当前位置:首页 >> 能源/化工 >>

APPENDIX-4-DATA SHEET FOR SEPARATORS


A1 REV.

Dec 09, 2014 DATE

FIRST ISSUE
DESCRIPTION

AKH PREP

PNN CHEC

IAD APP

CC ENERGY DEVELOPMENT S.A.L (Oman Branch)

TETHYS OIL AB
PROJECT

INSTALLATION OF PARALLEL TRAIN IN SAIWAN AND FARHA STATIONS
TITLE

DATA SHEET FOR SEPARATORS 200-VS-001B AND 201-VS-001 B & C
JOB NR. DOCUMENT NR. REV. DATE SHEET

JS1034

JS1034-XX-J02-0001

A1

Dec 09, 2014

1

of

6

CC ENERGY DEVELOPMENT S.A.L (Oman Branch)

PROJECT

TETHYS OIL AB
JOB NR. DOCUMENT NR. REV.

INSTALLATION OF PARALLEL TRAIN IN SAIWAN AND FARHA STATIONS
DATE SHEET

JS1034
TITLE

JS1034-XX-J02-0001

A1

Dec 09, 2014

2

of

6

DATA SHEET FOR SEPARATORS 200-VS-001B AND 201-VS-001 B & C
Sheet Nr.

Denomination Cover Sheet Index Content Content Content Content
A1 A1 A1 A1 A1 A1

Revision

Sheet Nr.

Denomination

Revision

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50

CC ENERGY DEVELOPMENT S.A.L (Oman Branch)
TETHYS OIL AB
JOB NR. DOCUMENT NR.

PROJECT

INSTALLATION OF PARALLEL TRAIN IN SAIWAN AND FARHA STATIONS

REV.

DATE

SHEET

JS1034
TITLE

JS1034-XX-J02-0001

A1

Dec 09, 2014

3

of

6

DATA SHEET FOR SEPARATORS 200-VS-001B AND 201-VS-001 B & C
DESIGN DATA
SERVICE MANUFACTURER DESIGN CODE DESIGN TEMPERATURE OPERATING TEMPERATURE OPERATING PRESSURE MAX ALLOWABLE WORKING PRESSURE INTERNALS WORKING CAPACITY INTERNAL DIAMETER EXTERNAL DESIGN PRESSURE MIN DESIGN METAL TEMPERATURE FLUID TYPE LETHAL FLUID FLUID DENSITY AT OPERATING CONDITION INTERNAL PAINTING THERMAL INSULATION (NOTE 3) FIREPROOFING INSULATION ELEVATION ABOVE GROUND DESIGN WIND SPEED MIN 45 H 2,100 NOT APPLICABLE 0 CRUDE OIL YES CAUSTIC FLUID MIN / NORM / MAX YES (NOTE 4) C YES m m/s PP NO HEADS TYPE EARTHQUAKE ZONE NO YES m3 mm bar g ° C MIN / NORM / MAX MIN / NORM / MAX barg NO ASME VIII, Div.1 82 ° C NOTE 1 ITEM P.O. NO ASME STAMP DESIGN PRESSURE / / 20 5 / / AS PER CODE YES 33.6 9,000 NOT APPLICABLE 8 YES (NOTE 6) H2S / EXTERNAL PAINTING INSULATION THICKNESS FIREPROOFING THICKNESS ELL. 2:1 N.A. PWHT SOIL COEFF. YES N.A. NO PARTIAL PRESSURE 850.7 / YES N.A. / NO mm mm bar kg/m
3

NOTE 2

YES 8

NO barg ° C barg barg

HYDROSTATIC TEST PRESSURE DAVIT FOR MANHOLE GROSS CAPACITY LENGTH / HEIGHT (T/T) AT A TEMPERATURE OF AT A PRESSURE OF SOUR SERVICE YES

NO m3 mm ° C barg

MATERIALS
SHELL HEADS FORGINGS INTERNALS FLANGES / PIPES DUPLEX / SS (NOTE 5) SA-105 / SA-106 GR.B SHELL THICKNESS CORROSION ALLOW . CLADDING THK. M T Q M T Q Nm N N ERECTION mm mm mm (NOTE 7) 3 N.A LOADS AT SUPPORT BASE OPERATING TEST HEAD (NOTE 7) 3 N.A PWHT TEMPERATURE IMPACT TESTING RADIOGRAPHY EXAMIN. ULTRASONIC EXAMIN. MAGNETIC / DYE EXAMIN. PMI YES AS PER CODE AS PER CODE AS PER CODE YES NO NO % % % ° C SHELL HEAD SA-516-60 or Gr 70 SA-516-60 or Gr 70 INTER / EXTER ATTACH. CLIPS STUD BOLTS / NUTS SKIRT / SADDLE / LEGS REINFORCED PAD INTERNAL COILS CS A193-B7 / A194-2H CS SA-516-60 or Gr 70 N.A. JOINT EFFIC. 1.0 1.0 X RAY EFFIC. 100% 100%

NOTES
1. 2. 3. 4. 5 6 7 DATA SHEET REFERS TO FARHA AND SAIWAN SEPARATORS THE SEPARATORS COVERED BY THIS SPECIFICATION HAVE THE FOLLOWING TAG NUMBERS: 200-VS-001B, 201-VS-001 B & C SEPARATORS (3 NOS) H = HOT INSULATION ; C = COLD INSULATION ; PP = PERSONAL PROTECTION INTERNALLY EPOXY COATED REMOVABLE INTERNALS IN CONTACT WITH LIQUID SHALL BE MIN. DUPLEX; INTERNALS IN CONTACT WITH GAS SHALL BE MIN. SS316L MATERIAL TO COMPLY WITH NACE MR0175 VENDOR TO ADVISE

CC ENERGY DEVELOPMENT S.A.L (Oman Branch)

PROJECT

INSTALLATION OF PARALLEL TRAIN IN SAIWAN AND FARHA STATIONS
REV.
DATE SHEET

TETHYS OIL AB
JOB NR. DOCUMENT NR.

JS1034
TITLE

JS1034-XX-J02-0001

A1

Dec 09, 2014

4

of

6

DATA SHEET FOR SEPARATORS 200-VS-001B AND 201-VS-001 B & C
PAINTING APPLICATION
INTERNAL PAINTING CYCLE EXTERNAL PAINTING CYCLE SYSTEM 3 AS PER JS1006-G02-0003 SYSTEM 1 AS PER JS1006-G02-0003

ESTIMATED VESSEL WEIGHTS
EMPTY OPERATING kg kg SHOP TEST SHIPPING kg kg

NOZZLES
MARK NO. N1 N2 N3 N4 N5 N6 N7 A/B N8 A/B/C SIZE NPS, in. 10" 6" 4" 6" HOLD 2" 4" 2" RATING ASME 150# 150# 150# 150# 150# 300# 150# 150# W N-RF W N-RF W N-RF W N-RF W N-RF W N-RF W N-RF W N-RF FEED INLET OIL OUTLET GAS OUTLET WATER OUTLET PSV UTILITY CONNECTION SPARE (BLINDED) DRAIN CONNECTION TYPE SERVICE PIPE SCHEDULE ORIENTATION N = 0 deg PROJECTION FROM VESSEL C.L.

CN1 CN2 CN3 CN4 CN5 CN6 A/B CN7 CN8 CN9A/B

2" 2" 2" 4" 4" 2" 4" 4" 2"

300# 300# 300# 300# 300# 300# 300# 300# 300#

W N-RF W N-RF W N-RF W N-RF W N-RF W N-RF W N-RF W N-RF W N-RF

PRESSURE GAUGE PRESSURE TRANSMITTER TEMPERATURE GAUGE INTERF. LEVEL TRANSMITTER (LL) INTERFACE LEV. TRANS. (CONTR.) INTERFACE LEVEL GAUGE OIL LEVEL TRANSMITTER (HH/LL) OIL LEVEL TRANSMITTER (CONTR.) OIL LEVEL GAUGE

M1 M2

24" 24"

150# 150#

W N-RF W N-RF

MANHOLE WITH COVER & DAVIT MANHOLE WITH COVER & DAVIT

NOTES

CC ENERGY DEVELOPMENT S.A.L (Oman Branch)

PROJECT

INSTALLATION OF PARALLEL TRAIN IN SAIWAN AND FARHA STATIONS
REV.
DATE SHEET

TETHYS OIL AB
JOB NR. DOCUMENT NR.

JS1034
TITLE

JS1034-XX-J02-0001

A1

Dec 09, 2014

5

of

6

DATA SHEET FOR SEPARATORS 200-VS-001B AND 201-VS-001 B & C
VESSEL SKETCH

CC ENERGY DEVELOPMENT S.A.L (Oman Branch)

PROJECT

INSTALLATION OF PARALLEL TRAIN IN SAIWAN AND FARHA STATIONS
REV.
DATE SHEET

TETHYS OIL AB
JOB NR. DOCUMENT NR.

JS1034
TITLE

JS1034-XX-J02-0001

A1

Dec 09, 2014

6

of

6

DATA SHEET FOR SEPARATORS 200-VS-001B AND 201-VS-001 B & C
GENERAL REMARKS
8 9 10 11 12 13 VORTEX BREAKERS ON OIL AND ON WATER TO BE PROVIDED AS PER PIP No VEFV1124M INTERNAL LADDERS FOR MANHOLES TO BE PROVIDED AS PER PIP No VEFV1125M SUPPORTS FOR INLET DEVICE AND DEMISTER TO BE PROVIDED IMPINGMENT PLATE, INLET ELBOW ,WEIR AND WIREMESH DEMISTER TO BE DESIGNED AND PROVIDED BY VENDOR DUPLEX CALMING PIPE FOR LEVEL TRANSMITTER NOZZLES AS SHOWN IN THE SKETCH TO BE PROVIDED DATA RELEVANT TO FEED FLOWRATE AND CHARACTERISTICS ARE THE FOLLOW ING: GAS FEED FLOWRATE: LIQUID FEED FLOW RATE: WATER FEED FLOWRATE GAS DENSITY: GAS VISCOSITY: LIQUID DENSITY: LIQUID VISCOSITY: WATER DENSITY WATER VISCOSITY TURNDOWN: 2,771 kg/h 43,091 kg/h 50,420 kg/h 6.1 kg/m3 0.011 cP 851 kg/m3 4 cP 1100 kg/m3 0.7 cP 10%

14 15 16

VESSELS SHALL BE SUPPORTED BY SADDLES. VENDOR SHALL DESIGN SADDLE SUPPORTS FOLLOWING, AS GUIDELINE, PIP No VEFV1105M. FABRICATION TOLLERANCES SHALL BE AS INDICATED IN THE PIP No VEFV1102M. FOR INSPECTION AND TEST REQUIREMENT SEE M.R. No JS1034-XX-JMR-0001

17 EACH SEPATORS SHALL BE PROVIDED AS SKID-MOUNTED UNIT COMPLETE, WITH ON-SKID PIPING, VALVES, FITTING AND INSTRUMENTATIONS AS SHOW N IN THE P&ID. 18 19 20 21 22 SUPPLIER TO SIZE INTERNALS OF SEPARATOR RELIEF VALVE WITH ASSOCIATED PIPE (INLET & OUTLET PIPE) TO BE SIZED BY SUPPLIER. RELIEF VALVE TO BE, N+N OPERATING MODE CONFIGURATION ALL RELIEF VALVE TO BE BALANCE BELLOWS TYPE. SUPPLIER TO CONSIDER THE VESSEL FOR OIL, WATER & GAS DIMENSION PROVIDED IN THE SHEET AND WORK OUT THE RATED CAPACITY FOR OIL, WATER & GAS BASED ON OFFERED INTERNALS, NOZZELS AND CONTROL VALVES.


相关文章:
A1 - Appendix 1 Tenderer Data Sheet
A1 - Appendix 1 Tenderer Data Sheet_能源/化工_工程科技_专业资料。)?? ...Separators Agent / locally registered branch office / Omani LLC / foreign ...
Data Sheet-for MIMX30_图文
Data Sheet-for MIMX30_电子/电路_工程科技_专业资料。TEST DATA SHEET FOR ...(V) = Refer to appendix ; Pn W = ; In mA = ; ; Observation: 4....
术语-1,编制说明,081023
3rd Edition appendix b design data sheet for vessels “Contents” Often ...(4)EN 764-1:2004, Pressure equipment- Part 1: Terminology-Pressure, ...
APPENDIX-1 - Quality requirements - Instructions to...
APPENDIX-1 - Quality requirements - Instructions ...REV. DATE SHEET 4 of 9 JS1034 TITLE JS1034-...The minimum requested information/data are the ...
BS 1363 BS plug PS datasheet
BS 1363 BS plug PS datasheet_信息与通信_工程...Tested by: Appendix page S11060902- Checke...See fig.4. Sleeves shall not fitted to any ...
VDA_Volume_2_Appendix_5_-PPA_cover_sheet
VDA_Volume_2_Appendix_5_-PPA_cover_sheet_广告/... 1 2 3 4 5 6 7 Valid until Telephone: Fax...The IMDS data-set has been drawn up under IMDS...
VDA_Volume_2_Appendix_5_-PPA_test_results
VDA_Volume_2_Appendix_5_-PPA_test_results_法律资料_人文社科_专业资料。...7 Material datasheet / IMDS ? 8 Software testreport ? 9 Process FMEA ?...
压力容器工程规范(中英文对照)
运输 Appendix A: Tolerance for Pressure Vessels 附 A:压力容器允许偏差 1. ...(4) Nozzle list (conforming to Purchaser’s drawings or data sheet) 设备...
华硕笔记本电路图纸.宏基AppendixD笔记本电路
华硕笔记本电路图纸.宏基AppendixD笔记本电路_教学案例/设计_教学研究_教育专区。5...4 3 2 Engineer: Marco Chen Rev 2.1 63 A6Jc Sheet 1 1 of 5 4 3 ...
投标术语
appendix 工厂交货价 Ex works, Ex factory, or Off the Shelf, EXW 工程...data sheet, tendering data sheet 招投标范围 scope of bid 争端解决 ...
更多相关标签: