当前位置:首页 >> 机械/仪表 >>

1.00


Installation on board

MAN B&W DIESEL
Introduction

1. Storage and preservation
The task of appropriate preserving of the engine / engine parts is the respon

sibility of the engine builder and must be appropriate for the type of transportation, the duration and condition of storage and the prevailing climatic conditions. The responsibility for protecting and maintaining the engine after its arrival rests solely with the yard. It is also responsibility of the yard to check and maintain the preservation spare parts until the ship has been delivered to the ship owner. On arrival to the yard, the engine is to be inspected to verify its condition. Report is to be prepared on this subject. Special attention has to be given when checking the protective covering of such critical parts as crossheads, crankshaft and piston rods. ? Check for damage and check for corrosion, ? Check for proper protection against dirt. The same what is important to check if engine spaces are correctly closed, if all pipes or openings are properly covered: even protection looks good, to open crankcase for inspection. In case of any doubts the engine builder be called. Storage and preservation of assembled engine ? Cases: - Transportation of engine in one unit - Storage of assembled engine on shore - Storage of assembled engine on board until flushing ? The effective method of preservation: de-humidifier ? Periodical turning of crankshaft ? Lubrication of bearings before any turning of crankshaft: - Main bearings - Crosshead bearings - Crankpin bearings, thrust bearing, chain case ? Covering crossheads with special apron

2730/MRA, 2005.01.21 Version 4

1

Installation on board

MAN B&W DIESEL
Introduction

Storage and preservation of engine sections / parts ? They should be protected from damage, corrosion, dirt, dust etc. ? Smaller engine parts, including those delivered on boxes, should be stored indoors (in warehouse). ? Big engine parts (engine sections) preferably to be kept indoor. Alternatively, they can be stored outdoors in specially erected temporary tent or hut. It is recommended to equip such tent or hut with dehumidifier. ? The area close to the slip way or dry dock is not suitable for storage of engine sections due to dusty and dirty atmosphere.

2730/MRA, 2005.01.21 Version 4

2


相关文章:
1.00 概述
1.00 概述1.00 概述隐藏>> 安装工程施工技术交底实例手册 目录 第一章 概述 第二章 管道安装工程技术交底 2.1 室内给水管道安装技术交底 2.2 室内排水管道安装...
党员快速入门操作手册V1.00(20160127)_图文
党员快速入门操作手册V1.00(20160127)_党团建设_党团工作_实用文档。福建省党员 教育管理综合服务平台 快速学习手册(使用对象:党员、预备党员) 福建省委组织部 ...
门禁控制器用户说明书V1.00
门禁控制器用户说明书V1.00_互联网_IT/计算机_专业资料。声明一:本说明书中若有未特殊说明的部分,该部分内容适合所有型号产品。 声明二:本说明书进行修改或更新...
SP110调试指南1.00a_图文
SP110 调试指南(V1.00a) SP110 调试指南注:此调试我们主要针对于多泵控制和其它应用特殊功能,简单的启停调速控制与单泵控制只做了简 单介绍,具体请参考说明书...
数学建模作业一:半时与全...
因为每个半时服务员必须连续工作 4 小时,所以可设半时服务员中从 9:00,10:00,11:00,12:00,1:00 开始工作的半时服务员分别有 y1,y2,y3,y4,y5 名。...
(主)GFM-1021-bdk6A1.00(乙级)-1
门的整体外形结构 填表日期:2011 年 7 月 12 日 备注 钢质隔热防火门/GFM-1021-bdk6A1.00(乙级)-1 简要描述 1、门的整体外形结构:外形尺寸:1080mm×2140...
(1)1.00 L 1.00 mol·L-1 H2SO4溶液与2.00 L 1.00 mol...
(1)1.00 L 1.00 mol·L-1 H2SO4溶液与2.00 L 1.00 mol·L-1 NaOH溶液完全反应,放出114.6 kJ热量,表示生成1 mol H2O的热化学方程式为___ (2)在...
2015年会策划方案(1.00)
2015年会策划方案(1.00)_营销/活动策划_计划/解决方案_实用文档。年会2015 年会策划方案一、 年会主题: 总结2014,让各部门同事更好地了解公司整体动态与发展方向。...
整理好——(1:00-3:00)期中考试复习(一)曲线与航天
整理好——(1:00-3:00)期中考试复习(一)曲线与航天_理化生_高中教育_教育专区。期中考试复习(一)曲线与航天 1.如图为运动员抛出的铅球运动轨迹(铅球视为质点...
电子物料编码规则V1.00
电子物料编码规则V1.00_电子/电路_工程科技_专业资料。公司电子物料编码规则 深圳海极光科技有限公司电子物料编码规则(第 1 页/共 8 页) 电子物料编码规则 V1....
更多相关标签:
1.00是多少钱 | 0.00 | 1 | 10.00 | 2.00 | 100 | 1.0 | 5 |