APPENDIX-4-DATA SHEET FOR SEPARATORS


A1 REV.

Dec 09, 2014 DATE

FIRST ISSUE
DESCRIPTION

AKH PREP

PNN CHEC

IAD APP

CC ENERGY DEVELOPMENT S.A.L (Oman Branch)

TETHYS OIL AB
PROJECT

INSTALLATION OF PARALLEL TRAIN IN SAIWAN AND FARHA STATIONS
TITLE

DATA SHEET FOR SEPARATORS 200-VS-001B AND 201-VS-001 B & C
JOB NR. DOCUMENT NR. REV. DATE SHEET

JS1034

JS1034-XX-J02-0001

A1

Dec 09, 2014

1

of

6

CC ENERGY DEVELOPMENT S.A.L (Oman Branch)

PROJECT

TETHYS OIL AB
JOB NR. DOCUMENT NR. REV.

INSTALLATION OF PARALLEL TRAIN IN SAIWAN AND FARHA STATIONS
DATE SHEET

JS1034
TITLE

JS1034-XX-J02-0001

A1

Dec 09, 2014

2

of

6

DATA SHEET FOR SEPARATORS 200-VS-001B AND 201-VS-001 B & C
Sheet Nr.

Denomination Cover Sheet Index Content Content Content Content
A1 A1 A1 A1 A1 A1

Revision

Sheet Nr.

Denomination

Revision

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50

CC ENERGY DEVELOPMENT S.A.L (Oman Branch)
TETHYS OIL AB
JOB NR. DOCUMENT NR.

PROJECT

INSTALLATION OF PARALLEL TRAIN IN SAIWAN AND FARHA STATIONS

REV.

DATE

SHEET

JS1034
TITLE

JS1034-XX-J02-0001

A1

Dec 09, 2014

3

of

6

DATA SHEET FOR SEPARATORS 200-VS-001B AND 201-VS-001 B & C
DESIGN DATA
SERVICE MANUFACTURER DESIGN CODE DESIGN TEMPERATURE OPERATING TEMPERATURE OPERATING PRESSURE MAX ALLOWABLE WORKING PRESSURE INTERNALS WORKING CAPACITY INTERNAL DIAMETER EXTERNAL DESIGN PRESSURE MIN DESIGN METAL TEMPERATURE FLUID TYPE LETHAL FLUID FLUID DENSITY AT OPERATING CONDITION INTERNAL PAINTING THERMAL INSULATION (NOTE 3) FIREPROOFING INSULATION ELEVATION ABOVE GROUND DESIGN WIND SPEED MIN 45 H 2,100 NOT APPLICABLE 0 CRUDE OIL YES CAUSTIC FLUID MIN / NORM / MAX YES (NOTE 4) C YES m m/s PP NO HEADS TYPE EARTHQUAKE ZONE NO YES m3 mm bar g ° C MIN / NORM / MAX MIN / NORM / MAX barg NO ASME VIII, Div.1 82 ° C NOTE 1 ITEM P.O. NO ASME STAMP DESIGN PRESSURE / / 20 5 / / AS PER CODE YES 33.6 9,000 NOT APPLICABLE 8 YES (NOTE 6) H2S / EXTERNAL PAINTING INSULATION THICKNESS FIREPROOFING THICKNESS ELL. 2:1 N.A. PWHT SOIL COEFF. YES N.A. NO PARTIAL PRESSURE 850.7 / YES N.A. / NO mm mm bar kg/m
3

NOTE 2

YES 8

NO barg ° C barg barg

HYDROSTATIC TEST PRESSURE DAVIT FOR MANHOLE GROSS CAPACITY LENGTH / HEIGHT (T/T) AT A TEMPERATURE OF AT A PRESSURE OF SOUR SERVICE YES

NO m3 mm ° C barg

MATERIALS
SHELL HEADS FORGINGS INTERNALS FLANGES / PIPES DUPLEX / SS (NOTE 5) SA-105 / SA-106 GR.B SHELL THICKNESS CORROSION ALLOW . CLADDING THK. M T Q M T Q Nm N N ERECTION mm mm mm (NOTE 7) 3 N.A LOADS AT SUPPORT BASE OPERATING TEST HEAD (NOTE 7) 3 N.A PWHT TEMPERATURE IMPACT TESTING RADIOGRAPHY EXAMIN. ULTRASONIC EXAMIN. MAGNETIC / DYE EXAMIN. PMI YES AS PER CODE AS PER CODE AS PER CODE YES NO NO % % % ° C SHELL HEAD SA-516-60 or Gr 70 SA-516-60 or Gr 70 INTER / EXTER ATTACH. CLIPS STUD BOLTS / NUTS SKIRT / SADDLE / LEGS REINFORCED PAD INTERNAL COILS CS A193-B7 / A194-2H CS SA-516-60 or Gr 70 N.A. JOINT EFFIC. 1.0 1.0 X RAY EFFIC. 100% 100%

NOTES
1. 2. 3. 4. 5 6 7 DATA SHEET REFERS TO FARHA AND SAIWAN SEPARATORS THE SEPARATORS COVERED BY THIS SPECIFICATION HAVE THE FOLLOWING TAG NUMBERS: 200-VS-001B, 201-VS-001 B & C SEPARATORS (3 NOS) H = HOT INSULATION ; C = COLD INSULATION ; PP = PERSONAL PROTECTION INTERNALLY EPOXY COATED REMOVABLE INTERNALS IN CONTACT WITH LIQUID SHALL BE MIN. DUPLEX; INTERNALS IN CONTACT WITH GAS SHALL BE MIN. SS316L MATERIAL TO COMPLY WITH NACE MR0175 VENDOR TO ADVISE

CC ENERGY DEVELOPMENT S.A.L (Oman Branch)

PROJECT

INSTALLATION OF PARALLEL TRAIN IN SAIWAN AND FARHA STATIONS
REV.
DATE SHEET

TETHYS OIL AB
JOB NR. DOCUMENT NR.

JS1034
TITLE

JS1034-XX-J02-0001

A1

Dec 09, 2014

4

of

6

DATA SHEET FOR SEPARATORS 200-VS-001B AND 201-VS-001 B & C
PAINTING APPLICATION
INTERNAL PAINTING CYCLE EXTERNAL PAINTING CYCLE SYSTEM 3 AS PER JS1006-G02-0003 SYSTEM 1 AS PER JS1006-G02-0003

ESTIMATED VESSEL WEIGHTS
EMPTY OPERATING kg kg SHOP TEST SHIPPING kg kg

NOZZLES
MARK NO. N1 N2 N3 N4 N5 N6 N7 A/B N8 A/B/C SIZE NPS, in. 10" 6" 4" 6" HOLD 2" 4" 2" RATING ASME 150# 150# 150# 150# 150# 300# 150# 150# W N-RF W N-RF W N-RF W N-RF W N-RF W N-RF W N-RF W N-RF FEED INLET OIL OUTLET GAS OUTLET WATER OUTLET PSV UTILITY CONNECTION SPARE (BLINDED) DRAIN CONNECTION TYPE SERVICE PIPE SCHEDULE ORIENTATION N = 0 deg PROJECTION FROM VESSEL C.L.

CN1 CN2 CN3 CN4 CN5 CN6 A/B CN7 CN8 CN9A/B

2" 2" 2" 4" 4" 2" 4" 4" 2"

300# 300# 300# 300# 300# 300# 300# 300# 300#

W N-RF W N-RF W N-RF W N-RF W N-RF W N-RF W N-RF W N-RF W N-RF

PRESSURE GAUGE PRESSURE TRANSMITTER TEMPERATURE GAUGE INTERF. LEVEL TRANSMITTER (LL) INTERFACE LEV. TRANS. (CONTR.) INTERFACE LEVEL GAUGE OIL LEVEL TRANSMITTER (HH/LL) OIL LEVEL TRANSMITTER (CONTR.) OIL LEVEL GAUGE

M1 M2

24" 24"

150# 150#

W N-RF W N-RF

MANHOLE WITH COVER & DAVIT MANHOLE WITH COVER & DAVIT

NOTES

CC ENERGY DEVELOPMENT S.A.L (Oman Branch)

PROJECT

INSTALLATION OF PARALLEL TRAIN IN SAIWAN AND FARHA STATIONS
REV.
DATE SHEET

TETHYS OIL AB
JOB NR. DOCUMENT NR.

JS1034
TITLE

JS1034-XX-J02-0001

A1

Dec 09, 2014

5

of

6

DATA SHEET FOR SEPARATORS 200-VS-001B AND 201-VS-001 B & C
VESSEL SKETCH

CC ENERGY DEVELOPMENT S.A.L (Oman Branch)

PROJECT

INSTALLATION OF PARALLEL TRAIN IN SAIWAN AND FARHA STATIONS
REV.
DATE SHEET

TETHYS OIL AB
JOB NR. DOCUMENT NR.

JS1034
TITLE

JS1034-XX-J02-0001

A1

Dec 09, 2014

6

of

6

DATA SHEET FOR SEPARATORS 200-VS-001B AND 201-VS-001 B & C
GENERAL REMARKS
8 9 10 11 12 13 VORTEX BREAKERS ON OIL AND ON WATER TO BE PROVIDED AS PER PIP No VEFV1124M INTERNAL LADDERS FOR MANHOLES TO BE PROVIDED AS PER PIP No VEFV1125M SUPPORTS FOR INLET DEVICE AND DEMISTER TO BE PROVIDED IMPINGMENT PLATE, INLET ELBOW ,WEIR AND WIREMESH DEMISTER TO BE DESIGNED AND PROVIDED BY VENDOR DUPLEX CALMING PIPE FOR LEVEL TRANSMITTER NOZZLES AS SHOWN IN THE SKETCH TO BE PROVIDED DATA RELEVANT TO FEED FLOWRATE AND CHARACTERISTICS ARE THE FOLLOW ING: GAS FEED FLOWRATE: LIQUID FEED FLOW RATE: WATER FEED FLOWRATE GAS DENSITY: GAS VISCOSITY: LIQUID DENSITY: LIQUID VISCOSITY: WATER DENSITY WATER VISCOSITY TURNDOWN: 2,771 kg/h 43,091 kg/h 50,420 kg/h 6.1 kg/m3 0.011 cP 851 kg/m3 4 cP 1100 kg/m3 0.7 cP 10%

14 15 16

VESSELS SHALL BE SUPPORTED BY SADDLES. VENDOR SHALL DESIGN SADDLE SUPPORTS FOLLOWING, AS GUIDELINE, PIP No VEFV1105M. FABRICATION TOLLERANCES SHALL BE AS INDICATED IN THE PIP No VEFV1102M. FOR INSPECTION AND TEST REQUIREMENT SEE M.R. No JS1034-XX-JMR-0001

17 EACH SEPATORS SHALL BE PROVIDED AS SKID-MOUNTED UNIT COMPLETE, WITH ON-SKID PIPING, VALVES, FITTING AND INSTRUMENTATIONS AS SHOW N IN THE P&ID. 18 19 20 21 22 SUPPLIER TO SIZE INTERNALS OF SEPARATOR RELIEF VALVE WITH ASSOCIATED PIPE (INLET & OUTLET PIPE) TO BE SIZED BY SUPPLIER. RELIEF VALVE TO BE, N+N OPERATING MODE CONFIGURATION ALL RELIEF VALVE TO BE BALANCE BELLOWS TYPE. SUPPLIER TO CONSIDER THE VESSEL FOR OIL, WATER & GAS DIMENSION PROVIDED IN THE SHEET AND WORK OUT THE RATED CAPACITY FOR OIL, WATER & GAS BASED ON OFFERED INTERNALS, NOZZELS AND CONTROL VALVES.



相关文章:
APPENDIX COVER SHEETS
APPENDIX-3 TECHNICAL SPECIFICATION (Doc no: JS1034-XX-J01-0001) APPENDIX-4 MECHANICAL DATA SHEETS (Doc no: JS1034-XX-J02-0001) APPENDIX-5 TABLE OF...
Appendix 1 List of process flexibles
Appendix 1 List of process flexibles_法律资料_...DATA SHEET OF FLEXIBLE HOUSE 项目名称 PROJECT ...4-01-Sh1 1 2 1 2 2″-P-650203-IS3162-...
教学设计范例(英语)
(see Appendix II) 3) Students’ role-play performances are assessed by the pair work evaluation sheet. (see Appendix III) 4) Students’ comprehending ...
Appendix 9 Cash Flows of MBS
BALANCE SHEET 3页 1下载券 [企业会计]财务分析...Appendix 9 Cash Flows of MBS How to compute ...(4) becomes (4) CPRn = 6% * min(1, n/30...
Appendix 35 (300 pcs FOE 704-05)
Appendix # 35 / Приложение№ 35...02?ноября 2012 года sheet 2 of 3...4) There is the size of circular dark spots ...
ASNZS 2088-2009 standard reference sheet for testing
47页 4下载券A​S​N​Z​S​ ​2​0​8​8​-​2...(a) Examples of projections include — 27th March 2013 Appendix Comments a...
技术协议中常用单词
技术协议中常用单词 Appendix n.附录, Attachment n...提交, 递交 slurry pump 淤浆泵 料浆泵 4 ...PDS….Procurement Data Sheet 采购数据表 PDP ...
捷通MSDS申请表
2. 3. 4. 5. 6. 7. 8. 9. 10. Physical...Data Sheet (MSDS)” Service Application Form 宁波...Appendix 1 附录 1 (此页内容如能填最好,填写不...
Dimmable driver product test process
process 可调光驱动器产品的测试流程 Appendix 4-----Dimming function test data record sheet (English Version) 附录 4------调光功能测试记录表格(英文版本...
商务沟通14-18
Appendices 附件 ?The appendix section is where ... A resume (also called a data sheet or a ...阅读 page 216-217 Sample 17-3, 17-4, 17-5...
更多相关标签: