当前位置:首页 >> 建筑/土木 >>

2.吊装作业许可证


Project Management & Development Co. Ltd. Al-Jubail, Saudi Arabia

Saudi Kayan Petrochemical Complex Rev. 0 Page 1 of 1
Date 日期 Crane Model 吊车型号 Boom Length 吊臂长度(米) Jib Len

gth 副臂长度(米) Maximum Radius of Lift 本次作业中的最大工作半径(米) Crane Capacity at Maximum Radius 在本次作业最大工作半径时的吊车 起吊性能(吨) C

CRANE LIFT PERMIT 吊装许可证
Contractor 承包商 Description of Load 吊物描述 Weight of Load 吊物重量 A Weight of Rigging and Crane Block 索具和滑轮组重量(吨) B Total Erection Load 总吊装重量(吨)(A+B) ( ) Percent Crane Capacity at Maximum Lift Radius 本次作业最大工作半径时所占吊车性能百分比 (A+B)/ C ) Non-Engineered Lift 非专业方案吊装 Engineered Lift 专业方案吊装

Attach supporting Rigging Study, Drawings and Lift Plan for all Type ‘B’ and Type ‘C’ Engineered Lifts. 对于 B 类和 C 类专业吊装须附上图纸和方案。 Spreader 平衡梁 Tailing Hook-Up 溜尾吊环

RIGGING GEAR REQUIRED – SIZE AND CAPACITY 所需的索具系统 所需的索具系统
Shackles 卸扣 Slings 吊带 1. 3. 5. 7.

LOAD AND LIFTING LUG 吊物和吊耳 吊物和吊耳 Has the weight of the load been documented or accurately calculated? 2. Are all items that will be lifted with the equipment included in the 吊物重量精确计算过了吗? weight? 所有起吊的设备重量都计算进去了吗? Have the lifting lugs that will be used to lift the load been designed for 4. Will the lifting lugs be used with the correct shackle? that purpose? 吊耳用于此吊物合适吗? 吊耳与卸扣搭配吗? Will the lifting lugs be loaded only in the strong direction(s) of the lug? 是在正确受力的方向使用吊耳的吗? 6. Are the lifting lugs visibly free of defects or damage? 确定吊耳没有外观缺陷或损坏吗?

Has the load been checked for loose or unsecured items, which might 8. For a one-crane lift will the crane hook be over the center of gravity at fall off during the lift? the initial pick? 吊物是否经过详尽的检查并确保吊装过程中不会出现松动而坠落? 对于单吊车作业,吊钩是在吊物重心的正上方吗? RIGGING GEAR 索具 9. Have the capacities of the slings and shackles been checked for the 10. Have the slings and shackles been visually inspected for defects or load?吊带和卸扣性能是否经过检查并适合吊物? damage? 吊带和卸扣是否经过检查并确保没有缺陷或者损坏? 11. Have the sling angles been considered when checking the capacity of 12. Has the center of gravity been considered when checking the capacities the slings and shackles? of the sling and shackles? 在检查吊带和卸扣性能时考虑吊带角度了吗? 在检查吊带和卸扣性能时考虑吊物重心了吗? 13. For a crane that has a load-indicating device with overload cut-off, is the total load less than 90% of the allowable crane capacity? 对于安装了吊装指示器和过载保护装置的吊车,吊物总重量是否小 于容许值的 90%? Has the crane received a daily inspection and operational check by the operator? 吊车司机执行日常检查了吗? Is the crane supported by approved crane mats? 吊车使用了标准的支腿底座了吗? Has the soil been inspected and determined to be adequate? 沙土是否已被检查过并确保合适? CRANE 吊车 14. For a crane that does NOT have a load indicating device with overload cut-off, is the total load less than 80% of the allowable crane capacity? 对于未安装吊装指示器和过载保护装置的吊车,吊物总重量是否小 于容许值的 80%? 16. 18. Is the crane set up according to the manufacturer’s specifications? 吊车的设置是否是按照厂家规范进行的? If the lift involves more than one crane, can it be made without any possibility of one of the cranes being overloaded? 如果使用两台以上吊车进行吊装,是不是排除了其中一台会发生过 载的情况?

