当前位置:首页 >> 机械/仪表 >>

1.00


Installation on board

MAN B&W DIESEL
Introduction

1. Storage and preservation
The task of appropriate preserving of the engine / engine parts is the respon

sibility of the engine builder and must be appropriate for the type of transportation, the duration and condition of storage and the prevailing climatic conditions. The responsibility for protecting and maintaining the engine after its arrival rests solely with the yard. It is also responsibility of the yard to check and maintain the preservation spare parts until the ship has been delivered to the ship owner. On arrival to the yard, the engine is to be inspected to verify its condition. Report is to be prepared on this subject. Special attention has to be given when checking the protective covering of such critical parts as crossheads, crankshaft and piston rods. ? Check for damage and check for corrosion, ? Check for proper protection against dirt. The same what is important to check if engine spaces are correctly closed, if all pipes or openings are properly covered: even protection looks good, to open crankcase for inspection. In case of any doubts the engine builder be called. Storage and preservation of assembled engine ? Cases: - Transportation of engine in one unit - Storage of assembled engine on shore - Storage of assembled engine on board until flushing ? The effective method of preservation: de-humidifier ? Periodical turning of crankshaft ? Lubrication of bearings before any turning of crankshaft: - Main bearings - Crosshead bearings - Crankpin bearings, thrust bearing, chain case ? Covering crossheads with special apron

2730/MRA, 2005.01.21 Version 4

1

Installation on board

MAN B&W DIESEL
Introduction

Storage and preservation of engine sections / parts ? They should be protected from damage, corrosion, dirt, dust etc. ? Smaller engine parts, including those delivered on boxes, should be stored indoors (in warehouse). ? Big engine parts (engine sections) preferably to be kept indoor. Alternatively, they can be stored outdoors in specially erected temporary tent or hut. It is recommended to equip such tent or hut with dehumidifier. ? The area close to the slip way or dry dock is not suitable for storage of engine sections due to dusty and dirty atmosphere.

2730/MRA, 2005.01.21 Version 4

2


相关文章:
用普通计时法表示下面的时间(1)1:00___(2)9:00___(3)23...
解:1:00 是凌晨1时; (2)9:00 是上午9时; (3)23:00 是晚上11时; (4)15:00 是下午3时; 故答案为:凌晨1时,上午9时,晚上11时,下午3时. 解析 解...
(主)GFM-1021-bdk6A1.00(乙级)-1
门的整体外形结构 填表日期:2011 年 7 月 12 日 备注 钢质隔热防火门/GFM-1021-bdk6A1.00(乙级)-1 简要描述 1、门的整体外形结构:外形尺寸:1080mm×2140...
整理好——(1:00-3:00)期中考试复习(一)曲线与航天
整理好——(1:00-3:00)期中考试复习(一)曲线与航天_理化生_高中教育_教育专区。期中考试复习(一)曲线与航天 1.如图为运动员抛出的铅球运动轨迹(铅球视为质点...
高分子概论部分习题及答案v1.00(α内测版)
高分子概论部分习题及答案v1.00(α内测版)_哲学_高等教育_教育专区。一、 1、在表 1-2 中单体一栏写出相应单体的中文名称。 (书 9-10) 2、写出英文缩写为...
LTE系统维护手册1.00.02
大唐移动通信设备有限公司 LTE 系统维护手册 LTE 系统维护手册 项目名称 文档编号 版本号作者 LTE 系统测试项目 DTM4.600.774 V1.00.00 李石 版权所有 大唐移动...
数学建模作业一:半时与全...
因为每个半时服务员必须连续工作 4 小时,所以可设半时服务员中从 9:00,10:00,11:00,12:00,1:00 开始工作的半时服务员分别有 y1,y2,y3,y4,y5 名。...
电子物料编码规则V1.00
电子物料编码规则V1.00_电子/电路_工程科技_专业资料。公司电子物料编码规则 深圳海极光科技有限公司电子物料编码规则(第 1 页/共 8 页) 电子物料编码规则 V1....
药监操作手册V1.00
药监操作手册V1.00药监操作手册V1.00隐藏>> 药品电子监管系统操作说明 V1.00...大小:1.61MB 所需财富值:1 加入会员!获取文档下载券 登录百度文库,专享文档复...
北京礼拜时间 2013-1-00到2-30
北京礼拜时间 2013-1-00到2-30_法律资料_人文社科_专业资料。北京礼拜时间 2013-1-00到2-30Day Fajr Sunrise Dhuhr Asr SunsetMaghrib Isha Jan 23 2013 Rabe...
党员快速入门操作手册V1.00(20160127)_图文
党员快速入门操作手册V1.00(20160127)_党团建设_党团工作_实用文档。福建省党员 教育管理综合服务平台 快速学习手册(使用对象:党员、预备党员) 福建省委组织部 ...
更多相关标签:
1.00是多少钱 | 0.00 | 1 | 10.00 | 2.00 | 100 | 1.0 | 5 |