm) 2 Doors openings as follows: - 1@1mx2.1m(H)+1@4.0mx4.0m(H) - Support opening with trims and flashings - The locations may need to be adjusted a little bit to match panel modules(within +/-300mm)
QA FormNo.:310-2 Effective Date: Jul/1/10

7

Butler PROPOSAL

Other 1 3 1 New office: Primary Steel 1 1

Lot of hook type anchor bolts for this project, shipped with building Sets of specific erection drawings Formal Design Data (if required)

1

285

Lots of primary steel(including steel of glass canopy) -Pre- painted with Butler’s standard primer 50?m Lot of mezzanine floor steel including: -Area of 2231 m2 (4.9m floor height) -Floor stringers, beams and columns, pre- painted with Butler’s standard primer 50?m -Metal floor deck- 2Wx0.75mm, pre-galvanized -Perimeter edge angle, pre-galvanized -Shear studs - Three sets of stairs, pre- painted with Butler’s standard primer Include handrail(h=1.05m, located at two sides, without baseboard) Lots of bracing -Pre- painted with Butler’s standard primer 50?m -Rod type Square meter of roof platform including: - pre- painted with Zinc rich Epoxy 50?m,MIO intermidient 30?m, Polyurethane finish 70?m (Top coat painting approx. 35?m to be applied at site not by Butler, Butler will supply materials only) -Box columns penetrating the roof with strip flashing - Beams and stringers -6 mm checkered plate -65 lineal meter handrail(h=1.05m,four horizontal poles )

Roof System 2722 Square meter of roof structurals (Z Purlin) - Continuous span, punched - Pre-galvanized 27 Square meter of Butlerib? II roof panel as follows:(pre-punched) - 0.5mm TCT - ZINCALUME ? steel - Punched for panel to structural attachment - Utilizing scrubolt or Lockrivets panel to structural fastener - Utilizing self drilling screw and Lockrivets panel to panel fastener - Using sealants at side and end laps 2695 Square meter of MR-24? roof panel as follows: - 0.63mm TCT - ZINCALUME ? steel - Punched for panel to eave and splice attachment - Panel sidelap will be formed to 360o Pittsburgh double lock standing seam - Utilizing high quality movable panel clip for panel to structure attachment - Using sealants at side and end laps
QA FormNo.:310-2 Effective Date: Jul/1/10

8

Butler PROPOSAL

1

21.8

15 4 1 89 34 45 18 7.5 2

Lot of roof insulation as follows: - 75mm thick fiberglass blanket,16kg/m3 - WMP-VR facing: polypropylene reinforced with fiberglass & polyester/kraft paper backing Lineal meter of below eave canopy: - 1.1m projection - Butlerib? II ZINCALUME ? steel roof panel - With standard gable trims, gutter, downspouts and transition - With BRII soffit Lineal meter of perpendicular transition - roof to wall Lineal meter of parallel transition - roof to wall Ridge to wall transition Lineal meter of gable trim with panel eave closure (charcoal, stone white or prime painted colors-other colors available at an additional charge) Lineal meter of stainless steel multiple gutter including 5 collector boxes (Include interior PVC downspouts, only to interior finished floor) Lineal meter of wide stainless steel multiple gutter (This item specifically includes siphon system of 50 years recurrence interval). Lineal meter of high side eave trim (charcoal, stone white or prime painted colors-other colors available at an additional charge) Lineal meter of Narrow eave gutter with weatherseal (charcoal,stone white or prime painted colors-other colors available at an additional charge) Narrow downspouts for Narrow eave gutter

Wall System 1080 Square meter of wall structurals for a Butlerib? II wall system, pre-galvanized 1080 Square meter of Butlerib? II wall panel as follows: - 0.5mmTCT - Clean COLORBOND? XPD Pre-painted steel - Standard colors (Special coating and color need confirm and additional cost) - Un-punched for panel to structural attachment - Utilizing Torx self drilling screw panel to structural fastener - Utilizing Torx self drilling screw panel to panel fastener - Wall panel will not be factory cut for man door, louver or window openings - Man doors, louvers and windows will be field located 1080 Square meter of BRII wall Liner panel as follows: - 0.37mm TCT - OPALTM steel - Painted Butler standard stock polyester paint on exposed side - Un-punched for panel to structural attachment - Utilizing Self drilling screw panel to structural fastener - Utilizing Self drilling screw panel to panel fastener - Wall panel will not be factory cut for man door, louver or window openings - Man doors, louvers and windows will be field located 1 Lot of wall insulation as follows: - 75mm thick fiberglass blanket, density 12kg/m3 - FSK facing: Aluminum Foil reinforced Scrim / Kraft paper backing 17 Windows openings as follows: - Support opening with trims and flashings - 1@6.4mx7.9m+1@17.2mx7.9m+2@4.5mx1.5m+2@3mx2.7m+
QA FormNo.:310-2 Effective Date: Jul/1/10

9

Butler PROPOSAL

9

9

2@14.8mx1.8m+1@23.7mx1.8m+1@29.6mx1.8m+1@9mx1.8m+ 2@3.2mx1.8m+1@4mx1.8m+1@6.4mx1.8m+2@3.2mx1.8m - The locations may need to be adjusted a little bit to match panel modules(within +/-300mm) Doors openings as follows: - 1.5mx2.4m(H) - Support opening with trims and flashings - The locations may need to be adjusted a little bit to match panel modules(within +/-300mm) Wall openings as follows: - 8@0.56mx0.56m+1@2mx1.8m - Support opening with trims and flashings - The locations may need to be adjusted a little bit to match panel modules(within +/-300mm) Lot of hook type anchor bolts for this project, shipped with building Sets of specific erection drawings Formal Design Data (if required) Galvanized ladder, 0.745m in width, 0.3m in tread high, 0.45m in cage radius(locate near column)

Other 1 3 1 2

New Mezzanine in Existing building Primary Steel 1 Lot of mezzanine floor steel including: -Area of 1258(4.0/4.8/5.5m eight) -Floor stringers, beams and columns, pre- painted with Butler’s standard primer 50?m -Metal floor deck- 2Wx0.75mm, pre-galvanized -Perimeter edge angle, pre-galvanized -Shear studs -178 lineal meter handrail(h=1.05m,four horizontal poles ) - Six sets of stairs, pre- painted with Butler’s standard primer Include handrail(h=1.05m, located at two sides, without baseboard)

Annex Room 1&2: Primary Steel 1 1 Lots of primary steel -Pre- painted with Butler’s standard primer 50?m Lots of bracing -Pre- painted with Butler’s standard primer 50?m -Rod type

Roof System 1211 Square meter of roof structurals (Z Purlin) - Continuous span - Pre-galvanized 1211 Square meter of Butlerib? II roof panel as follows:(un-punched) - 0.5mm TCT
QA FormNo.:310-2 Effective Date: Jul/1/10

10

Butler PROPOSAL

1

38

85 48 85 12

- ZINCALUME ? steel - Utilizing self drilling screw for panel to structure and panel to panel fastener - Using sealants at side and end laps Lot of roof insulation as follows: - 75mm thick fiberglass blanket,16kg/m3 - WMP-VR facing: polypropylene reinforced with fiberglass & polyester/kraft paper backing Lineal meter of below eave canopy: - 1.2m projection - Butlerib? II ZINCALUME ? steel roof panel - With standard gable trims, gutter, downspouts and transition - With BRII soffit Lineal meter of perpendicular transition - roof to wall Lineal meter of gable trim with panel eave closure (charcoal, stone white or prime painted colors-other colors available at an additional charge) Lineal meter of Narrow eave gutter with weatherseal (charcoal,stone white or prime painted colors-other colors available at an additional charge) Narrow downspouts for Narrow eave gutter

Wall System 589 Square meter of wall structurals for a Butlerib? II wall system, pre-galvanized 589 Square meter of Butlerib? II wall panel as follows: - 0.5mmTCT - Clean COLORBOND? XPD Pre-painted steel - Standard colors (Special coating and color need confirm and additional cost) - Un-punched for panel to structural attachment - Utilizing Torx self drilling screw panel to structural fastener - Utilizing Torx self drilling screw panel to panel fastener - Wall panel will not be factory cut for man door, louver or window openings - Man doors, louvers and windows will be field located 589 Square meter of BRII wall Liner panel as follows: - 0.37mm TCT - OPALTM steel - Painted Butler standard stock polyester paint on exposed side - Un-punched for panel to structural attachment - Utilizing Self drilling screw panel to structural fastener - Utilizing Self drilling screw panel to panel fastener - Wall panel will not be factory cut for man door, louver or window openings - Man doors, louvers and windows will be field located 1 Lot of wall insulation as follows: - 75mm thick fiberglass blanket, density 12kg/m3 - FSK facing: Aluminum Foil reinforced Scrim / Kraft paper backing 17 Windows openings as follows: - Support opening with trims and flashings - 2.1mx2.1m - The locations may need to be adjusted a little bit to match panel modules(within +/-300mm) 9 Doors openings as follows: 11

QA FormNo.:310-2 Effective Date: Jul/1/10

Butler PROPOSAL

- 1@1mx2.1m(H)+8@2.1mx2.7m(H) - Support opening with trims and flashings - The locations may need to be adjusted a little bit to match panel modules(within +/-300mm) Other 1 3 1 Lot of hook type anchor bolts for this project, shipped with building Sets of specific erection drawings Formal Design Data (if required)

TOTAL PRICE RMB.00 EXW price with freight to Xu Zhou jobsite

Notes: 1. Butler contract price include 17% VAT, but exclude 3.41% construction tax. 2. Butler contract price exclude general contract management fee and coordination fee 3. This price is based on all the buildings contracts will be signed together 4. The quantity calculation way is fully based Butler’s own internal procedure, if the contract and its attachments shows quantity and unit prices, and in case they are different from data provided by other parties, the total price will not be adjusted by simply times the quantity and unit price. EXCLUSIONS 1. Reinforce steel of existing buildings design, Glass canopy(exclude steel beam) 2. Remove old panel and columns fee 3. General contracts management fee and related taxes, management fee 4. Bidding fee, design approval fee 5. Metal building erection (Please select Butler authorized Butler builder) 6. Construction tax 7. Worker’s salary guarantee fee 8. Project register and approval fee 9. Work benefit insurance guarantee fee 10. Other fee from government related to construction company 11. Finish painting and fire-proof coating 12. Interior partitions, doors and fixtures 13. Roof fans, vents, pipe flashing, curbs, and skylights 14. Wall vents, fans, overhead doors, slide doors, man doors, windows and louvers 15. Leveling plates and or shims 16. High strength bolts site test fee (only provide Code required quantity products for test) 17. Window/ Curtain wall test fee 18. Steel supports/bracing to accept collateral roof loads, except as referenced herein 19. Concrete embed plates, expansion bolts or weld plate of any kind 20. Civil, mechanical and electrical design and materials 21. Miscellaneous steel except as specified herein 22. Construction temporary bracing 23. Design and material for ventilation, water, electric &foundation work 24. Architectural services of any kind 25. Elevators and conveying systems OPTIONS PRICE: 12

QA FormNo.:310-2 Effective Date: Jul/1/10

Butler PROPOSAL

1.To add new wall panel: 10.5 Lineal meter of below eave canopy:(exclude roof beam and purlin) - 1.1m projection - Butlerib? II ZINCALUME ? steel roof panel - With standard gable trims, gutter, downspouts and transition - With BRII soffit 39.6 Lineal meter of below eave canopy:(exclude roof beam and purlin) - 1.5m projection - Butlerib? II ZINCALUME ? steel roof panel - With standard gable trims, gutter, downspouts and transition - With BRII soffit 368 Pieces of MR24? roof Lite*panels as follows: - 600 mm x 3000 mm each(including edge frame) - Double layer - Trims with fixed color (may be different with liner panel, it needs additional price and schedule for other colors) 3299 Square meter of Butlerib? II wall panel as follows: - 0.5mmTCT - Clean COLORBOND? XPD Pre-painted steel - Standard colors (Special coating and color need confirm and additional cost) - Un-punched for panel to structural attachment - Utilizing Torx self drilling screw panel to structural fastener - Utilizing Torx self drilling screw panel to panel fastener - Wall panel will be factory cut for strip window openings - Man doors, louvers and windows will be field located 1 Lot of wall insulation as follows: - 75mm thick fiberglass blanket, density 12kg/m3 - FSK facing: Aluminum Foil reinforced Scrim / Kraft paper backing 42 Windows openings as follows: - Trims and flashings of openings - 1@126.1mx1.5m+1@1.5mx2.7m+36@4.5mx2.7m+ 1@57.7mx1.5m+2@44.5mx1.5m+1@35mx1.5m - The locations may need to be adjusted a little bit to match panel modules(within +/-300mm) 13 Doors openings as follows: - 1@1.5mx2.4m(H)+7@3mx3m(H)+5@1mx2.1m(H) - Trims and flashings of openings - The locations may need to be adjusted a little bit to match panel modules(within +/-300mm) ADD RMB XXX 2.To add new roof panel: Roof System 12920 Square meter of roof structurals (Sub-Purlin) - Pre-galvanized 12380 Square meter of MR-24? roof panel as follows: - Deducted roof Lite*panels area and opening of roof vent - 0.63mm TCT - ZINCALUME ? steel

QA FormNo.:310-2 Effective Date: Jul/1/10

13

Butler PROPOSAL

1

300

456 12 4 136

- Punched for panel to eave and splice attachment - Panel sidelap will be formed to 360o Pittsburgh double lock standing seam - Utilizing high quality movable panel clip for panel to structure attachment - Using sealants at side and end laps Lot of roof insulation as follows: - 50 mm thick fiberglass blanket,12kg/m3 - FSK facing: Aluminum Foil reinforced Scrim / Kraft paper backing Pieces of MR24? roof Lite*panels as follows: - 600 mm x 3000 mm each(including edge frame) - Double layer - Trims with fixed color (may be different with liner panel, it needs additional price and schedule for other colors) Lineal meter of perpendicular transition - roof to wall Lineal meter of parallel transition - roof to wall Ridge to wall transition Lineal meter of gable trim with panel eave closure (charcoal, stone white or prime painted colors-other colors available at an additional charge)

ADD RMB XXX 3.To add new gutter on the grid A&F as follows: 290 Lineal meter of stainless steel multiple gutter including 40collector boxes (Include interior PVC downspouts, only to interior finished floor) ADD RMB XXX 4.To add Oil Storehouse as follows: PROPOSAL REFERENCES: 1. Drawings from First Design & Research Institute, Mi China DRAWING NO. REVISION NO. DATE A346H11-JK070-101,102 1 A346H11-GC070-201~204 2 DESIGN RECURENCE INERVAL Butler will use 50 years recurrence interval for design against load failure BUILDING RELIABILITY LEVEL: 2 MAIN DESIGN BUILDING CODES 7) Technical Specification for Steel Structure of Light –weight Buildings with gabled Frames CECS102:2002 8) Technical Code of Cold-formed Thin-wall Steel Structures GB50018-2002 9) FM DESIGN LOADS Chinese Code
QA FormNo.:310-2 Effective Date: Jul/1/10

DESCRIPTION Architecture Drawing Structure Drawing

14

Butler PROPOSAL

Roof Live Load Roof Reference Snow Load Roof Collateral Load Reference Wind Load Design Seismic Intensity Importance Category: C Roof Dust Load

purlin purlin

0.5kN/m2 0.35kN/m2 0.2kN/m2 0.4kN/m2 , exposure B 7o(0.10g) Group 1 Soil Profile:II No

Note:Full snow loads on all spans are considered in design only. FM Requirement Roof Live Load Wind Speed Snow Load FM Rating: Field Zone Perimeter Zone Corner Zone Deflection Limits Purlin Deflection Girt Sideway Deflection: Relative Humidity No special requirement L/150(No Ceiling) L/100 0.96kN/m2 38m/s(3 second gust wind) 0.35kN/m2 I-75(field) I-120(perimeter zone) I-165(corner zone)

BUILDING DESCRIPTION Width Length Height Building Type Roof Pitch Sidewall Bays Modules Endwall Spacing Roof Condition Wall Condition 10 m (column outer line to column outer line) 24 m (column center line to column center line) 7.45 m Eave Height LRDS 5% 4@6m 10 m 2@5m BRII+75mm WMV-VR Exterior eave gutter Butler wall panel is sitting 1.2 m height Wainscot BRII+75mm FSK Insulation+BRII liner

Structure Scheme Brief Introduction 4) The primary steel is designed by DI. The total steel weight of primary steel is about 6969 kg after our estimation for the structural drawings provided by DI. Butler will be in charge of the fabrication work according to present drawings done by DI, and deliver products to jobsite. In case the final approval drawings have something different from the present ones, Butler will change our lump-sum price accordingly 5) The secondary steel is optimized by Butler MATERIALS SCOPE, INCLUDED
QA FormNo.:310-2 Effective Date: Jul/1/10

15

Butler PROPOSAL

Primary Steel 1 1 Lots of primary steel -Pre- painted with Butler’s standard primer 50?m Lots of bracing -Pre- painted with Butler’s standard primer 50?m -Rod type

Roof System 260 Square meter of roof structurals (Z Purlin) - Continuous span, punched - Pre-galvanized 260 Square meter of Butlerib? II roof panel as follows: (pre-punched) - 0.5mm TCT - ZINCALUME ? steel - Utilizing self drilling screw for panel to structure and panel to panel fastener - Using sealants at side and end laps 1 Lot of roof insulation as follows: - 75mm thick fiberglass blanket,16kg/m3 - WMP-VR facing: polypropylene reinforced with fiberglass & polyester/kraft paper backing 12 Lineal meter of below eave canopy: - 1.2m projection - Butlerib? II ZINCALUME ? steel roof panel - With standard gable trims, gutter, downspouts and transition - With BRII soffit 21 Lineal meter of gable trim with panel eave closure (charcoal, stone white or prime painted colors-other colors available at an additional charge) 50 Lineal meter of Narrow eave gutter with weatherseal (charcoal,stone white or prime painted colors-other colors available at an additional charge) 6 Narrow downspouts for Narrow eave gutter Wall System 443 Square meter of wall structurals for a Butlerib? II wall system, pre-galvanized 443 Square meter of Butlerib? II wall panel as follows: - 0.5mmTCT - Clean COLORBOND? XPD Pre-painted steel - Standard colors (Special coating and color need confirm and additional cost) - Un-punched for panel to structural attachment - Utilizing Torx self drilling screw panel to structural fastener - Utilizing Torx self drilling screw panel to panel fastener - Wall panel will not be factory cut for man door, louver or window openings - Man doors, louvers and windows will be field located 443 Square meter of BRII wall Liner panel as follows: - 0.37mm TCT - OPALTM steel - Painted Butler standard stock polyester paint on exposed side - Un-punched for panel to structural attachment - Utilizing Self drilling screw panel to structural fastener
QA FormNo.:310-2 Effective Date: Jul/1/10

16

Butler PROPOSAL

1 14

2

14

- Utilizing Self drilling screw panel to panel fastener - Wall panel will not be factory cut for man door, louver or window openings - Man doors, louvers and windows will be field located Lot of wall insulation as follows: - 75mm thick fiberglass blanket, density 12kg/m3 - FSK facing: Aluminum Foil reinforced Scrim / Kraft paper backing Windows openings as follows: - Support opening with trims and flashings - 6@3.6mx2.4m+6@3.6mx0.75m+2@3mx0.75m - The locations may need to be adjusted a little bit to match panel modules(within +/-300mm) Doors openings as follows: - 3.0mx3.0m(H) - Support opening with trims and flashings - The locations may need to be adjusted a little bit to match panel modules(within +/-300mm) Wall openings as follows: - Dia 0.435m - Support opening with trims and flashings - The locations may need to be adjusted a little bit to match panel modules(within +/-300mm) Lot of hook type anchor bolts for this project, shipped with building Sets of specific erection drawings Formal Design Data (if required)

Other 1 3 1

ADD RMB XXX Erection Reference Quotation: Above Butler material (Erection Contract should be signed independently by Erector and owner) should be erected by Butler Certified Steel Building Erector. And Erector will supply following miscellaneous material: 1) Expansion Bolts. 2) … On the following condition: 1.) Jobsite has following construction condition: A. Has Steel Structure Material Pile Ground which earth is strong and meet size requirement. B. Has temporary warehouse for important parts (20 square meters) C. Jobsite ground and roads, which is near and inside jobsite meet the requirement that transport material and hanging load (50-ton truck and 50-ton crane can drive smoothly and do not stall) D. Jobsite can access water and electricity interface and can meet requirement during construction. 2.) Construction scheme according to the scheme that described in bidding document, particularly on the condition of A. Inside-building installation and outside-building installation can be done at same time; B.…. 3.) Delay caused by weather or other parties is totally less than 7 days. Steel Building Erection Price is: ¥ on erection) (including construction erection sales tax based

QA FormNo.:310-2 Effective Date: Jul/1/10

17

Butler PROPOSAL

Note: 1. Above Erection Fee is not including Erection Fee which out of Buter Material List. 2. Above Erection Fee is not including General Contractor Management Fee, Project Declare Fee and Quality Check Fee. 3. Above Each Erection Finish Joint can be defined that jobsite material for related section all installed and touch up jobs do not infect following construction). That is not including temporary unfinished erection based on whole-project schedule request from the client or general contractor or temporal work. GENERAL NOTES 1. Butler's proposal pertains only to the pre-engineered metal building materials (sometimes referred to as "products") specified herein. Other materials and services are not included unless specifically indicated otherwise. All pre-engineered metal building materials shall be designed and detailed in accordance with owner’s technical requirements, current China Codes (or US code if required and specified by customer in advance) & Butler 's standard design and manufacturing practices. Butler accepts no liability for failure to comply with codes of any other country. Butler approval drawings shall consist of anchor bolt layouts and reactions, floor plan layout, typical frame cross sections, beam sizes, and related design calculations. In case of any change or modification, Butler may revise the price accordingly. 2. Butler is responsible for the design of the anchor bolt diameter, location and projection of all anchor bolts for the metal building portion of the project. Butler will furnish an anchor bolt layout drawing(s) including bolt diameter, projection, location, and spacing of all structural anchor bolts and the magnitude and direction of column reactions. It is the responsibility of buyer or its design institute, civil contractor to ensure that adequate provisions are made for specifying bolt embedment, bearing angles, tie rods and other associated items embedded in the concrete foundation as well as the foundation design. 3. The end user or its installation company is responsible for the necessary equipment and manpower to unload these containers at the port or job site. 4. Some secondary structural field work may be required on this project. Typically overhead door structurals, door side girts and corner girts will require field modification. Other minor field modifications will be defined on the erection drawings when required. 5. Some special requirements from Buyer, like insulation thickness enough or not, relative humidity or condensation problems, etc, Buyer should consult design institute or other agencies for these issues. 6. There is a possibility of condensation caused by litepanel, so please consider the equipment and production conditions when you decide to use litepanel VALIDITY 1. This proposal will be valid for 15 days only 2. Butler assumes shipment of all materials within 4 months from the date of this proposal 18

QA FormNo.:310-2 Effective Date: Jul/1/10

Butler PROPOSAL

3. Any variance from these 2 issues shall be talked w/ Butler PAYMENT TERMS Payment by the Buyer shall be made as follows: The terms of payment shall be mutually agreed to in writing by parties in advance of Butler’s acceptance of Buyer’s purchase order. Payment to be made in RMB. Buyer’s payment to Butler shall be made by one or more of the following methods: 1. A cash payment in the amount of one hundred percent (100%) of the total purchase order amount inclusive of all applicable taxes at the time of Butler’s acceptance of the purchase order: or. 2. A cash down payment in the amount of twenty-five percent (25%) of the estimated total value of the purchase order upon Butler’s commencement of design work: thereafter, a cash payment in the amount of fifty percent (50%) of the total purchase order amount received by Butler five (5) business days in advance of Butler’s scheduled manufacturing date: and thereafter, a cash payment in the full amount of the unpaid balance of the total purchase order amount received by Butler five (5) business days in advance of Butler’s scheduled shipment date DELIVERY SCHEDULE Materials will be ready to start shipment from our factory in approximately 10-12 weeks after Butler receiving this signed proposal and first payment. Our pricing assumes delivery of all materials will occur within 4 months from the date of this proposal. Anchor bolt layout drawing and building reactions will be provided approximately 1 weeks after Butler’s receipt Buyer's order. Butler will submit Buyer or its design institute the drawings and documents for final approval if required. In order to guarantee the schedule, please respond as soon as possible. Butler will resume the design work for the shop & erection drawings after receiving confirmation from the Buyer. Thank you for this opportunity. Please advise if I may be of further assistance to you on this project. Respectfully Submitted, xxx Estimating Engineer Butler cc. XXXXXX Date:

Checked By:

QA FormNo.:310-2 Effective Date: Jul/1/10

19

Butler PROPOSAL

Reviewed By:

Date:

QA FormNo.:310-2 Effective Date: Jul/1/10

20

Butler PROPOSAL

Attachment A BUYER ACTION ITEMS The following information is required prior to the Engineering start date or one week after order entry whichever is sooner. 1) 2) 3) 4) 5.) 6.) 7.) 8) 9) Are there any sidewall bays that will not allow wall bracing? Please locate any and all roof top units? Also include size (dimensions and weight). Please include any clear height and/or width requirements. Please locate all roof and wall accessories. Confirm crane loads, type and clearances. Confirm mezzanine layout and clear heights. Locate all framed openings. All columns are proposed bearing on finish floor. If this is not the case locate actual bearing location of base of columns. (If other than finish floor an adjustment to the proposal price may be required.) Confirm Butler structure line –at girt out flange Confirm wainscot details

11) Indicate the indoor relative humidity and temperature 12) Confirm collateral load is per the owner’s requirement 13) Confirm mezzanine live load and decoration load The following information is required prior to the Detailing start date or two weeks after order entry whichever is sooner. 1.) 2.) 3.) 4.) 6.) 7.) Confirm the roof panel color. Confirm the wall panel color. Confirm the edge of roof trim color. Confirm the downspout color. If non-BSI supplied insulation, confirm thickness. Confirm Lite*Panl locations.

Please advise us of the items listed above by the noted dates. Failure to do so may result in the delay of the shipment of your materials.

QA FormNo.:310-2 Effective Date: Jul/1/10

21

Butler PROPOSAL

Standard Material Color List
Roof Panel Zinculume Wall panel/ Liner XRW Off White China Stone White Cobble White Torres Blue Gull Grey Flashings & Trims XRW Off White China Stone White Cobble White Torres Blue Gull Grey Homestead(non-stock) XPD China Birch White China Colonial White Charcoal Strait Blue(non-stock) Tindal Grey(non-stock) XPD China Birch White China Colonial White Coral White OPAL China Ivory China White Grey AURORA(nonstock) Jasmine White Sand White White Island

Note: All non-standard colors beyond above listed may cause longer leadtime or extra cost, please talk with Butler for details.

QA FormNo.:310-2 Effective Date: Jul/1/10

22


相关文章:
Proposal巴特勒-英文(2011.8.24)2
Proposal巴特勒-英文(2011.8.24)2_英语_高中教育_教育专区。敬请大家翻译 Butler PROPOSAL Dedicated to Customer Success through Excellence. Butler (Shanghai) Inc...
英语二2011年真题及答案
8页 免费英​语​2​0​1​1​...2011 年全国硕士研究生入学统一考试英语(二)试题 Section...The French proposal of handling the crisis implie...
2011年高考英语真题全国II卷试题精讲(含答案和每道题目详细解释)
8. If you ___ smoke, please go outside. A....24. 本题考查动词及篇章理解。根据上题解析,此人...2011年高考英语真题四川...1/2 相关文档推荐 ...
2011年英语二真题答案及解析
proposal 5.A.information B. interference C. ...perform worse in lawsuits 24. It can be ...1/2 相关文档推荐 2011考研英语二真题及答... 14...
2011《大学英语二》第一次作业
中国石油2013年春大学英语... 暂无评价 8页 2财富值喜欢此文档的还喜欢 ...23. She's the professor? [23]___! 24. My roommate is into computers...
2011-2012八年级英语上册期中考试试题及答案
2011-2012八年级英语上册期中考试试题及答案_专业资料...The company was founded(建立) in 1853 by 24-...football m___ at 2:00pm at our school. ...
2011年考研英语(二)真题及答案解析
2011年考研英语二真题答案... 3页 2财富值 2011年...[A]linked 8.[A]dismiss 9.[A]recall 10.[A]...[D] proposal [D] equivalent [D] over [D] ...
2011年全国天天向上第十六期判断推理题目2(7.18-7.24)-资源共享中心110715C1.0
7. 中公教育内部资料 翻版必究 第 1 页共 2 页 辽宁中公教育:http://ln.offcn.com 8.陶瓷:器皿 ( ) A.钛丝纤维:羽毛球拍 B.塑料:杯子 C.耀斑:太阳 ...
湖北省“9+4”联合体2011年高二下学期期中联考(英语)缺答案
2011年高二下学期期中联考(英语)缺答案_英语_高中...C. In Room 24-402. 2. What does the woman ...___, the proposal put forward at the conference...
更多相关标签:
英文proposal范文 | proposal 英文 | 英文proposal格式 | 巴特勒 | 吉米巴特勒 | 奥斯汀.巴特勒 | 杰拉德.巴特勒 | 巴特勒是乔丹私生子 |