当前位置:首页 >> 能源/化工 >>

Baker Hughes oiltools- PSI completion


Baker Oil Tools Well Completion

Subsoil Conference,
Esbjerg 6. February, 2007
by Trond Rese Baker Oil Tools, Scandinavia

? 2007 Baker Hughes Incorporated All r

ights reserved.

Content

Completion - Definition Basic well completion sequence Pertinent completion concepts PSI completion Basic completion principles Completion elements Advanced completion technology

? 2007 Baker Hughes Incorporated All rights reserved.

The Purpose of the Completion
The well completion is the installation that enables production of fluids in a safe and efficient manner.

Ideally, the lowest cost completion (considering both initial and operating costs) that meets the demands placed upon it for the well life.

? 2007 Baker Hughes Incorporated All rights reserved.

Reservoir Management Tool
The choice of completion concept is dictated by:
The reservoir model and operator’s drainage strategy.
– – – – – – – – – – – – – – – – – Horizontal wells Single zone/multiple zone Co-mingled production/flow control Pressure maintenance
TY TY LIY LIY T BIIT L L EA I MAB ER E PRM RM PE

Reservoir properties.
Open hole/Cased hole completion Sand control measures Stimulation Artificial lift Completion metallurgy Elastomer qualities Deposits/Scale Chemical injection Expandable tubulars Future well interventions Well trajectory Intelligent Wells Multilateral wells

POROSITY CEMENT Sw So

The physical and chemical qualities of theROCK fluids.
GRAIN

Production Packer w/ feed through

HCM Sleeve P/T gauge Schrouded HCM Sleeve

Other development considerations.

ZXP Liner Hanger and Packer w/ PBR

ZXP Liner Hanger and Packer w/ PBR Hydrasplit w/ 4 1/2" on lateral leg and 7" on main leg Seal Bore Diverter

Production Anchor w/PBR seal assembly MLZX Liner Hanger and Packer w/ PBR

? 2007 Baker Hughes Incorporated All rights reserved.

Basic Sequences of a Well Completion
Drilling operation
Drill 30” – 36” pilot hole Set 30 “ conductor Drill 26” surface hole Install 20” surface casing Drill 17 ?” intermediate hole Install 13 3/8” intermediate casing Drill 12 ?” hole to top of the reservoir Install 9 5/8” casing Drill 8 ?” hole to TD

Start of the Completion Operation
Run & hang off liner Cement liner Set liner hanger packer Install production tubing Set production packer N/D BOP N/U X-mas tree Perforate Stimulate Produce
? 2007 Baker Hughes Incorporated All rights reserved.

Completion Concepts
Multiple zone completion
Production packers set in the liner Top packer need to be V0 rated Selective zone production

Reservoir

Reservoir

? 2007 Baker Hughes Incorporated All rights reserved.

Completion Concepts
Multiple zone completion
Dual string Top packer need to be V0 rated Selective zone production

Reservoir

Reservoir

? 2007 Baker Hughes Incorporated All rights reserved.

Completion Concepts
Multiple zone completion
Production packers set above the liner Isolation packer between the zones Selective zone production

Reservoir

Reservoir

Reservoir

? 2007 Baker Hughes Incorporated All rights reserved.

Perforate, Stimulate & Isolate (PSI)
Horizontal Completion

Side-Mounted Guns with Firing Head

“K-3” Hold Down

Retrievable ISO Packer

Production Tubing

Locator Tubing Seal Assembly

Work String

Ball Seat

ISO Packer Running Tool

“CM” Sliding Sleeve

Concentric Work String

Guns Work String Liner

? 2007 Baker Hughes Incorporated All rights reserved.

PSI Completion Process

RIH and set Sump Packer

? 2007 Baker Hughes Incorporated All rights reserved.

PSI Completion Process

POOH Position guns and perforate

? 2007 Baker Hughes Incorporated All rights reserved.

PSI Completion Process

Clean out excess Set with isolation assembly RIH anchor and stimulate

? 2007 Baker Hughes Incorporated All rights reserved.

PSI Completion Process

Stab into sump packer

? 2007 Baker Hughes Incorporated All rights reserved.

PSI Completion Process

POOH Position guns and perforate Set ISO Packer

? 2007 Baker Hughes Incorporated All rights reserved.

PSI Completion Process

Clean out excess Set with new isolation assembly RIH anchor and stimulate

? 2007 Baker Hughes Incorporated All rights reserved.

PSI Completion Process

Stab into packer

? 2007 Baker Hughes Incorporated All rights reserved.

PSI Completion Process

Set Packer Repeat process until all Position guns and perforate zones are new zone completed

? 2007 Baker Hughes Incorporated All rights reserved.

PSI Horizontal Completion
Perforate stimulate and isolate in one trip Developed for multiple-zone hydraulic fracs Single-string selective cemented completion Completions – 3.500+ zones isolated to date

Locator Tubing Seal Assembly 9-5/8” or 10 3/4“ “Neo” Packer Millout Extension

Liner Hanger Retrievable ISO-Packer Locator Tubing Seal Assembly

Liner Tubing “CM” Sliding Sleeve (closed) Sump Packer

? 2007 Baker Hughes Incorporated All rights reserved.

Well Completion Scematic
Upper Completion
(Well Control)

Lower Completion
(Production Control)
Cased Hole Completion Open Hole Completion

? 2007 Baker Hughes Incorporated All rights reserved.

Well Completion Scematic
EXCLUDER 2000

Schroud

Membrane Wire wrap

Base pipe

Screen
? 2007 Baker Hughes Incorporated All rights reserved.

Well Completion Scematic
PBR Packing element

Liner hanger slips

Liner Hanger
? 2007 Baker Hughes Incorporated All rights reserved.

Well Completion Scematic
Inner Flow Ports Outer Flow Ports Inner Sleeve

Sliding Sleeve

? 2007 Baker Hughes Incorporated All rights reserved.

Well Completion Scematic
Inner Sleeve Outer Flow Ports Inner Flow Ports Shroud Plug Flow Ports

Shrouded Sliding Sleeve

? 2007 Baker Hughes Incorporated All rights reserved.

Well Completion Scematic
Slips (cast iron) Packing element Slips (cast iron)

Production Packer

? 2007 Baker Hughes Incorporated All rights reserved.

Well Completion Scematic
Maine bore
Orienting sleeve

Tool guards

Side pocket w/flow ports

Side Pocket Mandrel

? 2007 Baker Hughes Incorporated All rights reserved.

Well Completion Scematic
Gaslift Gas Completion fluid

Side Pocket Mandrel

? 2007 Baker Hughes Incorporated All rights reserved.

Well Completion Scematic
Safety Systems

DHSV

CASV

FLX-4

PCT

? 2007 Baker Hughes Incorporated All rights reserved.

The Intelligent Well System
Wellhead /Tubing Hanger penetrates and feedthroughs Data Acquisition System Bumper Wire Termination Subs Safety Valve

Control Panel

Other Completion Components (Gauge Mandrel, Side Pocket Mandrels, Expansion Joint, Wet Disconnects, etc.)

Production Packer

Permanent Monitoring Isolation Packer Splice Sub and Connectors

Hydraulic/Electric Sleeve Mechanical Sleeve Seating Nipple or Bull Plug

Cable Protection Systems (Clamps)

Hydraulic/Electric Conduit

Tubing Fiber or Electric Conduit

? 2007 Baker Hughes Incorporated All rights reserved.

The Intelligent Well System
Basic Elements
Hydraulic Control Lines, Chemical Injection Lines and Communication Lines Permanent Sensors for Pressure, Temperature and Flow Production and Isolation Packer with by-pass feature

Remote Control Flow Regulators

? 2007 Baker Hughes Incorporated All rights reserved.

Multilateral Wells

MULTILATERAL

? 2007 Baker Hughes Incorporated All rights reserved.

ML – TAML Code
(Technology Advancement – Multilateral)

LEVEL 6 LEVEL 1 4 LEVEL 5 3 LEVEL LEVEL LEVEL 2

Cased and Open Cased integrity Pressure and cemented Cased and Cased and cemented unsupported at cemented main bore thecemented junction main main bore & lateral. junction bore and lateral achieved with main bore Pressure isolation at the junction achieved casing the with completion

Lateral cased Open hole, but or unsupported liner not cemented

in lateral

? 2007 Baker Hughes Incorporated All rights reserved.

Multilateral Systems
Level 6
– FORMation Junction

Level 5
– FORM 5 Junction – HydraSplit HP Junction 1 – RAM Hanger (3 or 5) 2

Level 3-4
– HOOK Hanger System
1 Under development (Qtr 1-08) 2 Under development (Qtr 1 – 07)

? 2007 Baker Hughes Incorporated All rights reserved.

Expandable Tubulars
8-1/2" Open Hole 6-7/8" EXPress Screen

? 2007 Baker Hughes Incorporated All rights reserved.

Expansion Video

? 2007 Baker Hughes Incorporated All rights reserved.

linEXX Video

? 2007 Baker Hughes Incorporated All rights reserved.

Reducing Annular Space,
Increasing ID
Large annular flow due to greater resistance to flow in the pipe than the annulus

No annulus, no annular flow

? 2007 Baker Hughes Incorporated All rights reserved.

Well Construction Evolution
Traditional
Expandable technology

Monobore

Reduced consumption
Drilling Fluids 60% reduction Casing 60% reduction Cement 75% reduction Reduced environmental impact Cuttings 60% reduction Less consumption means less transport

Current

Reduced drilling risk Smaller rig/vessel

Future
? 2007 Baker Hughes Incorporated All rights reserved.

Summary
● Lower Completion
– Cased hole completion – Open Hole Completion – Zone Isolation/Control

● Upper Completion
– Safety systems – Artificial Lift – Packer Systems – Flow Control

● Advanced Completion Systems
– Multilateral Well Completion – Intelligent Well Systems – Expandable Metal Systems

? 2007 Baker Hughes Incorporated All rights reserved.

Baker Oil Tools Thank you for your attention.

? 2007 Baker Hughes Incorporated All rights reserved.


相关文章:
Baker Hughes风扇C88424
提供安全、 高效的解决方案处理高温、 腐蚀性强和/液体,压力可以达到 10000psi.... 水处理 二次开采 乙二醇脱水 胺净化 化工原料注射 原油输送 Baker Hughes C8...
在深水钻井中关于气涌的数学模型
Baker Hughes oiltools- P... 39页 免费 斯伦贝谢水平井随钻测井地... 24...参数 米制单位 现场单位 450psi 参数 泥浆液面 米制单位 6.36m3 现场单位 ...
斯伦贝谢的油田方案
About Baker Hughes Baker Hughes creates value for Oil & Gas companies by offering leading drilling, formation evaluation, completion and production products ...
RCV valve_eng
? 4/12/10 Baker Hughes Incorporated. TECHNICAL ...Baker Oil Tools RCV? valve is designed with ...2" 2.312" 2.312" 3.437" 5,000 psi 135...
智能完井综述
在 90 年代后期,bakerhughes、schlumberger、ABB 和 ...1997 年 BakeroilTools 和 schlumberger 公司联合开发...New generation intelligent completion system ...
页岩气完井技术现状开题报告
Schlumberger、Baker-Hughes、BJ 等公司技术趋于 成熟...智能完井系统(Intelligent Completion System)是近年来...Baker Oil Tools 公司有几种智能完井工具和系统。 ...
石油钻井网站
石油钻井网站_工学_高等教育_教育专区。石油钻井网站 石油钻井网站 Baker Hughes - Baker Oil Tools Double E, Inc. - Standard and Custom-Engineered - Manuf...
7 英寸HP型安全阀定位接头81988-- 7 HP nipple
Baker Hughes 公司未出版商业机密,版权所有,有限发行... 通信地址:Customer Service Baker Oil Tools 3000N...安装完毕。 技术数据尺寸 固定型号 工作压力(PSI) ...
ZD-C39(HP)施工情况
生产厂家为 BAKER-HUGHES,水眼尺 寸为:16,20,20...(Navi 1 Trak)Tool 8.14 8.25 2.875 6.625 ...PRESS=2000PSI TORQUE=8500(MAX), 钻进参数 泥浆...
世界十大油服公司
Baker Hughes 6. Fluor 7. Weatherford International... production and intervention cycles of oil and ... completion tools, completion fluids, casing and ...
更多相关标签:
baker hughes | baker hughes 中国 | ge baker hughes | bakerhughes | baker hughes中国北京 | baker hughes china | tom hughes | ted hughes |