15.

17. 19.

Has the radius of the lift been checked by a tape measure? 吊装半径用卷尺量过了吗? 22. Has the area under the lift been barricaded or everyone warned to stay away? 吊装区域做好围护了吗? 24. If there is a possibility for boom or equipment interference, has a rigging layout or clearance study been made? 如果吊臂会受到设备的干扰,是否做出了设计图或清障处理? NOTE 重要信息 重要信息!

20.

LIFT 吊装 21. Is the lift area free of operating process equipment, piping, or live electrical lines? 吊装区域的工艺设备、管线或电缆清理了吗? 23. Is the wind less than 20 miles per hour? 风速是否小于 32 公里/小时(20 英里/小时)? 25. Has one person been designated “Signalman-in-Charge” for the lift? 是否为本次吊装指定了信号工?

1. All questions should be answered yes, no, or N/A (not applicable). 以上所有问题必须用 Yes(是),No(否)或 N/A (不适用于本次吊装)。 2. The Rigging Superintendent must approve any checklist item answered by “no”. 起重主管必须核查回答为 No 的款项。

________________________________________ Rigging Superintendent 起重主管 Date 日期: ________________________

_________________________________________ Field Rigger Responsible for Lift 起重工 Date 日期: _________________________

69157015.doc


相关文章:
起重吊装作业安全许可管理制度
4.2 分(子)公司安全管理部门职责 (1)确认作业前安全准备情况,审核《吊装作业安全许可证》 ;(2)监督、检查作业现场,发现违章及时制止,发现不符合项 督促作业单位...
吊装作业许可证
***公司 吊装作业许可证 吊装作业许可证申请日期: 申 申请单位 请 填表人(本...9、其他注意事项:___ 许可 2、 承包商现场安全负责人签名: (不得离开现场) ...
吊装作业许可证
2吊装作业许可证一式两份,一份留存安环办备案,一份由作业人持有,作业时随身携带, 作业完毕后由填写部门进行留存。 保存期限:2 年 保存部门:安环办/填写部门...
吊装作业安全管理标准
4.2.2 起重机操作员的资格要求: 1)通过有资质的医院对操作员进行年度体检,...5 吊装作业许可证(见附录 A) 5.1 以下情况需要办理吊装作业许可证: 1)在...
吊装作业审批制度
2. 《吊装作业许可证》批准后,项目单位负责人应将《吊装作业许可证》 交吊装指挥人员及作业人员检查《吊装作业许可证》无误后方可作业。 3. 《吊装作业许可证》...
吊装作业管理制度
5 吊装作业许可 5.1 吊装负责人在专职安全管理员处领取《吊装作业许可证》后填写相关内容,交作业单位 负责人批准。 5.2吊装作业许可证》批准后,吊装负责人应...
吊装作业管理制度
4.4 作业人员职责 4.4.1 持经审批有效的吊装作业许可证进行高处作业; 4.4.2 作业前,充分了解作业的内容、地点、时间、要求; 4.4.3 熟知作业过程中的危害因素及...
吊装作业许可票
吊装作业许可票_建筑/土木_工程科技_专业资料。吊装作业许可票许可票编号 吊装设备 (杆件)名称 吊装时间 起吊零件重量 序号 1 2 3 4 5 6 7 年月日吨时 ...
2.11.起重吊装作业
2.11.3.1 吊装作业许可证的办理 1)由施工单位指派专人负责办理吊装作业许可证,吊装作业许可证的样表 详见附件。 2)建设(生产)单位、监理公司/管理公司、施工...
吊装作业许可证
吊装作业许可证编号: 工程名称 施工单位 施工地点 作业内容 作业人员姓名 作业...作业人员身体条件符合要求; 2.作业人员着装符合要求; 3.作业人员佩戴安全带; 4...