当前位置:首页 >> 能源/化工 >>

Issue List Review of Venice


Issue List
ID Process Issue Defect Rate Details PHILIPS information Base Tank Top Machine Ton Tank Bottom deviation Filling Cup 1 Molding Top Housing Bottom Housing Front Housing Shot We

ight Base deviation Cycle Time Filling Cup deviation PP1626 plus masterbatch B6-1013 or Masterbatch masterbatch B5-1021 have serious mixed colour while molding Base Added for Base molding have NA 350Ton 180Ton 150Ton 150Ton 100Ton 120Ton 100Ton

NA

464g

100%

28Sec

2

100%

Big part and big surface use masterbatch plus PP could not get even mixed

Issue List of ET
Details Actual value while for ET 380Ton 220Ton 180Ton 200Ton 120Ton 150Ton 120Ton 350Ton Machine can not cover the Tooling 180Ton Machine can not cover the Tooling 150Ton Machine can not cover the Tooling 150Ton Machine can not cover the Tooling 100Ton Machine can not cover the Tooling 120Ton Machine can not cover the Tooling 100Ton Machine can not cover the Tooling Need improve the Sink Mark while submitting PP sample Hot runner Tooling, too short cycle time cause warpage on the gate area Sunway use the minimum Ton machine for ET Root Case Containment Action (if needed)

473g

46Sec

art and big surface use masterbatch could not get even mixed

Masterbatch can not be diffused evenly

Compounding masterbatch and PP Material

Department

Prepared by

Long term action

Owner

Issue Date Due Date

Status

Sunway want Philips to change the quotation information accordingly

Either change the Shot weight or Accept little sink mark product Change cycle time to the Actual time

Compounding masterbatch and PP as standard process


相关文章:
NPI
d.EVT 产后会议 issue review; 讨论 EVT 验证中工厂发现的问题. e.追踪物控 long lead time 物料 risk buy Risk buy list 1.3 DVT stage a.DVT 产前会议...
英国历史与文化_大学英语选修课考试复习
proletarians—the most important political issue....And list their representative work.【William ...(1595),The Merchant of Venice (1598), As You...
OP 5 - Suppliers assessment and review-Issue 4
OP 5 - Suppliers assessment and review-Issue 4_生产/经营管理_经管营销_...Supplier’s status is amended and approved supplier list amended or re-...
剑桥雅思词汇:Word List14
剑桥雅思词汇:Word List14_英语考试_外语学习_教育...s The Merchant of Venice 莎士比亚《威尼斯商人》的...was not sympathetic to the problems of shift ...
高职高专实用英语教程教案Unit_5
and make a list. 1 Practical English for ...g.: She declined to say more about the issue....(Book 1) The Merchant of Venice 《威尼斯商人》...
外贸英语各种信件翻译
information related to the restructuring issue. ...Kindly send us samples and a price list. 3.请...Please review the attached draft contract and let...
实务翻译练习
Venice have long made a mint from the architectural wonders built when they...chang Draft Bank, which in 1823 became the first in China to issue ...
三峡大学研究生入学考试英语专业试题
aspect 8. During our holiday in Venice we went...Concerned with the worldwide pollution problems, ...Choose the right word from the list given below...
揭阳、金中2016届高三下学期开学联考试题(英语)
coffee shop in a neighboring town of Venice. ...way to do something, or to understand an issue...t have on your list because they will only ...
信用证单据条款翻译
5.Packing list in 3-fold showing the gross weight, net weight and ...CREDIT NUMBER 044/3075989 DATE OF ISSUE:001201 EXPIRTY: DATE 010115 PLACE...
更多相关标签: