2.吊装作业许可证


Project Management & Development Co. Ltd. Al-Jubail, Saudi Arabia

Saudi Kayan Petrochemical Complex Rev. 0 Page 1 of 1
Date 日期 Crane Model 吊车型号 Boom Length 吊臂长度(米) Jib Len

gth 副臂长度(米) Maximum Radius of Lift 本次作业中的最大工作半径(米) Crane Capacity at Maximum Radius 在本次作业最大工作半径时的吊车 起吊性能(吨) C

CRANE LIFT PERMIT 吊装许可证
Contractor 承包商 Description of Load 吊物描述 Weight of Load 吊物重量 A Weight of Rigging and Crane Block 索具和滑轮组重量(吨) B Total Erection Load 总吊装重量(吨)(A+B) ( ) Percent Crane Capacity at Maximum Lift Radius 本次作业最大工作半径时所占吊车性能百分比 (A+B)/ C ) Non-Engineered Lift 非专业方案吊装 Engineered Lift 专业方案吊装

Attach supporting Rigging Study, Drawings and Lift Plan for all Type ‘B’ and Type ‘C’ Engineered Lifts. 对于 B 类和 C 类专业吊装须附上图纸和方案。 Spreader 平衡梁 Tailing Hook-Up 溜尾吊环

RIGGING GEAR REQUIRED – SIZE AND CAPACITY 所需的索具系统 所需的索具系统
Shackles 卸扣 Slings 吊带 1. 3. 5. 7.

LOAD AND LIFTING LUG 吊物和吊耳 吊物和吊耳 Has the weight of the load been documented or accurately calculated? 2. Are all items that will be lifted with the equipment included in the 吊物重量精确计算过了吗? weight? 所有起吊的设备重量都计算进去了吗? Have the lifting lugs that will be used to lift the load been designed for 4. Will the lifting lugs be used with the correct shackle? that purpose? 吊耳用于此吊物合适吗? 吊耳与卸扣搭配吗? Will the lifting lugs be loaded only in the strong direction(s) of the lug? 是在正确受力的方向使用吊耳的吗? 6. Are the lifting lugs visibly free of defects or damage? 确定吊耳没有外观缺陷或损坏吗?

Has the load been checked for loose or unsecured items, which might 8. For a one-crane lift will the crane hook be over the center of gravity at fall off during the lift? the initial pick? 吊物是否经过详尽的检查并确保吊装过程中不会出现松动而坠落? 对于单吊车作业,吊钩是在吊物重心的正上方吗? RIGGING GEAR 索具 9. Have the capacities of the slings and shackles been checked for the 10. Have the slings and shackles been visually inspected for defects or load?吊带和卸扣性能是否经过检查并适合吊物? damage? 吊带和卸扣是否经过检查并确保没有缺陷或者损坏? 11. Have the sling angles been considered when checking the capacity of 12. Has the center of gravity been considered when checking the capacities the slings and shackles? of the sling and shackles? 在检查吊带和卸扣性能时考虑吊带角度了吗? 在检查吊带和卸扣性能时考虑吊物重心了吗? 13. For a crane that has a load-indicating device with overload cut-off, is the total load less than 90% of the allowable crane capacity? 对于安装了吊装指示器和过载保护装置的吊车,吊物总重量是否小 于容许值的 90%? Has the crane received a daily inspection and operational check by the operator? 吊车司机执行日常检查了吗? Is the crane supported by approved crane mats? 吊车使用了标准的支腿底座了吗? Has the soil been inspected and determined to be adequate? 沙土是否已被检查过并确保合适? CRANE 吊车 14. For a crane that does NOT have a load indicating device with overload cut-off, is the total load less than 80% of the allowable crane capacity? 对于未安装吊装指示器和过载保护装置的吊车,吊物总重量是否小 于容许值的 80%? 16. 18. Is the crane set up according to the manufacturer’s specifications? 吊车的设置是否是按照厂家规范进行的? If the lift involves more than one crane, can it be made without any possibility of one of the cranes being overloaded? 如果使用两台以上吊车进行吊装,是不是排除了其中一台会发生过 载的情况?

15.

17. 19.

Has the radius of the lift been checked by a tape measure? 吊装半径用卷尺量过了吗? 22. Has the area under the lift been barricaded or everyone warned to stay away? 吊装区域做好围护了吗? 24. If there is a possibility for boom or equipment interference, has a rigging layout or clearance study been made? 如果吊臂会受到设备的干扰,是否做出了设计图或清障处理? NOTE 重要信息 重要信息!

20.

LIFT 吊装 21. Is the lift area free of operating process equipment, piping, or live electrical lines? 吊装区域的工艺设备、管线或电缆清理了吗? 23. Is the wind less than 20 miles per hour? 风速是否小于 32 公里/小时(20 英里/小时)? 25. Has one person been designated “Signalman-in-Charge” for the lift? 是否为本次吊装指定了信号工?

1. All questions should be answered yes, no, or N/A (not applicable). 以上所有问题必须用 Yes(是),No(否)或 N/A (不适用于本次吊装)。 2. The Rigging Superintendent must approve any checklist item answered by “no”. 起重主管必须核查回答为 No 的款项。

________________________________________ Rigging Superintendent 起重主管 Date 日期: ________________________

_________________________________________ Field Rigger Responsible for Lift 起重工 Date 日期: _________________________

69157015.doc


相关文章:
吊装作业工作许可证
吊装作业许可证编号:QLSGG AQ-070 编号 所属单位 作业内容 起重工 受影响相关方 作业时间 风险分析 1 2 3 4 5 6 7 8 9 10 11 未检查使用安全合格的...
吊装作业许可证
2吊装作业许可证一式两份,一份留存安环办备案,一份由作业人持有,作业时随身携带, 作业完毕后由填写部门进行留存。 保存期限:2 年 保存部门:安环办/填写部门...
吊装作业许可证
吊装作业许可证_建筑/土木_工程科技_专业资料。XXX 有限公司 吊装作业许可证 BXRE-012-054 需吊装 部门 吊装工具 负责吊 装单位 作业时间 序号 1 2 3 4 5 ...
吊装作业许可证
Limited 文件编号:RF-HSE-05/0A 实施日期:2011-6-2 吊装作业许可证施工单位: 许可证编号: 第 1 联(白色)吊装指挥 警告:只用在落实各项安全措施和各项准备...
吊装作业许可安全管理制度
操作人员应遵守的规定、作业完毕作业人员应做的工作和《吊装 作业安全许可证》的...4.3 三级吊装作业,指吊装重物的质量在 2-10 吨的作业。 5 吊装作业的分类 1...
起重吊装作业许可证
起重吊装作业许可证申请单位 : 作业内容(包括规格、重量) : 吊装指挥: 作业时间:从 序号 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 年月日时 分...
002-吊装作业许可证
吊装作业许可证 编号 业务归口 部门 作业机具 及作业内 容 作业人员 姓名 ...作业人员身体条件符合要求 2 作业机械、索具符合起吊作业相关要求 3 作业人员持...
吊装作业许可证
吊装作业许可证作业证编号 作业地点及 内容 施工单位 吊装工具 作业人员: 作业时间: 序号 1 2 3 4 5 6 7 其他补充措施: 年月日时 所属单位 吊装重量 指挥...
起重吊装作业许可证_图文
起重吊装作业许可证_调查/报告_表格/模板_实用文档。起重吊装作业许可证编号: ...名称 监护人 起吊重物质量(t) 年月日时 分至 年月日时分 自 确认人 2. ...
3、吊装作业许可证
吊装作业安全许可证 22财富值如要投诉违规内容,请到百度文库投诉中心;如要提出功能问题或意见建议,请点击此处进行反馈。 3、吊装作业许可证 隐藏>> 吊装作业许...
更多相关标签: