当前位置:首页 >> 机械/仪表 >>

1.00


Installation on board

MAN B&W DIESEL
Introduction

1. Storage and preservation
The task of appropriate preserving of the engine / engine parts is the responsibility of the engine builder and must be appropriate for the type of transportation, the duration and condition of storage and the prevailing climatic conditions. The responsibility for protecting and maintaining the engine after its arrival rests solely with the yard. It is also responsibility of the yard to check and maintain the preservation spare parts until the ship has been delivered to the ship owner. On arrival to the yard, the engine is to be inspected to verify its condition. Report is to be prepared on this subject. Special attention has to be given when checking the protective covering of such critical parts as crossheads, crankshaft and piston rods. ? Check for damage and check for corrosion, ? Check for proper protection against dirt. The same what is important to check if engine spaces are correctly closed, if all pipes or openings are properly covered: even protection looks good, to open crankcase for inspection. In case of any doubts the engine builder be called. Storage and preservation of assembled engine ? Cases: - Transportation of engine in one unit - Storage of assembled engine on shore - Storage of assembled engine on board until flushing ? The effective method of preservation: de-humidifier ? Periodical turning of crankshaft ? Lubrication of bearings before any turning of crankshaft: - Main bearings - Crosshead bearings - Crankpin bearings, thrust bearing, chain case ? Covering crossheads with special apron

2730/MRA, 2005.01.21 Version 4

1

Installation on board

MAN B&W DIESEL
Introduction

Storage and preservation of engine sections / parts ? They should be protected from damage, corrosion, dirt, dust etc. ? Smaller engine parts, including those delivered on boxes, should be stored indoors (in warehouse). ? Big engine parts (engine sections) preferably to be kept indoor. Alternatively, they can be stored outdoors in specially erected temporary tent or hut. It is recommended to equip such tent or hut with dehumidifier. ? The area close to the slip way or dry dock is not suitable for storage of engine sections due to dusty and dirty atmosphere.

2730/MRA, 2005.01.21 Version 4

2


赞助商链接
相关文章:
法律逻辑学作业一 1
(1.00 分) A. B. C. D. 负概念 非集合概念 普遍概念 集合概念 9."树分为树枝、树叶、树根、树茎"这一划分是( C )。(1.00 分) A. B. C. D....
2015秋形考1
一、题目 1 还未回答 满分 1.00 单项选择题 标记题目 编辑题目 题干 1938 年 10 月,毛泽东在党的六届六中全会上所作的《论新阶段》的报告中第一次使用了...
1.系统总信息
26.00 78.00 0 0 2 8 1 1.00 1.00 是是 传统方法 考虑墙的所有内力贡献 否 传统移动节点方式 钢筋混凝土结构 框架结构 模拟施工加载 3 计算水平风荷载 ...
第三次作业7-9章 1
根据《婚姻法》的规定〃法院准予离婚的标准是( A. 一方是否有过错 B. 夫妻关系破裂 C. 是否就子女的抚养和财产的分割达成一致意见 D. 夫妻感情破裂 )(1.00 ...
eNSPV100R002C00B360版本说明书
eNSPV100R002C00B360版本说明书_计算机硬件及网络_IT/计算机_专业资料。eNSP_V100R002C00B360_版本说明书.doc eNSP V100R001C01B360 版本说明书 文档版本 ...
毕业论文[1]00
毕业论文[1]00_管理学_高等教育_教育专区。企业员工培训方案研究企业是个特殊...第二节 培训理论的研究及发展 1、培训理论的研究 培训管理从某种意义上说,是...
ATV61 71面板操作V1.00c_图文
3.00S Max=999.9 3.5.4 F4 出厂功能是 Quick,即快捷菜单 可通过第页导航键 5 左旋,右旋选择 1-6 菜单,按 F3 进入子菜单,进入子菜 单后可按 F2 ...
用普通计时法表示下面的时间(1)1:00___(2)9:00___(3)23...
解:1:00 是凌晨1时; (2)9:00 是上午9时; (3)23:00 是晚上11时; (4)15:00 是下午3时; 故答案为:凌晨1时,上午9时,晚上11时,下午3时. 解析 解...
会议制度1.00
会议制度1.00 超级完善的会议制度超级完善的会议制度隐藏>> 会议制度 1、目的:为规范公司会议管理,提高工作效率,特制定本制度。 2、适用范围:本制度适用于。 3、...
视频区域布局设计 1.00
视频区域布局设计 1.00_电子/电路_工程科技_专业资料。视频显示区域 视频显示区的布局设计注意: 1 最好能兼容 4:3 和 9:16 的视频显示模式,采用 9:16 的...
更多相关标签: